Topic:"Grid Modernization" in M12719

Matter: Nova Scotia Power Inc. - CI C0059483 – 83V L-5017 and L-5046 Rebuild Tap - $1,558,116
2 passages 2 documents

Grid Modernization across all matters →

N-1Application 1 passage
DESCRIPTION: p. p. 1
DESCRIPTION: This project is to rebuild the L-5046 tap at its intersection with L-5017, which is in the Wolfville, Annapolis Valley area. The tap structures and switches at this location were identified as requiring replacement as part of...

AI summary This project involves replacing 9 transmission structures and installing a new switch (83V-504) at the L-5046 tap in Wolfville, Annapolis Valley. The work is divided into two phases, aiming to enhance operational flexibility through on-load switching and a permanent bypass. Upgrades will improve transmission system reliability and isolation efficiency.

1011952025 Q4 Capital Reports 1 passage
2025 ACE Carryover Spending - as of December 31, 2025
2025 ACE Carryover Spending - as of December 31, 2025 Project 2025 ACE Plan 2025 ACE Plan Amount C0043010 2022/2023 Wood Pole Retreatment Program 79,470 656,597 - (79,470) C0031268 AMO Critical Equipment Online Monitoring 34,543 432,380 53...

AI summary The document outlines the 2025 ACE Carryover Spending as of December 31, 2025, detailing various projects under the 2025 ACE Plan, including amounts allocated, actual spending, and variances. It includes infrastructure projects such as Wood Pole Retreatment, Breaker Replacement, and Advanced Metering Infrastructure.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →