N-1Application - Redacted
11 passages
1 3.0 LOAD FOLLOWING PORTION OF THE GRLF TARIFF 2 - 3 The GRLF Tariff is available to customers who have their own generation of continuous capability, - 4 normally used to support the customer's own load, where the customer has signed an...
AI summary The text describes the Grid Reliability Levy Fee (GRLF) Tariff, which is available to customers with their own continuous generation capabilities who have operating agreements with NS Power. The tariff consists of three components: Generation Replacement (GR), which provides backup power during outages or maintenance at incremental cost plus a fixed adder; Optional Load Following (LF), an energy-only charge for customers with process limitations; and Spill Service, which involves NS Power receiving surplus generation from the customer. Currently, two customers utilize these services.
2027 Annually Adjusted Rates Application REDACTED - 1 for the supporting calculations. The Energy Credit is the Company's forecast average marginal - 2 energy cost as approved for use with the GRLF rate. 3 - 4 The proposed rates for 2027 a...
AI summary The document snippet pertains to the 2027 Annually Adjusted Rates Application, specifically discussing the supporting calculations for the Energy Credit. It notes that the Energy Credit is based on the Company's forecast average marginal energy cost as approved for the Grid Reliability Levy Fee (GRLF). Additionally, the text refers to the proposed rates for 2027 in comparison to 2026 charges and mentions the provision of a proposed Spill Tariff in the appendices.
2 7.6 Board Directive regarding Interruptible Service in the RTR Market 3 4 The Board provided the following directive in its Order, dated March 20, 2024, approving the 2024 5 AARs: 6 7 NS Power and Roswall are directed to explore ways in...
AI summary The Nova Scotia Energy Board (NSEB) issued a directive in its March 20, 2024, Order requiring Nova Scotia Power and Renewall Energy Inc. to explore mechanisms for allowing interruptible customers to participate in the Real-Time Pricing (RtR) market. The parties are currently collaborating on tariff, settlement, and operational considerations to enable this service, as part of broader market development initiatives and the 2026 General Rate Application (GRA) proceedings.
SERVICE DEFINITION Service under this tariff consists in delivery of supplemental power to partial requirement customers who operate their own dispatchable generation equipment, as approved to be connected to the grid by the Company. The S...
AI summary The document defines the 'Service' under a specific tariff, which provides supplemental power to 'customergenerators'—entities that operate their own dispatchable generation equipment connected to the grid. The service is divided into three components: Generation Replacement Service (backup supply during equipment outages or fuel loss), Optional Load Following Service (top-up energy for imbalances between load and generation), and Spill Service (delivery of excess generation above customer load). Power supplied above the customer's generation, provided it is not below established net operating capability, is billed under a full requirement tariff.
GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF Page 5 of 5 - (i.) Utilize dispatchable sources of generation. - (ii.) May have more than one generating unit so long as the aggregate manufacturer's nameplate rating is of not less than 2,0...
AI summary The text outlines the requirements for the Generation Replacement and Load Following Tariff. It specifies that generators must utilize dispatchable sources and may consist of multiple units provided the aggregate nameplate rating is at least 2,000 kilowatts. Customers may choose between existing points of delivery or separate approved points, with the latter incurring additional costs. Furthermore, all facilities must comply with safety and performance standards from Measurement Canada, the Canadian Electrical Code, and NSPI's interconnection guidelines.
SHORE POWER TARIFF Page 5 of 5 - (9) The customer will make all necessary arrangements and bear all costs of ensuring that its load does not unduly deteriorate the integrity of the power supply system, by reason of its design and/or operat...
AI summary The text outlines the obligations of customers using shore power regarding the integrity of the power supply system. It specifies that customers are responsible for all costs associated with ensuring their load does not negatively impact the system's design or operation. These requirements must be detailed in a written operating agreement. Furthermore, it identifies key technical criteria for assessing system integrity, including reliability, harmonic levels, voltage flicker, unbalance, load rate of change, stability, and fault levels.
SPECIAL CONDITIONS - (1) This tariff is designed for customers supplied and metered at the high side of the transformer at transmission voltage of 69 kV or higher. For customers metered at the low side of the transformer, or at a distribut...
AI summary The text outlines special conditions for customers served at transmission voltages of 69 kV or higher. It specifies meter reading adjustments for low-side customers, clarifies that transmission service costs are excluded (requiring the OATT), and grants Nova Scotia Power Inc. (NSPI) the discretion to deny service to new customers for system reasons. Additionally, it mandates that customers ensure load integrity, defines technical criteria for system impact, and establishes conditions for attributing capacity contribution factor (CCF) values for third-party generation resources.
2027 AAR Appendix F1 Page 9 of 14 REDACTED (CONFIDENTIAL INFORMATION REMOVED) Renewable to Retail STANDBY SERVICE TARIFF Page 5 of 5 - (ii) If the LRS' resource is non-dispatchable, that it makes its full output for which it is provided an...
AI summary The text outlines the 'Renewable to Retail' Standby Service Tariff, detailing the obligations of Licensed Retail Suppliers (LRS) regarding non-dispatchable resources. Key requirements include making full output available to Nova Scotia Power during resource adequacy needs, coordinating with the Nova Scotia Power System Operator (NSPSO) to avoid planned outages during critical times, and allowing the NSPSO to recall export transactions. It also establishes a penalty mechanism where LRS must compensate NS Power for costs incurred due to resource failures or non-delivery.
2027 AAR Appendix G1 (redline) Page 5 of 5 REDACTED (CONFIDENTIAL INFORMATION REMOVED) GENERATION REPLACEMENT AND LOAD FOLLOWING TARIFF Page 5 of 5 - (i.) Utilize dispatchable sources of generation. - (ii.) May have more than one generatin...
AI summary This document excerpt outlines the technical and operational requirements for the Generation Replacement and Load Following Tariff. It specifies that generators must utilize dispatchable sources and meet specific nameplate rating thresholds (minimum 2,000 kilowatts) for multi-unit installations. It also details the customer's options for grid connection points, noting that any costs associated with separate points of delivery are the customer-generator's responsibility. Furthermore, facilities must comply with Measurement Canada, Canadian Electrical Code, and NSPI interconnection guidelines.
SPECIAL CONDITIONS - (1) This tariff is designed for customers supplied and metered at the high side of the transformer at transmission voltage of 69 kV or higher. For customers metered at the low side of the transformer, or at a distribut...
AI summary The document outlines special conditions for customers supplied at transmission voltage (69 kV or higher). It specifies meter reading adjustments for low-side metering, clarifies that transmission costs are excluded and require separate service under the Open Access Transmission Tariff (OATT), and grants Nova Scotia Power Inc. (NSPI) the discretion to deny service based on historical usage. It also mandates that customers ensure load integrity and defines criteria for evaluating potential system impacts, including reliability and voltage stability. Furthermore, it establishes requirements for attributing Customer Capacity Factor (CCF) values to third-party internal resources.
SPECIAL CONDITIONS - (1) NS Power reserves the right to have a separate service agreement, if in the opinion of NS Power issues not specifically set out herein, must be addressed for the ongoing benefit of NS Power and its customers. - (2)...
AI summary This section outlines special conditions regarding the relationship between Nova Scotia Power (NS Power) and Licensed Retail Suppliers (LRS). It establishes NS Power's right to enter into separate service agreements for specific issues and mandates that LRS customers and generators must ensure their operations do not compromise the integrity of the power supply system. Key technical factors for assessing system integrity include reliability, voltage levels, stability, and fault levels, which must be governed by written operating agreements.