L-2Electricity and Gas Inspection Act Regulations 1 passage
Regulations Règlements p. p. 17
Regulations Règlements - 28 (1) Le gouverneur en conseil peut, par règlement, prendre toute mesure d'application de la présente loi, notamment : - a) établir ou prévoir l'établissement des caractéristiques relatives : - (i) à la conception...

AI summary The regulation outlines the governor in council's authority to establish meter standards, including design, installation, measurement units, testing protocols, and fee structures for inspections. It emphasizes compliance with legal requirements and administrative procedures for meter verification and certification.

L-7NSPI Response to Appeal (redacted) 2 passages
Contextual Background p. p. 0
Contextual Background In addition to the procedural details set out above, the following background is relevant to Mr. Langille's DRO appeal. Mr. Lincoln opened his NS Power account in November 2017. Mr. Lincoln's bimonthly power consumpti...

AI summary Mr. Lincoln's NS Power account has shown consistently high bimonthly power consumption since its opening in November 2017. A table details his consumption history from 2017 to 2026, with the lowest and highest consumption highlighted. His meter was upgraded to an AMI smart meter in January 2021, leading to two kWh figures being listed for that period.

Preamble p. p. 0
The Account notes included as Confidential Attachment 3 set out the following communications with Mr. Lincoln about his arrears and payment arrangements. November 16, 2018 – Mr. Lincoln contacted Customer Care to discuss his arrears and ad...

AI summary The document outlines Mr. Lincoln's payment arrangements and billing history with NS Power, including multiple changes to his budget plan over time. It also mentions his request for historical billing data and the provision of meter readings and invoices. The AMI meter installed in 2021 is noted as functioning properly.

L-7-INSPI Response to Appeal - Re-file (redacted) 2 passages
Contextual Background p. p. 0
Contextual Background In addition to the procedural details set out above, the following background is relevant to Mr. Langille's DRO appeal. Mr. Lincoln opened his NS Power account in November 2017. Mr. Lincoln's bimonthly power consumpti...

AI summary Mr. Lincoln's NS Power account has shown consistently high bimonthly power consumption since its opening in 2017. The account's consumption history is detailed in a confidential attachment, and an AMI smart meter was installed in January 2021, resulting in two kWh figures for that billing period.

Preamble p. p. 0
The Account notes included as Confidential Attachment 3 set out the following communications with Mr. Lincoln about his arrears and payment arrangements. November 16, 2018 – Mr. Lincoln contacted Customer Care to discuss his arrears and ad...

AI summary The document outlines Mr. Lincoln's interactions with NS Power regarding his arrears and payment arrangements over several years. It includes details about budget plans, changes in payment schedules, and the provision of billing information. The AMI meter installed in 2021 is noted to be functioning properly, and his electric usage has remained consistent over time.

L-11NSPI (NSEB) RIR-1 to RIR-12 (redacted) 1 passage
NON-CONFIDENTIAL p. p. 3
NON-CONFIDENTIAL 1 Request IR-06: 2 3 With respect to the meter change: 4 5 (a) On what date was the meter changed? 6 7 (b) Why was the meter changed? Were there any issues with the existing meter or billing? 8 9 (c) Who authorized the met...

AI summary The document outlines responses to information requests regarding meter changes for Mr. Lincoln and a payment arrangement. The meter was changed twice: once as part of a system-wide AMIsmart meter rollout and once during a dispute resolution process for testing. NS Power states that a proposed monthly payment arrangement is insufficient to cover current electricity usage and outstanding arrears.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →