Matter: E-ENS-R-18 - EfficiencyOne - 2019 Demand Side Management (DSM) Plan Application, 2017 Annual Progress Report  and 2017 Evaluation Reports
6 passages 4 documents

Incentive Costs across all matters →

E-12017 DSM Annual Progress Report 2 passages
Section 36
Page 12 of 68 Efficiency Nova Scotia 2017 DSM ANNUAL PROGRESS REPORT 1 component, as compared to previous years. 10 The multi-packs have a lower per-kWh 2 rebate amount than the corresponding single-packs of qualifying lighting measures, 3...

AI summary Efficiency Nova Scotia's 2017 DSM report highlights lower-than-anticipated incentive costs due to multi-pack rebates and higher appliance retirements over replacements. Instant Savings achieved 19.5 GWh of energy savings through 710,000+ energy-efficient product sales, primarily LED lighting. EPR expenditures were lower than expected, contributing to cost efficiencies for ratepayers.

Section 62
Residential/Charitable 0.2 2.4 0.0 36 1 (2,3,4) Small General (10) 0.0 0.0 0.0 0 0 General Demand (11) 8.6 130.1 1.4 1,500 28 Large General (12) 4.0 59.8 1.4 765 13 Small Industrial (21) 2.0 30.6 0.1 439 8 Medium Industrial (22) 3.2 43.5 0...

AI summary The text provides a summary of energy and demand savings, along with expenditures, across various customer categories. It notes that numbers may not sum due to rounding and that savings are net of free-ridership and spillover. Expenditure amounts are unaudited, and previous quarter data may have been updated.

E-32017 Program Support Process Evaluation Reports 1 passage
Section 144
all program components, and check the most current incentives against the following screening thresholds:  Cost to participants  Program budget  Cost effectiveness 3 Prescriptive measures represent those measures whose energy and demand...

AI summary ENS conducted financial simulations in June 2017 to evaluate the appropriateness of existing incentives and establish a baseline for future reviews. The simulations were more effective for some measures and program components than others, leading to lessons learned that can guide future efforts.

E-9E1 (SBA) RIRs to IR-1 to IR-21 2 passages
Section 537
May 30, 2018 SBA IR-17 Attachment 1, Page 16 of 92 Efficiency Nova Scotia 2017 DSM ANNUAL PROGRESS REPORT 1 component, as compared to previous years. 10 The multi-packs have a lower per-kWh 2 rebate amount than the corresponding single-pac...

AI summary Efficiency Nova Scotia's 2017 DSM Annual Progress Report highlights lower-than-expected incentive costs due to lower rebate amounts for multi-packs and a higher proportion of appliance retirements. The Instant Savings program achieved significant energy and peak demand savings through the sale of energy-efficient products.

Section 564
Residential/Charitable 0.2 2.4 0.0 36 1 (2,3,4) Small General (10) 0.0 0.0 0.0 0 0 General Demand (11) 8.6 130.1 1.4 1,500 28 Large General (12) 4.0 59.8 1.4 765 13 Small Industrial (21) 2.0 30.6 0.1 439 8 Medium Industrial (22) 3.2 43.5 0...

AI summary The text presents a summary of energy and demand savings across various customer categories, including residential, commercial, and industrial sectors. It highlights total savings, expenditures, and participant numbers, noting that figures may be rounded and updated from previous quarters. Custom Incentives includes multiple program components and certain residential participants.

E-11E1 (Synapse) RIRs to IR-1 to IR-22 1 passage
Section 62
018 Synapse IR-08 Attachment 1, Page 10 of 47 4.1.1 Mandatory Model Inputs Mandatory model inputs shall consist of: • Full measure characterization of each of EfficiencyOne’s proposed measures, which may consist of either energy-focused me...

AI summary The document outlines mandatory and desired model inputs for EfficiencyOne's proposed measures, including energy and demand savings, net-to-gross factors, incentive costs, and other resource impacts. It also mentions the need for avoided costs, discount rates, and baseline changes.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →