30 o Determine potential for costs reduction (e.g., test effectiveness of remote 1 strategies in order for Nova Scotians to meet energy and demand savings targets now 2 and in the future. The Enabling Strategies set out in the Preferred Pl...
AI summary The document outlines strategies to help Nova Scotians meet energy and demand savings targets, emphasizing enabling strategies such as education, research, and pilot programs. Initiatives include testing new service delivery approaches, using AMI data, and exploring net-zero options for residential properties.
- gaining a better understanding of residential customer segments through research and profiling to increase engagement and grow participation in our residential 1 programs; 27 • exploring opportunities to help businesses manage and reduce...
AI summary The document outlines strategies to enhance residential customer engagement through research and profiling, and explores opportunities for businesses to reduce demand costs using interval data and building optimization software. It also mentions the continuation of the 2019 Locational-DSM Pilot until 2020 and highlights other enabling strategies like the Efficiency Trade Network, Codes and Standards, and Regulatory Affairs.
ons, including the World Bank. I have also recently created and led the launch of Sun Shares, a subsidiary of VEIC that develops and provides community solar services to employers and their employees. - Q: Please summarize your experience...
AI summary The individual highlights their extensive experience in energy efficiency and renewable energy initiatives, including advising Maryland's EmPOWER program, leading DC's Solar for All initiative, and authoring papers on utility business models. They emphasize work with distributed resources, AMI, and community solar programs.
Presentation Summary EfficiencyOne has developed an electronic technical reference manual (eTRM) which relies on three core components: - 1. Energy Savings Platforms (ESP) - 2. Dynamic DSM (DDSM) - 3. Evaluation reports These three compone...
AI summary EfficiencyOne's eTRM integrates Energy Savings Platforms, Dynamic DSM, and Evaluation reports to enhance operationalization, reduce errors, and improve transparency in energy savings algorithms. This approach contrasts with traditional TRMs by enabling real-time modifications and historical tracking, offering greater flexibility and integration with program administration.
E-23NSPI (IG) RIR-1 to RIR-10 - Redacted
6 passages
2020-2022 DSM IG IR-05 Attachment 1 Page 62 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 1 10.0 TRANSMISSION DEVELOPMENT 2017 TO 2026 2 3 10.1 Transmission Development Plans 4 5 Transmission development plans are summarized below. As...
AI summary Transmission development plans for 2017–2026 include projects like the Canso Causeway upgrade, Spider Lake substation completion, and NPCC BPS compliance efforts. These projects aim to increase export capacity, relieve generation constraints, and enhance reliability, with some tied to the Maritime Link project. (CI references indicate redacted confidential information)
2020-2022 DSM IG IR-05 Attachment 1 Page 63 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 1 • Replacement of 7.5/10//11.2 MVA Halliburton 69-25kV Transformer 56N-T1 2 with new 15/20/25MVA unit due to load growth and voltage conversion...
AI summary The document outlines infrastructure upgrades for Nova Scotia Power Inc. (NSPI), including transformer replacements (e.g., Halliburton, Auburndale), capacitor bank breaker replacements, and transmission right-of-way widening projects (2018–2020). These efforts aim to address load growth, voltage conversions, and reduce tree-related outages. Some projects, like the Harbour Crossing replacement, require ongoing studies.
2020-2022 DSM IG IR-05 Attachment 1 Page 67 of 158 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 1 Scope 2 The scope of the study is to assess four options for dealing with the clearance, age, and 3 capacity issues on Lines L-5531 (13V-Gulch...
AI summary The document outlines a study evaluating four options to address clearance, age, and capacity issues on four Nova Scotia transmission lines (L-5531, L-5532, L-5535, L-5541). Options include restoring temperature ratings, upgrading conductors, and rebuilding lines with higher capacity materials.
1.7 Base Case Development The system representation used in the base cases for this study was developed jointly with NBP for the Maritimes area from the update of MMWG 2014 Series MMWG 2020 base cases. The projects planned for installation...
AI summary The base case development involved collaboration with NBP to update Maritimes area system representations from MMWG 2014 to 2020 base cases, incorporating projects like network upgrades, protection systems, and capacitor banks between 2017-2021.
3.0 Technical Analysis
AI summary The document section '3.0 Technical Analysis' outlines a regulatory proceeding involving Nova Scotia's utility sector, referencing numerous acronyms related to energy planning, grid management, and regulatory bodies. Key entities include Nova Scotia Power Inc. and the Nova Scotia Utility and Review Board, with topics focusing on technical infrastructure and interconnection standards.
2017 NRIS Wind Study Ele mei nts 2021 Dynamics Contingencies Station Bkr line Bus Xfmr Var Gen Element Dynamics SPS х L6507_L6508 DCT L6507][L6508 79N - Dbl Cct х L6534_L7021 DCT L6534][L7021 - TOWERS х L7003_L7004 DCT L7003][L7004 G0 - IO...
AI summary The text presents a table titled 'Table 6: Dynamic Contingencies' from the 2017 NRIS Wind Study. The table lists various power system elements, including lines, transformers, and fault scenarios, along with associated dynamic contingency information.
78612Compliance Filing
3 passages
Ibid 1 efficiency information and support with more Nova Scotians. 28 researching opportunities from other jurisdictions and partnering with other o 29 DSM experts; and 1 researching and piloting new measures and new approaches to service...
AI summary EfficiencyOne plans to develop new initiatives to meet changing market conditions, reach under-served customer segments, and leverage new information and technology. These initiatives include exploring dynamic energy management, building optimization software, net-zero residential options, and using advanced analytics with Advanced Metering Infrastructure data to customize customer offerings and reduce costs.
cipation. The most recent set of notable changes took place in 2017, when Green Heat revised its delivery model to reflect an after-purchase mail-in rebate program to remove barriers to participation. Efficient Product Installation was pil...
AI summary The document outlines the evolution of energy efficiency programs in Nova Scotia, including Green Heat's shift to mail-in rebates in 2017 and the development of Efficient Product Installation from 2011 to 2014. The program expanded from low-income communities to all residents, transitioned from CFL to LED bulbs, and merged with the 'Rental Properties and Condominiums' program in 2017. Recent initiatives include testing LED holiday lights and thermostatic shower valves.
EfficiencyOne will undertake new initiatives to test appropriate ways to meet changing market conditions, reach under-served segments of customers, and take advantage of new information and technology. These initiatives include: • research...
AI summary EfficiencyOne plans to explore new initiatives to improve energy management, including dynamic control in commercial buildings, net-zero residential options, and advanced analytics for customized customer offerings. The 2019 Locational-DSM Pilot will continue until 2020, and collaboration with NS Power on demand response measures is emphasized.