N-2NSPML (BW) RIRs 1-22 - Redacted 1 passage
NSPML Responses to Bates White Information Requests p. pp. 62-182
NSPML Responses to Bates White Information Requests

AI summary The document outlines NSPML's responses to information requests from Bates White, likely related to regulatory proceedings. While no detailed content is visible in the provided text, the context suggests a focus on transparency and compliance with information disclosure requirements in Nova Scotia's energy sector.

N-2(C)NSPML (BW) RIRs 1-22 - Confidential 1 passage
Section 1 p. p. 0
CONFIDENTIALITY NOTICE The document you are attempting to access has been filed in confidence. Certain files are accepted as confidential because they are protected by privacy law, or contain sensitive information that, if disclosed, could...

AI summary The document is a confidentiality notice for a Nova Scotia regulatory proceeding, explaining that access requires a Confidentiality Agreement. It outlines contact methods for the Clerk of the Board (phone, email) and provides the document number 320036. The notice emphasizes privacy protections and sensitive information disclosure risks.

N-4NSPML (IG) RIRs 1-26 - Redacted 2 passages
Article 24. Information Requirements p. pp. 149-151
Article 24. Information Requirements - 24.1 Information Acquisition. Transmission Provider and Interconnection Customer shall submit specific information regarding the electrical characteristics of their respective facilities to each other...

AI summary Article 24 mandates Transmission Provider and Interconnection Customer to exchange facility information per Applicable Reliability Standards. The Transmission Provider must submit system data 180 days before Trial Operation, including monthly progress reports on infrastructure. The Interconnection Customer must provide updated generator data and design specifications 180 days prior to Trial Operation, referencing Appendix 1 of the Large Generator Interconnection Procedures (LGIP).

Article 25. Information Access and Audit Rights p. pp. 151-152
Article 25. Information Access and Audit Rights 25.1 Information Access. Each Party (the "disclosing Party") shall make available to the other Party information that is in the possession of the disclosing Party and is necessary in order fo...

AI summary Article 25 outlines information access and audit rights under the Large Generator Interconnection Agreement (LGIA). Parties must disclose necessary information to verify costs and obligations, report non-force majeure events with details, and allow audits of accounts and records during normal business hours, subject to confidentiality constraints.

N-5NSPML (NSEB) RIRs 1-19 - Redacted 1 passage
NSPML Responses to NSEB Information Requests p. p. 4
NSPML Responses to NSEB Information Requests

AI summary NSPML is responding to information requests from the Nova Scotia Energy Board (NSEB), detailing its operations and compliance with regulatory requirements. The document outlines NSPML's position on various matters, including cost structures and regulatory processes.

N-6(C)NSPML (SBA) RIRs 1-6 - Confidential 1 passage
Section 1 p. p. 0
CONFIDENTIALITY NOTICE The document you are attempting to access has been filed in confidence. Certain files are accepted as confidential because they are protected by privacy law, or contain sensitive information that, if disclosed, could...

AI summary The document is marked confidential under Board rules, with access restricted to protect sensitive information. A public redacted version may be available, and access requests must be directed to the Clerk of the Board via phone, toll-free, or email. Document number 320036 is referenced.

N-7Evidence - BW 1 passage
Section 246 p. p. 18
- NS Block, measured in MWh (excluding Make-up Energy), is received during each of 12 - consecutive months."[41](#page-18-1) In introducing this requirement, the Board also stated: - NSPML/NS Power may apply to the Board for relief if it c...

AI summary The requirement mandates NSPML to receive twelve consecutive months of NS Block volumes (excluding Make-up Energy) at least 90% of the total monthly volumes called for under the Energy and Capacity Agreement. This prevents over-reliance on Make-up volumes and ensures consistency and predictability in volume delivery.

N-9BW (IG) RIR 1 to 5 1 passage
BATES WHITE INFORMATION REQUESTS RESPONSES
BATES WHITE INFORMATION REQUESTS RESPONSES To: Nancy G. Rubin, K.C. Brianne Rudderham Stewart McKelvey Suite 600-1741 Lower Water Street P.O. Box 997 Halifax NS B3J 2X2 Telephone: (902) 420-3200 / Fax (902) 420-1417 From: Vincent Musco Bat...

AI summary Bates White Economic Consulting, led by Vincent Musco, submitted responses to information requests by Nancy G. Rubin, K.C., on behalf of Stewart McKelvey. The response was issued on June 11, 2026, with contact details and deadlines provided.

101306NSEB (NSPML) IR 1 to 19 - PDF 1 passage
1 Request IR-1:
1 Request IR-1: 2 With respect to Exhibit N-1, p. 10 and Appendices A and C, please provide an excel workbook 3 with the data included in the graphs and tables, for the period August 2021 through December 4 2025. 5

AI summary The request asks for an Excel workbook containing data from Exhibit N-1, page 10, and Appendices A and C, covering the period from August 2021 to December 2025.

101308CA (NSPML) IR 1 to 4 - PDF 1 passage
1 Request IR-1:
1 Request IR-1: 2 With respect to Exhibit N-1, p. 10 and Appendices A and C, please provide an excel workbook 3 with the data included in the graphs and tables, for the period August 2021 through December 4 2025. 5

AI summary Request IR-1 seeks an Excel workbook containing data from Exhibit N-1, page 10, and Appendices A and C, covering the period August 2021 through December 2025.

101315Bates White (NSPML) IR 1 to 22 - PDF 1 passage
NOVA SCOTIA ENERGY BOARD p. p. 8
e LIL, as modeled or assumed by NSPML in M05419. Please include the base case and any sensitivities for this assumption used in M05419. - g) Please provide the CIGRE Report, referenced in footnote 13.

AI summary The text requests information on LIL assumptions modeled by NSPML in M05419, including base cases and sensitivities, and asks for the CIGRE Report referenced in footnote 13.

101681Confidential Undertaking 1 passage
Schedule "A"
Schedule "A" - 1. NSP Maritime Link Inc. ("NSPML") will provide Designated Confidential Information, as defined herein, to the Designated Recipients as defined below. - 2. Designated Confidential Information shall consist of material, whet...

AI summary Schedule 'A' outlines conditions for NSP Maritime Link Inc. (NSPML) to provide Designated Confidential Information to specified recipients. Access is restricted to signatories of the attached undertaking, with prohibitions on sharing information beyond designated recipients. The Nova Scotia Energy Board is referenced as the authority confirming confidential information designations.

101682Letter from NSPML re: RIRs / confidentiality 1 passage
Section 2 p. p. 0
ins performance data related to the Labrador Island Link that was provided by Newfoundland and Labrador Hydro (NLH). NLH considers this data to be sensitive and requested it not be disclosed publicly. 4. In respect of IG IR-07, NSPML seeks...

AI summary The document discusses requests for confidential treatment of sensitive data related to the Labrador Island Link by Newfoundland and Labrador Hydro (NLH) and maintenance schedules by NSP Maritime Link Inc. (NSPML). NSPML also removed redactions in IG IR-12 after determining they did not require confidentiality.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →