Matter: Nova Scotia Power Inc. - CI 50518 – HYD Ruth Falls Main Dam Refurbishment – $15,445,508 (ATO)
5 passages 4 documents

Hearing Procedures across all matters →

N-12Reply Evidence - Redacted 1 passage
CI 50518 – HYD – Ruth Falls Main Dam Refurbishment ATO – Reply Evidence Redacted
CI 50518 – HYD – Ruth Falls Main Dam Refurbishment ATO – Reply Evidence Redacted 1 TABLE OF CONTENTS 2 3 1.0 INTRODUCTION 3 4 2.0 Material Costs 6 5 2.1 NS Power Response 7 6 2.1.1 Additional scope items 7 7 2.1.2 Extended construction tim...

AI summary This document outlines the regulatory process for an authorization to overspend (ATO) related to the Ruth Falls Main Dam Refurbishment by Nova Scotia Power. Key points include the filing of the ATO, site visits, information requests, and the submission of evidence by Midgard Consulting Inc. and other intervenors.

95670Hearing Order 2 passages
The following timetable will apply to this proceeding:
The following timetable will apply to this proceeding: Notices of Intervention Monday, November 4, 2024 Information Requests (IRs) to NS Power Tuesday, November 12, 2024 Responses to IRs from NS Power Tuesday, December 3, 2024 Evidence by...

AI summary The regulatory proceeding outlines a detailed timetable for interventions, evidence submissions, and filings, with specific deadlines for notices, responses, and submissions by NS Power and intervenors. The Board's Regulatory Rules, including Rule 7(3), govern the filing process.

Section 5
The Notice of Hearing will be advertised by posting it on the Board website under Notices of Hearing and by NS Power on its website. The Clerk of the Board will provide a copy of the Notice of Hearing and Hearing Order to the list of those...

AI summary The Notice of Hearing will be advertised on the Board website and NS Power's website. The Clerk of the Board will distribute copies of the Notice of Hearing and Hearing Order to interested parties. The document is dated October 21, 2024, in Halifax, Nova Scotia.

96786Letter from NS Power re: extension request 1 passage
Section 1 p. p. 0
February 19, 2025 Ms. Crystal Henwood Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 1601 Lower Water Street, 3rd Floor P.O. Box 1692, Unit "M" Halifax, NS B3J 3S3 Re: M11927 – HYD – Ruth Falls Main Dam Refurbishment...

AI summary This document outlines the timeline and procedural developments in the M11927 – HYD – Ruth Falls Main Dam Refurbishment ATO proceeding. Key events include the filing of an ATO by NS Power, the establishment of a Paper Hearing Process, the submission of evidence by intervenors and Board Counsel, and the request by Midgard for an extension to clarify its report.

97234Reply to Closing Submissions NSPI 1 passage
Preamble p. p. 0
April 8, 2025 Ms. Crystal Henwood Regulatory Affairs Officer/Clerk Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor P.O. Box 1692, Unit "M" Halifax, NS B3J 3S3 Re: M11927 – CI 50518 – HYD – Ruth Falls Main Dam Refurbishment – Cl...

AI summary This document outlines the procedural timeline for the regulatory proceeding concerning the Ruth Falls Main Dam Refurbishment. It includes the submission of an Authorization to Overspend, site visits, information requests, evidence filings, and the submission of closing arguments by various parties involved in the process.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →