HomeGrid ModernizationM03632Evidence
Topic/Matter Intersection

Topic:"Grid Modernization" in M03632

Matter: BRD-E-R-10 - Renewable Energy Community Feed-in Tariffs (COMFIT)see also M04523
9 passages 8 documents

Grid Modernization across all matters →

B-1Proposed Tariffs - Amended March 2, 2011 2/28/2011 1 passage
Trigen Energy Canada Inc. August 1997 – June 2001
Trigen Energy Canada Inc. August 1997 – June 2001 London, Ontario President - Supervised operations of two district energy systems with combined annual revenues of $14M, and 50 employees - Responsible for the results of the operations, fro...

AI summary Trigen Energy Canada Inc. managed district energy systems, improving financial performance from negative to positive cash flow. Operations included EHS policy implementation, permitting, and due diligence. Susan Shaw's roles focused on EHS compliance, efficiency metrics, and business development.

B-3 -(i)Direct Testimony and Exhibits of Moses Coady, on behalf of St. Francis Xavier University 3/17/2011 1 passage
Summary & Overview p. p. 0
Summary & Overview St. Francis Xavier University (STFX) is a leading Canadian undergraduate university located at Antigonish, Nova Scotia. The STFX campus is heated by a central heating plant which is located at the center of the lower cam...

AI summary St. Francis Xavier University (STFX) seeks to replace its aging central heating plant with a Combined Heat and Power Biomass (CH&PB) facility. The current 90-year-old plant uses bunker C and fish oil, while the proposed CH&PB requires a Comfit rate of 21.3 cents/kWh to achieve a 13% return on equity. STFX cites a 2009 CBCL analysis and adjusted Synapse's 2011 assumptions to support this rate, aiming to leverage a Community Feed-in Tariff for feasibility.

B-14Evidence filed on behalf of Ecology Action Centre 3/25/2011 1 passage
Evidence as Prepared by E3 Analytics p. p. 8
sh to be considered by the Board at a later date to ensure a wider diversity of projects is developed under the COMFIT. However, it should be recalled that limits in any form also create uncertainty. 17. Greater transparency as to the stat...

AI summary The text emphasizes the importance of transparency and clarity in grid access rules for the success of the COMFIT program. It highlights that delays in grid interconnection can deter investors and increase project risks. Clear procedures and penalties for delays are recommended to reduce costs and accelerate project deployment.

B-23Renewable electricity Plan - A path to good jobs, stable prices, and a cleaner environment. 4/7/2011 2 passages
Grid: Cleaner and Stronger p. p. 3
Grid: Cleaner and Stronger To increase the grid's capacity to absorb intermittent energy from wind and tidal sources, the province will continue to encourage the use of locally-produced natural gas—a cleaner, quick-responding fuel that is...

AI summary The province aims to enhance grid capacity to handle intermittent renewable energy by promoting locally-produced natural gas as a balancing fuel. Upcoming studies will support grid upgrades and improvements to the interconnection with the North American grid.

Electricity Transmission and Distribution in Nova Scotia p. p. 24
Electricity Transmission and Distribution in Nova Scotia Adding more renewable electricity to the transmission and distribution systems requires careful planning to maintain system reliability. This is particularly true because most of the...

AI summary The document discusses the need for careful planning and investment in Nova Scotia's transmission and distribution systems to accommodate renewable energy sources and maintain reliability. It highlights the importance of upgrading infrastructure to support intermittent renewable generation, remote locations, and large-scale wind projects, with analysis to be conducted under compliance standards and open for stakeholder feedback.

U-8 - Synapse Model Using Neal Livingston's Assumptions - Pynn Letter and Payback in 10 years06756 4/14/2011 1 passage
Nova Scotia COMFIT Model Large Wind (Over 50 kW) Synapse U-8
ptions: Notes:

AI summary The text provides a table with columns for 'Options' and 'Notes', but no content is visible within the table cells. The heading references the COMFIT Model for large wind projects and mentions Synapse U-8, indicating a focus on forecasting and analysis for wind energy integration.

06848Final Submission - NSDOE and NSE 4/29/2011 1 passage
2. Community-Based Feed-In Tariff
2. Community-Based Feed-In Tariff ... This plan introduces a Community-Based Feed-In Tariff (COMFIT) to encourage the development of local renewable energy projects by municipalities, First Nations, co-operatives, and non-profit groups.......

AI summary Nova Scotia introduces a Community-Based Feed-In Tariff (COMFIT) to support local renewable energy projects by municipalities, First Nations, co-operatives, and non-profits. Projects will be connected at the distribution level, with eligibility limited to ensure community-rooted investments. The program will be reviewed in 2012 to ensure it meets its goal of supporting 100 MW of community-scale renewable energy.

20110406-1Hearing Transcript — 4/6/2011 (ANSS Panel, St. Francis Xavier Univ, Consumer Adv. Panel) 1 passage
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS whether these turbines last 20 years or less, five years,
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS whether these turbines last 20 years or less, five years, 1 the ones that would be installed in the next few years are 8 with the distribution lines sketched in and the capacity 9 on each of...

AI summary The text discusses the challenges of installing distributed generation in Nova Scotia, referencing sub-station capacity and the use of maps to identify areas with available capacity. It draws a comparison to Consolidated Edison's approach in New York City, suggesting that transparency in sub-station capacity can aid developers without creating competitive or security risks.

20110408-2Hearing Transcript — 4/8/2011 (Luciano Lisi (Tel Conf.), Brian Giroux) 1 passage
- into the transmission system, surpluses.
- into the transmission system, surpluses. 1 Page 1356 NSUARB-BRD-E-R.10 But it turned out that that 11 can only feed 20 percent of the load, that sort of thing, 12 so it's between hay and grass. 13 The grid is so weak and there's you 14 k...

AI summary The testimony discusses the weak and outdated grid infrastructure in the area, the inefficiency of power transmission from Tuft's Cove, and the challenges faced by stakeholders in the regulatory process, including delays and limited access to decision-makers.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →