N-12009 IRP Update - Action Plan Status Report (First Progress Report) 8/4/2010 3 passages
Section 2 p. p. 0
ahead, they will indicate next steps to be undertaken and the associated timeline where applicable. In the Utility and Review Board's (UARB, the Board) letter of December 17, 2009, the Board stated: Consistent with Dr. Stutz's suggestion,...

AI summary The UARB directed NSPI to follow its 2009 IRP Action Plan and submit an initial progress report by August 4, 2010. NSPI has provided its first progress report on the 2009 IRP Action Plan as requested.

J. René Gallant 2009 IRP Update participants p. p. 0
J. René Gallant 2009 IRP Update participants A io P la I t te c n n m S f A 4, 2 0 1 0 ta tu t s a s o ug us Su i f S is i h he D M t t te t t t p p or p ur su o c on s n w I R P j d B d d la tra to ec ry a n oa r ap p ro ve p ns a s in im...

AI summary The text contains a table with information related to the 2009 IRP Update participants and some data about submissions and proposals, but the content is largely obscured by scrambled text and appears to be incomplete or corrupted.

Section 32 p. p. 0
In advance of the above filings, NSPI contacted Board staff to provide an overview of these projects and to offer further engagement for Board staff if desired. Board staff indicated that this was not necessary at this time. NSPI will keep...

AI summary NSPI is preparing to file updates on transmission line and biomass projects, and has engaged with the UARB for ongoing communication. NSPI is evaluating options for improving the reliability of the Dartmouth East Transmission Line and has been working with stakeholders on biomass supply and sustainability, including through the Wheeler process and the Renewable Electricity Plan.

N-2Response to Board's letter of November 26, 2010 (Status Update) 3 passages
Section 2 p. p. 0
As articulated by the Board's Consultants, Plan A identifies a strategy. Essentially the same strategy was called for in the 2007 IRP and is called for other plans highlighted by the 2009 IRP Update: Plan A, the Reference Plan which emerge...

AI summary The document discusses Plan A, a strategy identified in the 2007 Integrated Resource Plan (IRP) and reaffirmed in the 2009 IRP Update. The strategy emphasizes investment in demand-side management (DSM) programs, renewable generation, and upgrades to NSPI's existing generation fleet. The UARB Consultants support this strategy for meeting NSPI's future resource needs.

I 2009 IRP Update Report, November 30,2009, Appendix B, Statement concerning IRP Update Development, Results and Recommendations, page 2 of3. p. p. 0
I 2009 IRP Update Report, November 30,2009, Appendix B, Statement concerning IRP Update Development, Results and Recommendations, page 2 of3. Year NSR (GWh) PlanA of As December 13, 2010 Differences from PlanA Reason for Differences of Eff...

AI summary The 2009 Integrated Resource Plan (IRP) Update Report outlines the progress of various energy projects as of December 13, 2010. It includes details on the status of projects such as the TUC 6, Contract Wind 308MW, and Marshall Hydro, along with their completion timelines and related status reports.

Section 9 p. p. 0
NSPI respectfully requests that the Board advise whether it continues to require this information as a part of future Action Plan Status Reports on a go forward basis. Yours truly, Nicole Godbout Regulatory Counsel S. Bruce Outhouse, Q.C....

AI summary NSPI is requesting the Board to determine if it should continue requiring specific information in future Action Plan Status Reports. The request is signed by Nicole Godbout, with support from S. Bruce Outhouse, Q.C., J. René Gallant, Mike Sampson, and Tuile Gallont, who are associated with the 2009 IRP Update Participants.

05459Ecology Action Centre's comments on NSPI's Action Plan Status Report (IRP Update_ 10/8/2010 4 passages
Part I Development of resources pre-2013 p. pp. 2-3
Part I Development of resources pre-2013 Support pursuit of DSM consistent with the IRP trajectory and Board approved plans as interim Administrator until the new DSM Administrator, Efficiency Nova Scotia Corporation, is operational, which...

AI summary The EAC supports DSM consistent with the IRP trajectory and Board-approved plans until Efficiency Nova Scotia Corporation becomes operational. It argues that DSM is cost-effective, environmentally beneficial, and crucial for reducing greenhouse gas emissions. The EAC also highlights the need for transparent and accountable transfer of DSM program management from NSPI to Efficiency Nova Scotia.

Wheeler & Adams (2009) noted that: p. pp. 7-11
e guarantees on ecological integrity and work with all stakeholders to implement such standards in the shortest timeframe. Other guidelines and standards can be developed over time" (emphasis added). On July 26, 2010, NSPI & New Page began...

AI summary The EAC reiterates concerns about the forest biomass project, citing imprudence due to lack of stakeholder consensus and potential for increased clear-cutting. The project, involving a 60MW facility, faces scrutiny over its environmental and economic implications, including a significant capital expenditure and reliance on debt financing.

Evaluate the need for environmental retrofits to meet 2018 requirements. (p.9) p. pp. 12-13
vernment has signalled its intention to introduce performance standards for new coal-fired electricity generation units, and units that have reached the end of their economic life (45 years), by 2015. The EAC points out that NSPI currently...

AI summary The EAC highlights the aging coal unit at Trenton, which will reach the end of its useful life by 2015, and calls for NSPI to phase out coal-based electricity generation in favor of sustainable alternatives as part of its IRP Update & Action Plan process.

Green Power Labs offers that: p. pp. 17-18
illion) as a 'green' source of electricity, despite proven questions regarding cost-effectiveness and long-term ecological prudence, let alone appropriateness of policy (given the outstanding issues). If in Ontario Enbridge can upgrade a s...

AI summary The EAC questions NSPI's investment in biomass and experimental technologies, arguing that it lacks alignment with Nova Scotia's renewable energy targets and aggressive GHG reduction goals. The EAC encourages the UARB to mandate NSPI to undertake research on solar PV's cost-effectiveness and potential impact on wind variability in future IRP reports.

05627NSPI's Response to EAC's comments on NSPI's 2009 IRP Update - Action Plan Status Report 11/1/2010 1 passage
EAC Comments p. p. 0
RP Update also introduced new resources, such as biomass, which 1 A 'no regrets' strategy is one in which future decisions are unlikely to be negatively affected by earlier decisions made. present a need for further investigation, and cont...

AI summary The 2009 IRP Update outlines a strategic direction for energy planning, emphasizing the need for formal approval of tactics like DSM and utility investments. It highlights the selection of 'Plan A - Renewables - Additional Biomass Generation' as the least cost option for meeting environmental constraints.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →