with greater coordination of unit commitment, dispatch, and reserve planning than is currently the case). f. Include additional constraints in NS as needed to reflect stability, voltage, inertia, minimum unit commitment, operation reserve...
AI summary The document outlines steps for enhancing grid modeling through Plexos, including stakeholder input, technical conferences, and regulatory hearings. It emphasizes coordination in unit commitment, dispatch, and reserve planning, with NSPI providing technical data. The process involves iterative modeling, quality assurance, and final reporting.
conference in Halifax; solicit feedback at conference and from post-conference comments. d. Prepare final report post technical conference, addressing feedback. e. Attend hearing on final report.
AI summary The text outlines procedural steps involving a technical conference in Halifax, soliciting feedback, preparing a final report addressing that feedback, and attending a hearing on the report. These steps align with regulatory processes for stakeholder engagement and standardized filings.