Topic:"Infrastructure Planning" in M03416

Matter: NSPI CI# 33525 - $8,016,435 - Canaan Rd. 43V to Tremont 51V Line
7 passages 3 documents

Infrastructure Planning across all matters →

N-1Redacted Work Order 7/27/2010 4 passages
Why do this project this way? p. p. 14
Why do this project this way? The new line terminal and second transformer addition at 51 V-Tremont is required to terminate the new 138kV line and provide the additional source point on the 69kV system. Transmission line construction labo...

AI summary The project involves constructing a new line terminal and adding a second transformer at 51 V-Tremont to accommodate a new 138kV line and provide an additional source point on the 69kV system. Labour is sourced through NSPI's existing Power Line Technician service agreement with EUS. The project's cost has decreased by $6.9 million from the original ACE estimate due to refined design and more accurate local market estimates.

33525 - Canaan Rd 43V to Tremont 51V Line p. p. 14
33525 - Canaan Rd 43V to Tremont 51V Line Account ACE 2010 mission Current Sub Variance 2 3 Request IR-T2: 4 5 With respect to: 6 Page 190, CI# 33525 - Canaan Rd 43V to Tremont 51V Line, 7 Page 192, CI# 38819 - 51V Tremont Circuit Breaker...

AI summary The document requests detailed information regarding three related infrastructure projects totaling approximately $24 million. It asks for planning studies, justification for splitting the projects, status of design and engineering phases, contractor details, tender documents, and Gantt charts for project timelines.

4 p. p. 14
4 Tender Document Tender Amount Issue Date Close Date Comments Right-of–Way Clearing $500 K March 2010 March 2010 Tender awarded Site Development and Foundations – Canaan Rd. $350 K May 2010 July 2010 This tender has been issued, but not a...

AI summary The text presents a table of tender documents related to infrastructure projects, including Right-of-Way Clearing, Site Development, and Electrical Construction. Some tenders have been awarded, while others are estimated and not yet awarded.

Section 42 p. pp. 14-20
Test 4 43V- Canaan Rd. - 51V- Tremont 138kV System Expansion Project

AI summary The text refers to two voltage-related projects: '43V- Canaan Rd.' and '51V- Tremont 138kV System Expansion Project,' indicating infrastructure development in Nova Scotia's power system.

N-2NSPI Redacted Responses to Information Requests 1 passage
NON-CONFIDENTIAL p. p. 0
NON-CONFIDENTIAL 1 Response IR-T11: (cont'd) 3  The work requirement is intermittent. The contractor is able to sustain its workforce 4 and the skills of its employees by doing similar work for other parties. The 5 intermittent nature of...

AI summary The response outlines reasons for engaging a contractor workforce, including the intermittent nature of the work, lower contractor costs, variability in work location and content, and the specialized skills required. The contractor provides flexibility to NSPI to meet customer needs without long-term workforce commitments.

83335NSPI Response to IRs 4 and 5 2 passages
CI 33525 - Canaan Road 43V to Tremont 51 V Line (NSUARB P-1 28.10) NSPI Responses to UARB Information Requests p. p. 0
CI 33525 - Canaan Road 43V to Tremont 51 V Line (NSUARB P-1 28.10) NSPI Responses to UARB Information Requests

AI summary The document outlines NSPI's responses to information requests from the UARB regarding the CI 33525 project, which involves the Canaan Road 43V to Tremont 51 V Line. It details the project's scope, compliance with regulations, and other relevant information.

Preamble p. p. 0
3.00 6.00 3.00 0.50 0.50 Report Date: Project Estimate Column A C D E F SWU EST TOTAL CODE DESCRIPTION HOURS UNITS SWU HRS TRANS-IF1TA Install 138kV T-H(2) (138kV Tangent Structure H-Frame Design) 13.00 TRANS-IF1TB Install 138kV T-H(2-O)DE...

AI summary The document contains a detailed list of tasks and hours associated with various infrastructure projects, including the installation and removal of power line structures, poles, and related components for a 138kV transmission system.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →