M-7NSPI (NSEB) RIR-1 to RIR-9 (redacted) 1 passage
Mitchell DRO Appeal (NSEB M12767) NSPI Responses to NSEB Information Requests
Mitchell DRO Appeal (NSEB M12767) NSPI Responses to NSEB Information Requests 1 Request IR-4: 24 subsequent February 2026 bill relied on an actual meter read of 147,480.13 kWh, reflecting 25 consumption of 28,539 kWh since the assumed read...

AI summary The document outlines NSPI's responses to NSEB information requests regarding Mitchell's DRO appeal. It includes details about actual energy consumption, meter type, remote read capabilities, and the resumption of remote reads following a cyber incident, as well as a request for information on interest and penalties applied to a reconciliation balance.

102014NSEB (NSPI) IR-1 to IR-9 1 passage
Request IR-5:
Request IR-5: - Please confirm: - a) the type of meter installed at the premises; - b) whether the meter is capable of remote reads; and - c) when NS Power resumed the ability to obtain remote reads for this account following the cyber inc...

AI summary Request IR-5 seeks confirmation regarding the type of meter installed, its capability for remote reads, and when NS Power resumed remote reads after a cyber incident.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →