Matter: CI# 39471 - P-510 - NSPI WO - TRE6 - U&U PA Damper Replacement - $603,418Zero dollars spent to date
2 passages 2 documents

Infrastructure Planning across all matters →

N-1Non-Confidential Work Order 6/29/2010 1 passage
Section 1 p. pp. 0-1
CI# 39471 TRE6 - U&U PA Damper Replacement June 29, 2010

AI summary This document, labeled as TRE6 - U&U PA Damper Replacement, is a regulatory proceeding chunk from June 29, 2010, related to a specific infrastructure project involving damper replacement.

79548Approval Sheet [Signed by Board] 1 passage
Why do this project? p. p. 1
Why do this project? A recent inspection confirmed that the primary air (PA) dampers were very difficult to activate with the existing pneumatic drives. Temporary repairs to the dampers allowed the unit to return to service, but the damper...

AI summary The project is necessary to replace primary air (PA) dampers found difficult to activate, ensuring compliance with NFPA safety standards and optimizing coal pulverizer efficiency. Temporary repairs allowed partial functionality, but replacement is critical for safe operation and system reliability.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →