HomeGrid ModernizationM03669Evidence
Topic/Matter Intersection

Topic:"Grid Modernization" in M03669

Matter: E-ENSC-R-10 - Efficiency Nova Scotia Corporation - Electricity Demand Side Management Plan for 2012A request by Efficiency Nova Scotia for approval of a $43.7 million Demand Side Management plan for the 2012 operating year.  (Also see Matter Nos. M04538 and M04539)
2 passages 1 document

Grid Modernization across all matters →

E-22010 DSM Evaluation Reports - Final Report - February 28, 2011 2/28/2011 2 passages
Section 1732
Page A9 Figure 1: Metered Amperage Data from 6/2/2010 90 80 70 60 Amperage 50 Logger A Logger B 40 Logger C 30 20 10 0 Time (24 Hours)

AI summary Figure 1 displays metered amperage data collected over a 24-hour period on June 2, 2010, showing readings from three different loggers (A, B, and C). The data illustrates variations in electrical current over time.

Section 1734
In Figure 1, notice for loggers B and C, using 1A as an ―on‖ indicator overestimates lighting usage since the circuit load is variable. In reality, a fraction of lights appear to have been on in the morning and evening (most likely emergen...

AI summary The text discusses the analysis of logging data from electrical circuits, noting inconsistencies and variability in the data. It highlights the need to clean the data by identifying minimum current readings and assumptions made about lighting loads. The analysis calculates load factors and adjusts operating hours to estimate equivalent full load lighting hours.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →