Topic:"Grid Modernization" in M12661

Matter: Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)Application for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above-the-line- tariff available to Port Hawkesbury Paper
9 passages 5 documents

Grid Modernization across all matters →

N-5NSPI (CA) RIR 1 to 9 - Redacted 2 passages
NOVA SCOTIA POWER INC. ANALYSIS OF AVERAGE METER INVESTMENT FOR THE YEAR ENDING DECEMBER 31, 2027 p. p. 201
NOVA SCOTIA POWER INC. ANALYSIS OF AVERAGE METER INVESTMENT FOR THE YEAR ENDING DECEMBER 31, 2027 (1) TOTAL CUSTOMERS (2) UNIT METER COST (3) TOTAL COST (4) PERCENT (5) METER COST ($000) ( 1) DOMESTIC 486,363 $129.17 $62,823,522 83.96 $57,...

AI summary Nova Scotia Power Inc. (NSPI) presents a breakdown of average meter investment costs across customer categories for 2027, totaling $68.1 million. Domestic customers account for 83.96% of the investment, while industrial and municipal categories contribute smaller shares. The analysis includes unit meter costs, total costs, and percentages for each segment.

NOVA SCOTIA POWER INC. SALES, GENERATION AND DEMAND ANALYSIS FOR MAY 2027 p. p. 201
NOVA SCOTIA POWER INC. SALES, GENERATION AND DEMAND ANALYSIS FOR MAY 2027 (1) MWH SALES LOSSES (2) ENERGY LINE (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMA...

AI summary The document presents a detailed breakdown of Nova Scotia Power Inc.'s sales, generation, and demand analysis for May 2027, including energy sales, losses, demand factors, and system performance metrics across various customer classes and programs.

N-6NSPI (IG) RIR 1 to 31 - Redacted 3 passages
FOR MARCH 2027 p. p. 181
FOR MARCH 2027 (1) MWH (2) ENERGY LINE (3) ENERGY (4) CLASS NON- COINCIDENT (5) SYSTEM COINCIDENT (6) SYSTEM COINCIDENT (7) DEMAND LINE (8) SYSTEM (9) SYSTEM COIN. PEAK COINCIDENT (12) SHORE POWER (13) GEN.REPL./LOAD FOLL. (14) ELIADC (15)...

AI summary The table presents data for March 2027, including energy line items, system coincident demand, and export sales. It shows various categories such as Shore Power, GEN.REPL./LOAD FOLL., ELIADC, and others, with corresponding values and percentages. The data includes sub-totals and total figures for energy and demand lines.

NOVA SCOTIA POWER INC. p. p. 181
(23) METER DATA SERVICES 729.747 46 66 116 106 76 80 113 3 123 0 O-16

AI summary The document provides a line item related to Meter Data Services under Nova Scotia Power Inc. with a value of 729.747 and associated numbers indicating various metrics or counts.

FOR MARCH 2026 p. p. 181
FOR MARCH 2026 (1) MWH SALES (2) ENERGY LINE LOSSES (3) ENERGY REQUIREMENT (4) CLASS NON- COINCIDENT DMD. (KW) (5) SYSTEM COINCIDENT FACTOR (6) SYSTEM COINCIDENT DMD. (KW) (7) DEMAND LINE LOSSES (8) SYSTEM COIN. PEAK DMD. (KW) (9) SYSTEM C...

AI summary The document presents a summary of energy sales, losses, and demand metrics for March 2026, including total MWH sales, energy line losses, energy requirement, and system demand factors.

N-21-(i)Appendix A - Whited CV 2 passages
PUBLICATIONS p. p. 0
PUBLICATIONS Havumaki, B., A. Fuzaylov, M. Whited. 2025. Optimizing Incentives for Effective PIMs: Coordinating PIMs with authorized ROE for Efficient and Effective Regulation. Synapse Energy Economics for Clean Virginia. Shenstone-Harris,...

AI summary The publications section lists several studies and reports conducted by Synapse Energy Economics and other organizations on topics such as electric vehicle adoption, building electrification, offshore wind benefits, and industrial electrification. These studies aim to inform regulatory and policy decisions related to energy efficiency and grid modernization.

TESTIMONY AND COMMENTS p. p. 0
ect Testimony of Melissa Whited and Ben Havumaki regarding the performance incentive mechanisms and tracking metrics proposed by Commonwealth Edison Company and Ameren Illinois Company. April 6, 2022. Maryland Public Service Commission (Ca...

AI summary Testimony from Melissa Whited and Ben Havumaki in various regulatory proceedings across multiple states and provinces, addressing topics such as rate design, performance incentive mechanisms, grid modernization, and tariff applications on behalf of consumer advocacy organizations and legal counsel.

101220NSPI (PHP) IR 1 to 13 - PDF - Redacted 1 passage
M12661 – NS Power Application for Approval of the ELID Tariff NSPI Information Requests to PHP p. p. 1
M12661 – NS Power Application for Approval of the ELID Tariff NSPI Information Requests to PHP 1 2 3 site, that includes approximately 4MW that are needed to maintain the shared services required for the NS Power Port Hawkesbury Biomass Pl...

AI summary The document discusses NS Power's application for approval of the ELID Tariff and includes information requests to PHP regarding interruptible service and compensation. It references the ELIADC tariff and its mechanisms for peak avoidance, including the ADC and Priority Interruptible mechanisms.

101236IG (NSPI) IR 1 to 31 - PDF 1 passage
18 Request IR-6:
18 Request IR-6: 19 Reference: N-1, ELID Application, Attachment 1, ELID Tariff, page 1 of 8. Demand Charge…. Once established through a General Rate Application, Fuel Adjustment Mechanism (FAM) proceeding, Rider proceeding, etc. or as oth...

AI summary This section of the regulatory proceeding document references a 'Rider proceeding' and a 'FAM proceeding' in the context of demand charge establishment. It also asks about the process for conducting a Grid Reliability Assessment (GRA) in the absence of one, within the scope of an AA/BA proceeding or otherwise.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →