Topic/Matter Intersection

Topic:"Information Disclosure" in M11927

Matter: Nova Scotia Power Inc. - CI 50518 – HYD Ruth Falls Main Dam Refurbishment – $15,445,508 (ATO)
8 passages 6 documents

Information Disclosure across all matters →

N-6NSPI (NSUARB) RIR-1 to 13 - Redacted 2 passages
11.4 REPORTING p. p. 76
11.4 REPORTING Elliot Excavators Limited reports are delivered by email unless a document is not able to be scanned and requires hand delivery. Most of our reports are red lined drawings which come with required notes on the drawings. If t...

AI summary Elliot Excavators Limited delivers most reports via email, with red-lined drawings and notes. Third-party test results are forwarded as received. Non-standard reports are provided two months after project completion, and there are no charges for reports.

Data Management, GIS p. p. 151
Data Management, GIS James Churchill Conservation Data Analyst / Field Biologist (902) 679-6146 [[email protected]](mailto:[email protected])

AI summary The text introduces James Churchill, a Conservation Data Analyst and Field Biologist at the Atlantic Canada Conservation Data Centre (ACCDC), providing contact information.

N-12Reply Evidence - Redacted 1 passage
CI 50518 – HYD – Ruth Falls Main Dam Refurbishment ATO – Reply Evidence Redacted
CI 50518 – HYD – Ruth Falls Main Dam Refurbishment ATO – Reply Evidence Redacted 1 TABLE OF CONTENTS 2 3 1.0 INTRODUCTION 3 4 2.0 Material Costs 6 5 2.1 NS Power Response 7 6 2.1.1 Additional scope items 7 7 2.1.2 Extended construction tim...

AI summary This document outlines the regulatory process for an authorization to overspend (ATO) related to the Ruth Falls Main Dam Refurbishment by Nova Scotia Power. Key points include the filing of the ATO, site visits, information requests, and the submission of evidence by Midgard Consulting Inc. and other intervenors.

96082Confidential Undertaking 1 passage
Section 3
- 1. NS Power will provide Designated Confidential Information, as defined herein, to the Designated Recipient as defined in the undertaking to which this schedule is attached. - 2. Designated Confidential Information shall consist of mate...

AI summary The document outlines the conditions under which NS Power will provide Designated Confidential Information to the Designated Recipient, including the types of information considered confidential and restrictions on access to this information.

96572IG (Midgard - BCC) IR - 1 to 33 1 passage
1 2 (c) How did this site visit contribute to the observations and conclusions made in Midgard's report?
1 2 (c) How did this site visit contribute to the observations and conclusions made in Midgard's report? 3 (d) Please provide a copy of any notes or memos generated from this site visit. 4 Request IR-6: 5 Reference: N-9, Revised Report, pa...

AI summary The text outlines a series of information requests related to Midgard's report, including inquiries about the contribution of a site visit, the verification of communications between NSPI and DFO, and the sources of information used in the report regarding Fisheries Act amendments.

96786Letter from NS Power re: extension request 2 passages
Section 1 p. p. 0
February 19, 2025 Ms. Crystal Henwood Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 1601 Lower Water Street, 3rd Floor P.O. Box 1692, Unit "M" Halifax, NS B3J 3S3 Re: M11927 – HYD – Ruth Falls Main Dam Refurbishment...

AI summary This document outlines the timeline and procedural developments in the M11927 – HYD – Ruth Falls Main Dam Refurbishment ATO proceeding. Key events include the filing of an ATO by NS Power, the establishment of a Paper Hearing Process, the submission of evidence by intervenors and Board Counsel, and the request by Midgard for an extension to clarify its report.

Section 2 p. p. 0
esponses to Information Requests from the Consumer Advocate and Industrial Group relating to the above-noted matter. The Board established a due date of March 4, 2025 for NS Power's rebuttal evidence. NS Power is in the process of compilin...

AI summary NS Power has requested an extension for submitting its rebuttal evidence in response to Information Requests from the Consumer Advocate and Industrial Group, proposing adjustments to the NSUARB's schedule. The original due date was March 4, 2025, and the requested extension is to March 18, 2025.

98573Submissions - IG 1 passage
Delivered by E-mail p. p. 0
Delivered by E-mail Crystal Henwood Regulatory Affairs Officer/Clerk Nova Scotia Utility and Review Board 3rd Floor, 1601 Lower Water Street PO Box 1692, Unit "M" Halifax NS B3J 3S3 Dear Ms. Henwood: Re: M11927 - NSPI - CI 50518 – HYD Ruth...

AI summary The Industrial Group submits comments on M11927 regarding the Ruth Falls Main Dam Refurbishment ATO, addressing unit rates for offsetting, decommissioning, and reporting.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →