Topic/Matter Intersection

Topic:"Infrastructure Planning" in M03511

Matter: CI# 38856 - P-128.10 - NSPI WO - L7011 Deteriorated Replacements - $2,055,736
5 passages 2 documents

Infrastructure Planning across all matters →

N-1Redacted Work Order 9/2/2010 4 passages
Section 3
" ,- -"" ,'! , .~- ,. ,: ' l ' - -w~ \ , .~ , ~' Jj " :" ,c '" " ; $'; " 'i"?, :;;;:SER 'NCOR4;:~/~ '. ,Co :~" ' "",,- , ,~ Approved on behalf of NOVA SCOTIA UTILITY AND REVIEW BOARD S"bm;U,d '" b'h"' 1 Authorized Signatory DATE DATE Mark...

AI summary The text appears to be a partial document related to a regulatory proceeding in Nova Scotia, including a CI Number (38856) and project details, such as 'L7011 Deteriorated Replacements,' and mentions an authorized signatory, Mark Savory, from Nova Scotia Power.

Section 7
REDACTED CI 38856 Page 3 of 7 CI Number 38856 L7011 Deteriorated Replacements Project Number Parent CI Number Approved Date Cost Centre 800 800-Services - Admin. Capital Item Justification Justification Criteria: TRANSMISSION PLANT Sub-Cri...

AI summary This document outlines a project to replace deteriorated poles, crossarms, and insulators on a 230kV circuit between Lingan and Port Hastings, which is an integral part of NSP's transmission system. The project is being carried out by an affiliate and is required to prevent unplanned interruptions on the transmission system.

Section 12
1 Request IR-T8: (cont’d) 2 3 i) Have any insulators already been replaced on this line or on a portion of the line to 4 address the cement growth problem as has been experienced on other transmission 5 lines? 6 7 j) Please provide a break...

AI summary The response to Request IR-T8 discusses the replacement of insulators and structures on a 230 kV transmission line between Lingan and Port Hastings, citing maintenance issues and forced outages. The response includes a table showing the number of structures replaced between 2006 and 2009.

Section 2721
I ; h 0'·- -/1_ 57.6 LIGhTNING STRIKE. 3oNDII-JG/GROUND!!\'G GL "SGETATION I " .. .. . . - .. .. ; .1" ·;L·i-I!-I'~.-·-·:;"';/;·~-" · . I . Iv I . f , I TWISTED I I .. : .... :

AI summary The text appears to be a fragment of a document that includes technical drawings or diagrams, possibly related to electrical infrastructure or equipment damage due to a lightning strike. It contains symbols, labels, and annotations that suggest a focus on infrastructure planning or grid modernization.

N-2Redacted Responses to Information Requests 1 passage
of Units Unit cost Total
1323.49 1568.06 1568.06 .00 .00 .00 .00 63-08-7520 POLE POLE L7011L7011 63-08-7520 PENTAPENTA TREATED TREATED 75' CLASS 75' CLASS 2 2 I~J 1854.61 1854.61 .00 .00 63-12-7900 TIMBER L7011L7011 63-12-7900 TIMBER SPAR SPAR 6800 6800 MM TREATED...

AI summary The text contains a table with numerical data and itemized descriptions related to utility infrastructure, including pole and timber specifications, quantities, and costs. The data appears to be from a procurement or project management context, possibly related to infrastructure planning or distribution.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →