File #5911·S17·2 p. p. 17
File #5911·S17·2 - "Expected Annual Production" means the expected annual production as stipulated by the Proponent in the Proposal and as agreed by the Minister and as specified in Schedule A; - "Fiscal Year" means the period beginning on...

AI summary The document defines key terms for a project agreement, including incentives, repayment mechanisms, and production thresholds. It outlines the Minister of Natural Resources' role, schedules for calculations, and the Standard Threshold Price of $120 per megawatt hour. The agreement specifies incentives at $10 per megawatt hour or $0.01 per kilowatt hour.

EXPECTED ANNUAL PRODUCTION AND INCENTIVE PAYMENT p. p. 17
EXPECTED ANNUAL PRODUCTION AND INCENTIVE PAYMENT Total Eligible Capacity of Project: 30MW Expected Annual Production (365 days): 91.98 GWblYeal' Maximum Eligible Production for 10 Years: Equals Expected Annual Production divided by 365 day...

AI summary The document outlines a 30MW project with an expected annual production of 91.98 GWb (likely gigawatt-hours). It calculates a 10-year maximum incentive payment of $9,205,560.00, with annual payments of $919,800.00 for 365-day years and $922,320.00 for 366-day years, based on production eligibility and a $10.00 per unit rate.

11 OPERATION AND MAINTENANCE, RECORDS & METERS p. p. 62
ion, the Seller shall keep all records and other documentary evidence of any production incentives and payments contemplated in section 7.1 (d) and which may be necessary to establish, substantiate or

AI summary The Seller is required to maintain records of production incentives and payments under section 7.1(d), ensuring documentation to substantiate these financial aspects. This obligation relates to compliance with regulatory requirements for transparency and accountability in incentive management.

N-3-(b)Redacted NSPI Response to UARB IR-12 (att 7-10) to IR-17 3 passages
Section 2453 p. p. 3
- .2 CSA Standards - .1 C156.1, Ceramic and Glass Station Post Insulators - .2 G164, Hot Dipped Galvanized or Irregularly Shaped Articles - .3 W59, Welded Steel Construction (metal-ark welding) - .3 NEMA Standards - .1 Std. SG-6, Power Swi...

AI summary This document outlines the standards and submittal requirements for electrical components, including CSA, NEMA, ANSI/IEEE, and ISO standards, as well as specifications for operation and maintenance data and manufacturer drawings for disconnect switches.

1.9 Connection Transformer(s) p. pp. 80-81
2.1 The overall assembly enclosure(s) shall provide protection from ingress of rodents, insects, and moisture; and the possibility of arcing faults within the enclosure. - 1.12.2 The material for all external sides of the enclosure and int...

AI summary The document outlines technical specifications for the assembly enclosures, including protection against environmental factors, material requirements, grounding provisions, environmental control, and fire suppression capabilities.

Section 3458 p. p. 160
- .8 Formwork: - .1 Forms: to CSA-A23.1, plywood and lumber, clean and free of loose knots, splits or metal. - .2 Form Ties: to CSA-A23.1, removable or snap-off metal ties, fixed or adjustable length. Form ties, tie wire, spacers or other...

AI summary The text outlines specifications for formwork and concrete mix, referencing various Canadian standards and testing methods. It details requirements for materials such as form ties, release agents, and curing compounds, as well as specifications for concrete mix proportions and air content.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →