N-1Report 2 passages
Section 73
14.1 17V Wind 31-Oct-23 GIA Executed NRIS 4-T 542 26-Sep-16 Cumberland 3.78 3.78 37N Tidal 30-Jun-25 GIA Executed NRIS 5-D 557 19-Apr-17 Halifax 5.6 5.6 24H CHP 01-Sep-18 SIS Complete N/A 01-Oct- 6-T 517 15-Dec-14 Cumberland 4 4 37N Tidal...

AI summary The document lists various interconnection requests with details such as project type, dates, and statuses. It also mentions the In-Service dates and their significance in interconnection agreements. The document is part of a 2023 10-Year System Outlook and was filed on June 30, 2023.

Section 113
Page 48 of 59 2023 10-Year System Outlook NON-CONFIDENTIAL 1 7.2.1 Bulk Power System (BPS) 2 3 The NS Power bulk transmission system is planned, designed and operated in accordance with 4 North American Electric Reliability Corporation (NE...

AI summary The document outlines the definitions and operational standards for the Bulk Power System (BPS) and Bulk Electricity System (BES) under NS Power, emphasizing compliance with NERC and NPCC criteria. The NS Exception Procedure is also detailed, which allows for certain exceptions in the NS transmission system, approved by the NSUARB in 2017.

N-2NSPI (NSUARB) RIR-1 to RIR-12 - Redacted 1 passage
Section 20
LIN1 CTs $0 Biomass 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 REDACTED (CONFIDENTIAL INFORMATION REMOVED) 2023 10-Year System Outlook Report (NSUARB M11221) NSPI Responses to NSUARB Information Requests NON-CONFIDENTIAL 1 Request I...

AI summary NSPI details four completed transmission upgrades under TSR 400, with one component (switch upgrades) pending completion in Q2 2025 due to equipment delivery delays. The response addresses NSUARB's IR-6 request regarding system upgrades in the 2023 10-Year System Outlook Report.

91323NSUARB (NSPI) IR-1 to IR-12 1 passage
Section 3
Document: 305605 (P-194) Date Filed: Sept. 22, 2023 NSUARB (NS Power) Page 1 of 4 1 Request IR-1: 2 Referencing page 6 of 59 and Figure 6 on page 19 of 59, NS Power stated that the results of the 3 2022 IRP evergreen scenario CE1-E1-R2 wer...

AI summary The document outlines six requests for clarifications and updates related to Nova Scotia Power's Integrated Resource Plan (IRP), including project status updates, interruptible load changes, capacity contributions from the Maritime Link, energy mix shifts, capital investment tables, and system upgrade details for TSR 400. Requests focus on data accuracy, project timelines, and alignment with regulatory expectations.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →