NS Power Cyber Incident Report Appendix B Page 1 of 7 Affected Regulatory Matters Report 2 - October 1 Report 3 - November 3 Report 4 - December 1 Latest update Forecast Restoration of Normal Activities Demand Side E1's Residential Behavio...
AI summary The cybersecurity incident at NS Power has disrupted the provision of customer data to EfficiencyOne (E1), impacting the Residential Behaviour Program. Data from AMI meters and the My Energy Insights platform is unavailable, and restoration is expected by the end of Q3 2026. NS Power is working with E1 to find interim solutions.
12. How many single-phase meters are currently in service? Single-phase meters currently service the over 550,000 service locations of all nondemand billing customers. They are also in service at the 1,454 meter locations discussed in this...
AI summary The text states that single-phase meters serve over 550,000 service locations for nondemand billing customers and are also in use at 1,454 meter locations discussed in this matter.
NS Power Cyber Incident Appendix C Page 4 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED) rate class. Polyphase meters can only be installed at service locations requiring three-phase power supply. An AMI single-phase meter product with a...
AI summary The document discusses the limitations in procuring AMI single-phase meters with specific features for NS Power, highlighting the lead time and replacement timeline for existing meters.
15. Has NS Power found a long-term solution to this issue through consultation with the meter vendor? If not, please elaborate on any short-term solutions while long-term solutions continue to be investigated. A long-term solution is to pr...
AI summary NS Power is seeking a long-term solution by procuring a new single-phase meter with an external demand reset lever, but this product is not currently available. In the short term, they are re-establishing AMI systems to enable remote and on-site demand resetting and considering reclassifying impacted accounts to a non-demand rate class.
16. Please elaborate on any contingency planning associated with the loss of functionality of AMI meters. NS Power has activated contingency plans for key functions enabled by AMI. For remote meter reading enabled by AMI, a contingency pla...
AI summary NS Power has activated contingency plans for key functions enabled by AMI, including remote meter reading, which now uses field meter reading with internal and contractor resources to manually read meters and send data to billing systems.
NS Power Cyber Incident Appendix C Page 5 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED) For remote connect / disconnect enabled by AMI, a contingency plan has been activated to have connects and disconnects dispatched as field work orde...
AI summary In response to the cyber incident, NS Power has activated contingency plans for AMI-enabled remote connect/disconnect and remote meter configuration changes. Connects and disconnects are now handled via field work orders, and bi-directional meters are installed for new solar customers when needed.
N-4NSPI (NSEB) RIR 13 to 15 (N-4 from M12273)
3 passages
NON-CONFIDENTIAL 1 Request IR-13: 2 3 (a) Please explain the process by which the utility currently estimates a monthly bill? 4 5 (b) Please provide details about the design limitations and tuning of NS Power's system 6 for estimating bill...
AI summary The document outlines a request to NS Power regarding the process of estimating monthly bills, the design limitations of their system, and their ability to access historical meter readings. It also references a cyber incident that caused the estimation logic to revert to a seasonal logic subroutine.
systems. This risk is being mitigated through joint planning and work status update processes that have been put in place to identify and resolve timeline challenges should they arise. (b) Meter reading is being executed through the dispat...
AI summary NS Power is managing meter reading processes through service orders and tracking completion by meter cycle. If meters are not read, bills are estimated, and readings are attempted again before the next bill is due. Access issues and resource availability may affect meter reading schedules.
(c) Monthly breakdown of the total number of bills generated based on estimates is set out in the table below. All other bills would be based on true reads. Period Bills Issued Estimates % Estimates Pre-Cyber Incident 1,282,027 6,939 0.54%...
AI summary The text presents a monthly breakdown of the number of bills generated before and after a cyber incident, highlighting the significant increase in estimated bills post-incident. The data shows that the percentage of estimated bills rose from 0.54% pre-incident to 56.52% post-incident, indicating a major shift in billing practices.
N-10NSPI (NSEB) RIRs 1-25 - Redacted
3 passages
1 ccount Nur nber Amo unt due Jun 05 i $400 .24 Rates April per month Nov 23 1300 58 24. 1 2 (c) The CIS estimation subroutine was part of the original product implementation in 1997. 3 Any changes require custom development by a third-par...
AI summary The text discusses the CIS estimation subroutine, implemented in 1997, which uses historical data to estimate bills when meter readings are unavailable. It highlights that the subroutine is not trainable or capable of machine learning. The document also includes a request about how the subroutine works for customers with net-metering.
14 Project: AMI Headend System (HES) Restoration Task Name ▼ Duration ▼ Start → Finish → % Complete , ▲ AMI Headend System Restoration 239 days Thu 5/1/25 Tue 3/31/26 100% ▶ Initiation 5 days Thu 5/1/25 Wed 5/7/25 100% Release 1 - Rebuild...
AI summary The document outlines the timeline and progress of the AMI Headend System (HES) Restoration project, which is fully completed. The project includes multiple phases such as initiation, planning, design, execution, and build, with specific durations and completion percentages provided for each task.
1 Project: ADMS Resiliency Restoration Task Name ▼ Duration Start - Finish 🔻 % Complete 💌 △ ADMS Redundancy 260 days Thu 5/1/25 96% > Initiation 5 days Thu 5/1/25 Wed 5/7/25 100% ■ Release 1 - ADMS Redundancy Restored 255 days Thu 5/8/25 W...
AI summary The ADMS Resiliency Restoration project outlines the timeline and progress of restoring ADMS redundancy, with key tasks including initiation, planning, and execution phases. The project is currently at 96% completion for the main task, with subtasks at varying stages of completion.
100856NS Power's Monthly Update #5 (M12273)
3 passages
— PROGRAM ST DUCTIOE — РКОВКА М ЗТ RUCIURE — The Restoration Program is structured into five (5) key portfolios of work – focusing on restoring business capabilities. Portfolio Scope Summary Enterprise Resource Planning (ERP) Recovery and...
AI summary The Restoration Program is divided into five key portfolios: Enterprise Resource Planning (ERP), Customer, Additional Capabilities, Cybersecurity, and Technology Enablement, each focusing on restoring critical business systems and operations.
2. That Nova Scotia Power also provide clarity on contingency plans related to smart meters, including:
AI summary The document requests Nova Scotia Power (NSP) to clarify contingency plans for smart meters. The focus is on ensuring preparedness for potential issues related to advanced metering infrastructure (AMI) deployment.
a. Steps to address potential failures or inaccuracies. - NS Power did act on contingency plans when billing resumed in June 2025. This included estimated billing, and the concurrent hiring, training and deployment of meter readers. - NS P...
AI summary NS Power implemented contingency plans, including estimated billing and meter reader deployment, after a 2025 billing system failure. Moving forward, they plan disaster recovery solutions for smart meters, enhanced monitoring, and CIS system modernization to improve bill accuracy and reliability.
20260818-1Hearing Transcript — 08/18/2026 (Chris Lanteigne, Lia MacDonald, Glen MacLeod, Blake Williams)
4 passages
OPENING STATEMENT 17 MR. DAVID MacLEOD 1 or security clearance. Thank you. 3 management and field resource allocation, asset 4 management, and IRP system and capital planning. These 5 roles included Director of Planning, Senior Director, T...
AI summary Mr. David MacLeod provides an overview of his professional background, including roles in management, asset management, and grid modernization at Nova Scotia Power. He also discusses his current role as Senior Vice President of Technology and the evidence submitted by Nova Scotia Power in the proceeding.
NOVA SCOTIA POWER PANEL 125 Cr-ex, (Roberts) 1 you were overbilling customers. 2 (Lanteigne) I think –– you're A. 3 absolutely right. So if we would have been 4 underestimating or overestimating, again, for many 5 customers those estimates...
AI summary The discussion addresses concerns about billing inaccuracies, particularly underpayment due to underestimated usage and seasonal fluctuations. Efforts to correct these issues involved deploying meter readers and using over-the-air data from AMI smart meters, leading to more accurate billing by March 31st and a return to normal billing processes.
INTERNATIONAL REPORTING INC. CERTIFIED COURT REPORTERS 1 we took the right steps and we made the right decisions to 2 issue bills to our customers. I'm not saying it's 3 perfect. I don't want that to be the impression I'm 4 giving, but in...
AI summary The speaker acknowledges that while the decisions made to issue bills to customers were appropriate given the tools and resources available, the prolonged period of estimation due to system outages was a significant challenge. Lessons learned include the importance of robust redundancies in AMI systems to avoid future prolonged outages.
NOVA SCOTIA POWER PANEL 131 Cr-ex, (Roberts) - of trying to bring back the AMI systems with a bit more kind of robust business continuity protocols in place, if I could perhaps pass it over to Mr. MacLeod just to elaborate on that for a mi...
AI summary The discussion focuses on Nova Scotia Power's efforts to improve business continuity and resiliency, particularly in the context of AMI systems and cyberattack recovery. It also touches on the use of photo meters for billing and the challenges faced in implementing new processes post-cyber incident.