- (a) The customer must commence service under this tariff on November 1st, unless NSPI grants a waiver. - (b) The customer must be equipped with a standard Smart Meter. - (c) The customer must be on electronic billing and have a MyAccount...
AI summary This section outlines the conditions for customers to subscribe to a specific tariff, requiring the use of a Smart Meter, electronic billing, and a MyAccount profile, while also allowing NSPI to limit enrollment and exclude customers on Net Metering service.
SPECIAL CONDITIONS (1) Metering will normally be at the low voltage side of the bulk power transformer. At the option of the Company, supply may be at distribution voltage. Meter readings shall be increased by 1.1% for each transformation...
AI summary The special conditions specify metering requirements, including adjustments for transformer losses based on the voltage level at which metering occurs. Meter readings are adjusted by 1.1% per transformation when metering is at distribution voltage and reduced when at transmission voltage.