Matter: P-194 - Nova Scotia Power Inc. (NSPI) - 2022 Load Forecast Report
11 passages 5 documents

Incentive Structures across all matters →

N-10Evidence - EfficiencyOne 2 passages
Section 8
EfficiencyOne Evidence 1 62,492 heat pumps had been accredited.” 8 This amounts to less than one-sixth of the domestic 2 heat pumps intended by the original end date. 3 4 The challenges experienced in the UK illustrate how the market can d...

AI summary EfficiencyOne (E1) highlights that only 62,492 heat pumps were accredited, far below policy targets. It criticizes NS Power's insufficient disclosure of electrification scenario assumptions in the 2022 Load Forecast, raising concerns about modeling uncertainties and their impact on planning decisions.

Section 21
consumption patterns in response to changes in the price of electricity over time, or to incentive 24 payments designed to induce lower electricity use at times of high wholesale market prices or 28 M10569. NSPI (E1) RIR-7, page 3 of 3, li...

AI summary EfficiencyOne (E1) recommends that Nova Scotia Power (NS Power) apply a consistent framework to evaluate the value of demand response programs, particularly in assessing consumption patterns influenced by electricity pricing and incentive payments during high wholesale market periods or system reliability risks.

N-11E1(NSPI) RIR-1 to RIR-2 3 passages
Section 14
025 Settlement Plan Measure Level Energy Efficiency n/a Technical Tables • Rows 254, 255, 256, 257 • Column AB • Column AA 2025 M10473 E-1(i) Appendix A Attachment 4 2023-2025 n/a Settlement Plan Measure Level Energy Efficiency Technical T...

AI summary The document outlines EfficiencyOne's (E1) responses to Nova Scotia Power's (NS Power) information requests regarding energy efficiency measures, including technical tables and incentive levels for heat pumps under the Green Heat program. It references forecast and actual incentive data from 2012 and mentions the 2022 Load Forecast Report proceeding (M10569).

Section 39
2022 M09096 E-1(i) Appendix A Attachment 1 n/a Technical Tables • Rows 157, 158 • Column BB • Column BA 2023 M10473 E-1(i) Appendix A Attachment 4 2023- n/a 2025 Settlement Plan Measure Level Energy Efficiency Technical Tables • Rows 263,...

AI summary The text references technical tables from multiple years (2022–2025) related to incentive levels for wood/pellet stoves and ETS units in Green Heat. It cites specific regulatory matters (e.g., M09096, M10473) and attaches detailed incentive structures, including forecast vs. actual levels and cost thresholds.

Section 40
lumn X 2013 M04819, E-7 (C ), ENSC (Avon) RIR-11 Wood/Pellet: 20% rebate was provided to a Attachment 1 maximum of $600. • Tab ‘Mea-In’ Advanced automatic pellet • Rows 71, 77 Equipment: 40% rebate was provided to a • Columns Z, AJ maximum...

AI summary The text outlines rebate programs for wood/pellet and advanced automatic pellet equipment under ENSC's 2013-2014 initiatives, with specific rebate percentages and caps. It also references the 2015 DSM Plan not being modelled and mentions EfficiencyOne's involvement in NS Power's 2022 Load Forecast Report proceeding (M10569).

86617SBA (NSPI) IR-1 to IR-19 1 passage
Section 7
resulting from 25 both the managed and unmanaged scenarios, and please describe any impact that the 26 unmanaged scenario may have on other types of load. 27 28 Request IR-10: Please refer to the Filing, page 8 of Appendix E. It states tha...

AI summary The text includes regulatory requests focused on heat pump adoption incentives, policy targets for carbon reduction, and the impact of unmanaged load scenarios. It questions NSPI about existing incentives, current adoption trends, and steps to ensure alignment with net-zero goals by 2050.

86979Submission - SBA 3 passages
Section 2
cle-to-Grid and managed charging discussed 1 Exhibit N-1, 2022 Load Forecast Report, Page 44 T: 902-835-8544 F: 902-835-4310 E: [email protected] www.blackburnlaw.ca SUITE 231 BEDFORD HOUSE, SUNNYSIDE MALL, 1595 BEDFORD HIGHWAY, BEDFORD...

AI summary The SBA criticizes NSPI's Load Forecast Report for insufficiently explaining how SONS Project data influenced EV load and peak contributions. It also argues electrification forecasts rely on emissions targets rather than current incentives, risking overestimation of 605 GWh load and 267 MW peak demand by 2030.

Section 3
d incentive structures availabie to Nova Scotians3 • This is very important since we can see that electrification is expected to add at least 605 OWh oflaod and 267 MW of peak in 2030 of the Report4 • As such, while the SBA recognizes this...

AI summary The SBA highlights gaps in Nova Scotia's understanding of consumer interventions needed for electrification, stressing the need for historical data from the SONS Project, real-world adoption rates, and uncertainty evaluations in load forecasts. It acknowledges electrification's impact on system requirements but emphasizes data refinement for accurate planning.

Section 4
ustomer load increased via electrification is appropriate to include in NSPI planning, there is little certainty in this area. As an illustration of the magnitude of the electrification activity that 2 Ml0109, Document.Number 84757, Decisi...

AI summary The SBA highlights uncertainty in NSPI's planning for electrification load increases, noting that transportation electrification growth could offset DSM plan savings. It recommends clarifying SGNS data's role in load forecasting and evaluating incentive structures' impact on EV adoption. Using smoothed adoption rates may lead to insufficient incentives for electrification.

87188NSPI (E1) IR-1 to IR-2 2 passages
Section 3
1 Request IR-1: 2 3 Reference: EfficiencyOne evidence, July29, 2022, pages 4-5. 4 The UK Climate Change Committee’s target was, and still is, to reach deployment 5 levels of 600,000 heat pumps per annum in existing homes and 300,000 heat p...

AI summary The text references UK heat pump deployment targets and highlights a significant shortfall in installations despite incentives. EfficiencyOne is requested to provide data on heat pump installations, energy savings, and incentive costs from 2022 to 2025, aligning with Nova Scotia's DSM plan. The Regulatory Assistance Project (RAP) report underscores the gap between forecasted and actual heat pump installations under the RHI scheme.

Section 5
0 - Year Energy and Demand Forecast (2022 Load Forecast Report) NSPI Information Requests to EfficiencyOne NON-CONFIDENTIAL 1 • gas heating systems as supplemental heat for peak times. 2 3 E1 states that they provide rebates on wood/pellet...

AI summary NSPI requests data from EfficiencyOne on rebate programs for wood/pellet stoves and ETS units, including installations, energy savings, and incentives, from rebate inception to the end of the 2025 DSM plan.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →