N-2NSPI (Midgard) RIR 1 to 14 - Redacted
13 passages
11. Safety Schneider Electric employees shall not perform work that, in their sole opinion, is not free of reasonably foreseeable harm. This includes working on electrical equipment that, in their sole opinion, has not been placed in an el...
AI summary The section outlines safety requirements for Schneider Electric employees working on electrical systems, emphasizing the need to avoid foreseeable harm and ensuring compliance with health and safety regulations. The purchaser is required to provide detailed site-specific information to ensure the safety of Schneider Electric personnel.
2. PURPOSE At Nova Scotia Power Inc. (hereafter identified as NSPI), we believe all occupational illnesses and injuries are preventable. The purpose of the Contractor Safety Management Program (CSMP) is to prevent injuries and illness as w...
AI summary The Contractor Safety Management Program (CSMP) at Nova Scotia Power Inc. aims to prevent injuries, illnesses, and environmental incidents by establishing minimum standards for contractor management and ensuring safe completion of contracted work.
5.5. Subcontractors (directly employed byContractor) a. Adhere to the same HSE standards as required by the Contractor
AI summary This section outlines that subcontractors directly employed by the Contractor must adhere to the same Health, Safety, and Environment (HSE) standards as required by the Contractor.
7.2.4. Contract Specifications - a. HSE requirements shall be identified in this section. The contract document sets the minimum requirements for HSE expectations of contractors and based on the scope of work additional requirements may ne...
AI summary This section outlines HSE (Health, Safety, and Environment) requirements for contractors under the contract specifications. It includes minimum control measures, WCB certification, waste management, and safety roles for high-risk activities. Site-specific assessments and spill prevention measures are also emphasized.
Review of C0051815 NSEB IR-9 Attachment 1 Page 11 of 18 REDACTED (CONFIDENTIAL INFORMATION REMOVED) - b. Proof of insurance shall be uploaded to the NSPI Contractor Database. - c. NSPI's Corporate Insurance Department is to be notified of...
AI summary The document outlines requirements for proof of insurance and incident reporting for contractors working with NSPI. Contractors must upload insurance proof to the NSPI Contractor Database and notify NSPI's Corporate Insurance Department of incidents involving third parties, particularly those exceeding certain financial thresholds or involving environmental releases.
8.1. Pre-Job Tasks This step ensures the HSE requirements have been communicated and understood by all parties prior to starting work. Any required corrective actions can be identified, agreed upon and completed before the work begins.
AI summary This section outlines the importance of pre-job tasks in ensuring HSE requirements are communicated and understood by all parties before work begins, allowing for the identification and completion of any necessary corrective actions.
8.1.3. Start-Up Meeting - a. A Start-Up Meeting shall be held with the Contract Manager / Site Representative and the contractor prior to starting work. Topics covered in the meeting may include but not be limited to: - Identified Hazards...
AI summary A Start-Up Meeting is required before work begins, involving the Contract Manager / Site Representative and the contractor. Topics include identified hazards, site safety plans, emergency response, and roles and responsibilities.
10.1.1. Performance Monitoring - a. The Contract Manager / Site Representative or designate is responsible to monitor the HSE aspects of the contractor's work activities. The extent of monitoring is influenced by several factors including...
AI summary The document outlines the responsibilities of the Contract Manager / Site Representative in monitoring HSE aspects of contractor work activities, considering factors like risk level, task complexity, and contract duration. It also lists documentation methods such as observations, inspections, and meeting minutes.
10.1.2. Incident Reporting - a. Any NSPI, contractor or subcontractor employee who observes a hazardous act or condition shall report the incident. All NSPI, contractor orsubcontractor employees have the authority to stop work on any site...
AI summary The incident reporting policy emphasizes the importance of identifying and documenting unsafe acts or conditions, ensuring that all employees have the authority to halt work when necessary. Serious incidents must be reported immediately and followed by specific response procedures.
Review of C0051815 NSEB IR-9 Attachment 1 Page 14 of 18 REDACTED (CONFIDENTIAL INFORMATION REMOVED) - Significant High Potential Incident (NSPI Safety Incident Report Matrix Level 1 / 2) - No immediate threat outside the incident site, but...
AI summary The document outlines criteria for classifying and reporting incidents based on their severity and impact. It distinguishes between significant high potential incidents and minor incidents, detailing the conditions under which each category applies and the necessary reporting procedures.
10.1.3. Observations, Inspections, Site Visits and Audits - a. Performance Monitoring includes conducting and documenting inspections of work areas and job observations of tasks being completed. Inspections and observations are conducted b...
AI summary This section outlines procedures for performance monitoring, inspections, site visits, and audits. It specifies that inspections are conducted by the contractor, with the Contract Manager or Site Representative ensuring compliance. Immediate work halts are required for safety risks, and annual audits by NSPI's Safety Department are mandated for Tier 1 and Tier 2 contractors.
Review of C0051815 NSEB IR-9 Attachment 1 Page 15 of 18 REDACTED (CONFIDENTIAL INFORMATION REMOVED) - Percentage (%) of monitoring plan completed. Tier 1 Contractors include high risk and large-scale contracts/projects. Monitoring includes...
AI summary The text discusses monitoring plan completion percentages and includes metrics for medical aid, restricted work, lost time, and fatalities, focusing on Tier 1 Contractors, which are high-risk and large-scale projects.
11.1.1. Demobilization - a. Upon completion of the work the Contract Manager / Site Representative shall ensure the worksite is inspected to verify contract conditions have been met, all required work and documentation has been completed,...
AI summary This section outlines the demobilization process, requiring an inspection of the worksite after completion to ensure all contract conditions are met, documentation is complete, and the site is cleaned up. Identified hazards must be addressed with corrective actions.