N-1Application - Redacted 25 passages
Preamble p. p. 125
Appendix 1 – Accounting Policies Appendix 2 – Financial Controls Appendix 3 – DVM Guidelines Appendix 4 – Business Plan Appendix 5 – Line of Credit Amending Agreement and Letter of Support Appendix 6 – IBM Control Centre Analysis Appendix...

AI summary The provided text is a list of appendices for a regulatory proceeding, encompassing various documents such as accounting policies, financial controls, business plans, and various economic and value case reports. It includes specific agreements like a Line of Credit Amending Agreement, software service agreements, and compensation benchmarking proposals. Notably, it refers to redacted annual reports from the Consumer Advocate and Small Business Advocate previously filed in matter M12776.

1.2 Background p. p. 125
and grid operations functions over several fiscal years. Within that transition plan, IESO Nova Scotia - will assume responsibility for real-time energy dispatch by establishing an independent energy - control center, which is expected to...

AI summary IESO Nova Scotia describes its current status as a nascent independent system operator that has been operational under Phase 1 for less than a year. The organization acknowledges its need for institutional growth and proposes a forward-looking framework for its revenue requirement application. This approach emphasizes continuous improvement and increased transparency to help the Nova Scotia Energy Board and stakeholders assess the reasonableness of proposed expenditures and fees as the organization matures.

Stakeholder Engagement p. p. 125
Stakeholder Engagement "The Board directs that minimum filing requirements will apply to IESO Nova Scotia's future applications, including: … • Details of engagement activities with Indigenous groups and stakeholders." Please refer to sect...

AI summary The Nova Scotia Energy Board (NSEB) establishes new regulatory requirements for IESO Nova Scotia regarding future applications. Specifically, the Board mandates that the entity must provide detailed information on its stakeholder engagement activities, with a particular emphasis on interactions with Indigenous groups and other relevant stakeholders.

Quarterly Reporting p. p. 125
Quarterly Reporting "IESO Nova Scotia is directed to file quarterly reports starting on May 15, 2026, including updates about the status of Phase 1 and 2 of the transition of the system operator functions from NS Power to the IESO, as well...

AI summary The text outlines the requirement for IESO Nova Scotia to submit quarterly reports regarding the transition of system operator functions from NS Power to the IESO. These reports must cover staffing, facilities, technology, regulatory compliance, and timeline or cost changes. Although the original reporting obligation stemmed from a concluded fiscal year's revenue requirement application, IESO Nova Scotia commits to continuing proactive reporting to the Nova Scotia Energy Board and intervenors during the ongoing implementation of the More Access to Energy Act.

2.3.3 Strengthen System-User Engagement, Transparency, and Access p. p. 125
2.3.3 Strengthen System-User Engagement, Transparency, and Access - The third enterprise priority is intended to improve how existing and prospective system users - connect to, participate in and receive information about Nova Scotia's bul...

AI summary The document outlines a priority to enhance engagement, transparency, and access for system users within Nova Scotia's bulk electricity system. Key activities include updating Transmission System Interconnection Procedures, completing interconnection studies, and revising Market Rules and the Open Access Transmission Tariff. These initiatives aim to support the More Access to Energy Act (MAEA) by fostering competitive market development and efficient system planning. Associated costs are distributed across various categories, including technical resources, legal support, and capital investment for an interconnection portal.

2.3.4 Build External Trust and Shape Energy Policy to Benefit Nova Scotians p. p. 125
2.3.4 Build External Trust and Shape Energy Policy to Benefit Nova Scotians - The fourth enterprise priority supports the relationships, transparency and public - accountability necessary for IESO Nova Scotia to discharge its independent m...

AI summary IESO Nova Scotia outlines its fourth enterprise priority, which focuses on building public trust, transparency, and accountability to fulfill its independent mandate. The organization intends to participate in regional and North American reliability activities, conduct required adequacy assessments, and engage with Mi'kmaq and other stakeholders. These activities are essential for effective planning, procurement, and market development. The requested funding covers stakeholder communications, Indigenous Relations Framework development, and public education to ensure informed participation and confidence in the organization's decisions.

1 Figure 14: Summary of OM&A Costs p. p. 125
1 Figure 14: Summary of OM&A Costs 2027/28 OM&A Cost Forecast ($) (Millions) System Planning a Procurement $4.17 System Operations $0.74 Information Technology $2.10 Communications and Stakeholder $0.94 Legal and Regulatory $3.05 Finance $...

AI summary The document provides a breakdown of the forecasted Operating, Maintenance and Administration (OM&A) costs for the 2027/28 period. The total forecasted expenses amount to $14.76 million, with the largest individual cost components being System Planning and Procurement ($4.17 million) and Legal and Regulatory ($3.05 million). Other costs include Information Technology, Communications and Stakeholder engagement, Finance, Corporate Services, and various operational categories like Facilities and Human Resources.

Presentation and Disclosure p. p. 125
Presentation and Disclosure Accounts receivables are presented in the statement of financial position as current assets unless settlement is expected beyond twelve months after the reporting date. Allowances for expected credit losses are...

AI summary The text outlines the accounting presentation and disclosure policies for accounts receivable. It specifies that receivables are classified as current assets unless settlement is anticipated to exceed twelve months from the reporting date. Furthermore, it notes that allowances for expected credit losses are presented as deductions from the gross carrying amount of receivables, with supporting qualitative and quantitative disclosures provided in the financial statement notes.

Financial Close & Reporting Procedures p. p. 125
Financial Close & Reporting Procedures Procedures in place to standardize the financial reporting structures and allow for the organized record keeping required for effective oversight.

AI summary The text introduces the procedures established to standardize financial reporting structures. These procedures are designed to ensure organized record-keeping, which is necessary to facilitate effective regulatory oversight of the utility's financial activities.

INFORMATION AND COMMUNICATION p. p. 125
INFORMATION AND COMMUNICATION The information and communication component of an effective system of internal control acknowledges that consistent and timely information distribution and communications to relevant stakeholders is required....

AI summary The text defines the 'Information and Communication' component of an internal control system, emphasizing that consistent and timely distribution of information to stakeholders is essential. It notes that IESO Nova Scotia has implemented regular reporting mechanisms to communicate with the Board, its committees, regulators, and other relevant stakeholders.

Annual report p. p. 166
Annual report - 32 (1) Within six months after the end of every fiscal year, the IESO shall submit an annual report to the Energy Board on its affairs during that fiscal year and shall provide a copy of the report to the Minister. - (2) Th...

AI summary The text outlines the statutory requirements for the Independent Electricity System Operator (IESO) to submit an annual report to the Energy Board and the Minister within six months of the fiscal year-end. This report must include audited financial statements prepared in accordance with IFRS Accounting Standards. IESO Nova Scotia confirms it will comply with these requirements, submitting audited accounts to the Nova Scotia Energy Board (NSEB) by September 30th annually, including the DVM variance amount and relevant MAEA submissions.

10.0 STAKEHOLDER REVIEW AND DISCOVERY p. pp. 166-167
10.0 STAKEHOLDER REVIEW AND DISCOVERY Annual review will occur via More Access to Energy Act (MAEA) s.29 Revenue Requirement, Proposed Expenditures, and Fees applications. DVM information is expected to be non-confidential and publicly ava...

AI summary The document outlines the stakeholder review and discovery process for annual revenue requirement, proposed expenditures, and fees applications under Section 29 of the More Access to Energy Act. It specifies that DVM information will be public, while confidential data requires a signed Confidentiality Agreement. Stakeholders are granted access to electronic documents and the opportunity to challenge IESO Nova Scotia's variance calculations and fee incorporations, including the review of historical results against prior forecasts.

NON-CONFIDENTIAL p. p. 167
NON-CONFIDENTIAL Project Key Activities (Updated) Estimated or Actual Completion MAEA Objects Annual IESO Report - Due September 31, 2026 per the More Access to Energy Act section 32 - Submitted to the NSEB on September 31, 2026. Ongoing M...

AI summary The document provides an update on project activities, specifically noting the submission of the Annual IESO Report to the Nova Scotia Energy Board (NSEB). The report was submitted on September 31, 2026, in compliance with section 32 of the More Access to Energy Act (MAEA). The project status is listed as ongoing, with specific references to MAEA objects 9(a), (r), and 32.

Priority 3 - Strengthen System-User Engagement, Transparency, and Access p. p. 167
Priority 3 - Strengthen System-User Engagement, Transparency, and Access Key Activity/ Project Description Estimated Completion MAEA Linkage Standard Generation Interconnection Procedures Revisions and Federal Energy Regulatory Commission...

AI summary The document outlines Priority 3 of a regulatory plan focused on strengthening system-user engagement, transparency, and access. Key activities include updating Standard Generation Interconnection Procedures to align with FERC Order 2023 recommendations, improving interconnection process functionality by Q4 2027-28, and establishing an updated market participant framework. IESO Nova Scotia aims to create structured collaboration mechanisms, such as a Market Advisory Committee and Participant Information Portal, to encourage new market entrants and improve transparency.

Priority 4 - Build External Trust and Shape Energy Policy to Benefit Nova Scotians p. p. 167
Priority 4 - Build External Trust and Shape Energy Policy to Benefit Nova Scotians Key Activity/ Project Description Estimated Completion MAEA Linkage NERC & NPCC Compliance Activities -Completion of compliance activities associated with T...

AI summary IESO Nova Scotia outlines its Priority 4 objectives to build external trust and shape energy policy. Key activities include ensuring compliance with NERC and NPCC reliability standards, submitting quarterly reports to the Nova Scotia Energy Board, and fulfilling annual reporting requirements under the More Access to Energy Act. The organization also commits to co-developing an Indigenous Relations Framework with Mi'kmaw consultants and launching a public education initiative to improve energy literacy and transparency regarding the province's electricity system.

7.2. Phase 2B p. pp. 194-195
7.2. Phase 2B Phase 2B remains within Steady State 1. It introduces additional independence and transparency enhancements without changing the core operating model. Phase 2B addresses the establishment of commercial arrangements under IESO...

AI summary Phase 2B of the project aims to establish the business and commercial capabilities required for IESO-NS to independently administer Nova Scotia's electricity system. While Phase 2A focuses on safe system operation and dispatch, Phase 2B focuses on participant workflows, settlement capabilities, reporting processes, and information exchange. These enhancements are designed to increase transparency and accountability by allowing stakeholders to interact directly with IESO-NS. The project has an estimated capital cost of $8 million and is subject to a formal decision gate review following Phase 2A.

Competitive generation procurement p. pp. 93-94
Competitive generation procurement A1.36 Transparency of dispatch is key for competitive procurement, which reduces costs by incentivizing innovation to increase efficiency among a larger pool of bidders (quantified benefit 7) . The IESO,...

AI summary The text discusses the importance of transparency in competitive generation procurement to drive innovation and reduce costs. It argues that moving operational control to an independent entity (IESO) is necessary to prevent Nova Scotia Power (NSP) from having an unfair advantage or access to sensitive competitor data. By insulating Independent Power Producers (IPPs) from operational risks and ensuring transparent settlement, the transition is expected to increase investor trust, lower the cost of capital, and reduce overall resource investment costs.

VIA WEB PORTAL p. p. 110
VIA WEB PORTAL March 31, 2026 Crystal Henwood, Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor P.O. Box 1692, Unit "M" Halifax, NS B3J 3S3 Assistant's email: [[email protected]](mailto:awhalen@pinklarkin...

AI summary This document is a formal cover letter dated March 31, 2026, addressed to the Clerk of the Nova Scotia Energy Board. It serves as the submission of the 2025 Annual Report from the Nova Scotia Consumer Advocate. The document serves as a procedural filing via the web portal to provide the Board with the Advocate's yearly reporting.

ROLE OF THE CONSUMER ADVOCATE p. p. 110
ROLE OF THE CONSUMER ADVOCATE Section 91 of the Public Utilities Act permits the Nova Scotia Energy Board and the Nova Scotia Regulatory and Appeals Board to appoint an advocate in a hearing to represent the interests of residential custom...

AI summary The text outlines the legal authority and mandate of the Consumer Advocate (CA) under the Public Utilities Act and Gas Distribution Act. The CA is appointed to represent the interests of residential customers in hearings, with powers to submit evidence, engage experts, participate in proceedings, and enter into settlement agreements. The document emphasizes that the CA relies heavily on specialized consultants and subject matter experts to navigate the technical complexities of regulatory proceedings and ensure a strong voice for the residential rate class.

ANNUAL REPORTING REQUIREMENT p. p. 110
ANNUAL REPORTING REQUIREMENT The Public Utilities Act establishes statutory annual reporting obligations for the Consumer Advocate. Specifically, s. 94 requires the CA to file an annual report with the Board covering the CA's activities du...

AI summary The text outlines the statutory annual reporting requirements for the Consumer Advocate (CA) under Section 94 of the Public Utilities Act. The CA is mandated to file an annual report with the Board by March 31st, detailing activities, hours spent, expert consultant involvement, compensation structures, and a detailed accounting of fees and costs for recovery. The Consumer Advocate submits its first annual report for the preceding year, requesting the Board to accept it as filed while offering to provide additional information if required.

(b) Detailed Summary of Relevant Matters p. p. 110
(b) Detailed Summary of Relevant Matters As noted above, s. 94 requires the CA to report on the following: - (a) the activities carried out by the advocate and the hours spent by the advocate on each activity; - (b) the name and qualificat...

AI summary The Consumer Advocate (CA) outlines its compliance with section 94 requirements regarding reporting of activities, expert involvement, and costs. The CA confirms that all retained experts and consultants were compensated via hourly rates, consistent with industry standards. Furthermore, the CA asserts that it provides the Board with monthly invoices detailing specific activities, hours spent, and a comprehensive accounting of fees and costs for all matters in which it is engaged, as supported by detailed appendices in its report.

Appendix A p. p. 110
Appendix A Sum of Sum of Sum of Sum of Sum of Sum of Sum of Sum of 0490-151 Nova Scotia Power Incorporated M11694 - NSPI - Customer Energy Management (CEM) 2022 Evaluation, Review Proceeding: Review of all filed reports and related corresp...

AI summary The document provides a summary table of various regulatory proceedings involving Nova Scotia Power Incorporated (NSPI). It outlines the scope of work for specific matters, including the Customer Energy Management (CEM) 2022 Evaluation, the 10-Year System Outlook Report 2024, and the Application for Approval of the 2025/26 Time Varying Review. The entries detail the review of evidence, correspondence with the Board and consultants, preparation of Information Requests (IRs), and meetings with interested parties.

OVERVIEW p. p. 110
- Fully complying with orders or other directions issued by the Board in a matter. - Addressing media requests and appropriately communicating with ratepayers and interested parties who contact them. The activities described above are all...

AI summary The Small Business Advocate (SBA) submitted its second annual report to the Nova Scotia Energy Board (NSEB) as required by the Nova Scotia Public Utilities Act. The report outlines the SBA's activities in advocating for small business ratepayers of various utilities, including Nova Scotia Power Inc. and Nova Scotia Independent Energy System Operator. The SBA's primary objectives include ensuring cost-effective, affordable, safe, and reliable electricity and energy efficiency programs for the small business community.

As noted, the requirement to file this Report came into effect last year. As such, there is the opportunity to provide a comparison between the years, as outlined below. p. p. 110
As noted, the requirement to file this Report came into effect last year. As such, there is the opportunity to provide a comparison between the years, as outlined below. 2024 2025 NSPI Matters 45 67 NSPML Matters 5 5 El Matters 3 3 IESO Ma...

AI summary The text introduces a comparison of regulatory matters and activities between 2024 and 2025, following the implementation of a new reporting requirement last year. It provides a table quantifying the number of matters for various entities—including Nova Scotia Power Inc. (NSPI), Nova Scotia Power Maritime Link (NSPML), Eastward Energy (El), and the Independent Electricity System Operator (IESO)—alongside Small Business Advocate (SBA) hours and consultant fees.

Small Business Advocate p. p. 110
Small Business Advocate Company Total Hours for SBA and Consultants Sum of Fees for SBA Sum of Costs for SBA Sum of HST for SBA Total Sum for SBA Sum of Fees for Consultants (USD) Sum of Costs for Consultants (USD) Total Sum for Consultant...

AI summary The document provides a detailed breakdown of the Small Business Advocate's (SBA) professional activities and associated costs across multiple regulatory proceedings. It lists specific tasks performed, including reviewing Board decisions, responding to Information Requests (IRs), attending court appearances, and conducting expert consultations. The data tracks hours spent, fees, and costs for both the SBA and external consultants for matters such as the DNRR Community Solar PPA, Property & Assets Action Plan, Port Hawkesbury Paper Application, PHP Judicial Review, FAM SWG, and the Cost of Service Study.

N-1(C)Application - Confidential 1 passage
Section 1
CONFIDENTIALITY NOTICE The document you are attempting to access has been filed in confidence. Some exhibits, noted as confidential, contain information which if released might cause financial or other harm to the party filing it, or which...

AI summary This document is a confidentiality notice for a filing submitted to the Nova Scotia Energy Board. It warns that certain exhibits contained within the document are confidential and could cause financial harm or violate privacy laws if released. It provides instructions for parties seeking access, noting that public redacted versions may exist and that a Confidentiality Agreement may be required. Contact information for the Board's Clerk is provided for access requests.

104379Notice of Public Hearing 1 passage
Board Hearings are open to the public and you may participate as follows:
Board Hearings are open to the public and you may participate as follows: - You may listen to the live hearing by visiting the Board's website at and selecting the "Listen to Live Hearings" option. This will enable you to see the electroni...

AI summary This document outlines the procedures for public participation in Nova Scotia Energy Board hearings. It provides instructions for listening to live hearings online, submitting written comments, and requesting formal standing as an intervenor by specific deadlines in 2026 and 2027. It also directs interested parties to Matter No. M13173 and invites participants to voluntarily share pronouns and titles to ensure respectful communication during the proceedings.

104380Hearing Order 2 passages
- 2. The following timetable will apply to this proceeding:
- 2. The following timetable will apply to this proceeding: Preliminary Issues List circulated by Board Tuesday, November 10, 2026 Notices of Formal Intervention Monday, November 23, 2026 Comments on Preliminary Issues List Monday, Novembe...

AI summary This section outlines the formal regulatory timetable for the proceeding. It specifies key dates for the circulation of the Preliminary and Final Issues Lists, the submission of Notices of Formal Intervention, and the exchange of Information Requests (IRs) between the Board and IESO Nova Scotia. It also establishes deadlines for evidence filing, requests to speak, and the formal commencement of the hearing on February 22, 2027.

Section 6
Evening Session 7:00p.m. (if required) Monday, February 22, 2027 3. The Board's Regulatory Rules will apply to this application, including Rule 7(3) with respect to filing by 2:00 pm on any date a document is due. 4. The notice of this hea...

AI summary This text constitutes a formal Notice of Hearing for a regulatory proceeding. It establishes the administrative procedures for the hearing, specifically noting that the Board's Regulatory Rules apply, including deadlines for document filings. It also outlines the schedule and methods for public notification, including specific newspaper publications in Halifax and Cape Breton, and the Clerk's responsibility to distribute notices to interested parties and on the Board's website.

104302Confidential Undertaking 1 passage
Section 4
tion. - 3. Unless disclosure is required by law, access to Designated Confidential Information shall be restricted to the individual who has signed the undertaking to which this schedule is attached. - 4. As a condition precedent to receiv...

AI summary This section outlines the protocols for handling Designated Confidential Information provided by IESO Nova Scotia. It establishes that access is restricted to individuals who have signed a specific undertaking and prohibits sharing such information with clients, other intervenors, or unauthorized personnel. It provides guidelines for referencing confidential data in legal documents, requiring non-confidential descriptions. Furthermore, it permits the Board to review such information in deliberations while aiming to avoid its reproduction in public orders, and allows for in-camera hearings if requested.

104379Notice of Public Hearing 1 passage
Board Hearings are open to the public and you may participate as follows:
Board Hearings are open to the public and you may participate as follows: - You may listen to the live hearing by visiting the Board's website at and selecting the "Listen to Live Hearings" option. This will enable you to see the electroni...

AI summary The document outlines the procedures for public participation in Nova Scotia Energy Board hearings. Members of the public can listen to live hearings via the Board's website, provide oral testimony by notifying the Board by February 8, 2027, or submit written comments by the same date. It also details the process for requesting formal standing as an Intervenor, including specific deadlines for requests and evidence submission. Additionally, the Board invites participants to voluntarily share pronouns and titles.

104380Hearing Order 2 passages
- 2. The following timetable will apply to this proceeding:
- 2. The following timetable will apply to this proceeding: Preliminary Issues List circulated by Board Tuesday, November 10, 2026 Notices of Formal Intervention Monday, November 23, 2026 Comments on Preliminary Issues List Monday, Novembe...

AI summary The document outlines the formal regulatory proceeding timetable for the matter involving IESO Nova Scotia. It specifies key dates for preliminary issues, formal interventions, information requests (IRs), and evidence filings, concluding with the commencement of the hearing on February 22, 2027.

Section 6
Evening Session 7:00p.m. (if required) Monday, February 22, 2027 3. The Board's Regulatory Rules will apply to this application, including Rule 7(3) with respect to filing by 2:00 pm on any date a document is due. 4. The notice of this hea...

AI summary This document provides the formal logistics for a regulatory hearing scheduled for Monday, February 22, 2027. It outlines the applicable Board's Regulatory Rules, specifically Rule 7(3) regarding filing deadlines. It also establishes the public notice schedule for the Halifax Chronicle Herald and The Cape Breton Post, as well as the Clerk's responsibility to distribute the Notice of Hearing to interested parties and on the Board's website.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →