Preamble p. p. 4
1 out and will be impassable for days, but water has receded. There are nine 2 transmission lines out, with confirmed wood pole structures on the ground. Areas 3 outside Nova Scotia had less impact and resources from neighboring regions ar...

AI summary The document describes Nova Scotia Power's annual ESRP drill conducted on June 5, 2025, which simulated a severe storm event. The drill included three phases: pre-storm planning, mid-storm planning, and post-storm planning, with a focus on adapting to the challenges of a current cyber incident investigation. The drill involved over 30 employees and lasted approximately 4 hours. A de-brief followed to review and update plans as needed.

7 Figure 3– 2025 ESRP Drill Action Items p. p. 11
7 Figure 3– 2025 ESRP Drill Action Items # ESRP Area Status Action Item Status Update 1 Control Centre In Progress Ensure technology at the Control Centre is scalable to meet the increased staffing capacity requirements of a Level 3 or 4 s...

AI summary This section outlines action items for the 2025 ESRP Drill, focusing on ensuring scalability of technology, confirming business continuity plans, updating response protocols, and verifying team rosters for emergency situations.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →