HomeGrid ModernizationM12563Evidence
Topic/Matter Intersection

Topic:"Grid Modernization" in M12563

Matter: NSPI DRO Appeal - Billing Issues - Beverley Burlock
3 passages 2 documents

Grid Modernization across all matters →

B-2Appellant's Additional Submissions - Redacted 2 passages
p. pp. 2-6
Electric Meter Test Results - Screen Two - MTR02 - NOVA SCOTIA POWER IN − □ × F ile E dit F u nctions H elp Electric Meter Test Results - Screen Two Equip Type MTRE Date 2025/10/20 17 Equip ID Op Code TEST FLSASFKWH +0.03 FLSASFKQH FLAASFK...

AI summary The text contains screenshots of electric meter test results from Nova Scotia Power, including test data and equipment details. It shows test results, equipment information, and maintenance actions taken on meters, with dates and operational codes.

Meters Compteurs p. p. 6
Meters Compteurs - 9 Verification 9 Vérification - 11 Revocation of permission 11 Révocation de la permission - 12 Reverification 12 Nouvelle vérification - 13 Exercise of powers by inspector 13 Exercice des pouvoirs par l'inspecteur - 14...

AI summary The document outlines procedures related to meter verification, revocation of permissions, re-verification, inspector powers, certificates, owner liability, and requirements for contractors to provide testing facilities.

101147Board Decision Letter (redacted) 1 passage
ANALYSIS & FINDINGS p. p. 1
ANALYSIS & FINDINGS As noted above, there was some confusion in your August 2025 bill, not just in the usage, but that you were being charged for four months, as opposed to two. From the summary table above, your actual usage from April 17...

AI summary The document discusses billing inaccuracies faced by a customer due to estimated readings and system limitations, including confusion over charges for four months instead of two. NS Power acknowledges system issues and is working on updates. The DRO and Board agree that customer usage is influenced by factors beyond NS Power's control, and meter accuracy is key to determining correct billing.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →