CI 50518 – HYD – Ruth Falls Main Dam Refurbishment ATO – Reply Evidence Redacted 1 TABLE OF CONTENTS 2 3 1.0 INTRODUCTION 3 4 2.0 Material Costs 6 5 2.1 NS Power Response 7 6 2.1.1 Additional scope items 7 7 2.1.2 Extended construction tim...
AI summary This document outlines the regulatory process for an authorization to overspend (ATO) related to the Ruth Falls Main Dam Refurbishment by Nova Scotia Power. Key points include the filing of the ATO, site visits, information requests, and the submission of evidence by Midgard Consulting Inc. and other intervenors.