B-4Redacted Direct Testimony and Exhibits of Paul Chernick - on behalf of CA 3/17/2011
4 passages
PUBLICATIONS "Environmental Regulation in the Changing Electric-Utility Industry" (with Rachel Brailove), International Association for Energy Economics Seventeenth Annual North American Conference (96–105) . Cleveland, Ohio: USAEE. 1996....
AI summary The text lists several publications related to energy economics, utility resource planning, and environmental regulation. The works span topics such as utility generating asset valuation, energy efficiency, and environmental externalities, with contributions from multiple authors and conferences between 1992 and 1996.
"Evaluation and Cost Effectiveness" (principal author), Ch. 14 of "California Evaluation Framework" Prepared for California utilities as required by the California Public Utilities Commission. 2004. "Energy Plan for the City of New York" (...
AI summary The text lists various publications and reports authored or co-authored by individuals and organizations, focusing on energy efficiency, demand-side management, and utility regulation. These works were prepared for different jurisdictions, including California, New York, Massachusetts, and Vermont, and address topics such as avoided energy costs, performance-based regulation, and integrated resource planning.
PRESENTATIONS - "Adding Transmission into New York City: Needs, Benefits, and Obstacles." Presentation to FERC and the New York ISO on behalf of the City of New York. October 2004. - "Plugging Into a Municipal Light Plant," With Peter Enri...
AI summary The text lists various presentations on energy and utility topics, including transmission needs, distributed utility planning, integrated resource planning, and cost recovery for utilities, delivered by individuals and organizations in different regions and years.
- 81. MDPU 89-239; Inclusion of Externalities in Energy Supply Planning, Acquisition and Dispatch for Massachusetts Utilities; December 1989; April 1990; May 1990. - Critique of Division of Energy Resources report on externalities. Methodo...
AI summary The document presents a list of regulatory proceedings and expert testimony related to energy supply planning, demand-side management, and the inclusion of environmental externalities in utility planning and pricing. It includes critiques and methodologies from various jurisdictions such as Massachusetts, California, Illinois, and Maryland.
B-11Evidence of Alliance of Nova Scotia Sawmillers 3/22/2011
4 passages
Project Description: ESI was the engineer and construction manager for the installation of a new 1300 gpm countercurrent fluidized bed demineralization system. This facility utilizes state-of-the-art technology to minimize the operating co...
AI summary ESI was the engineer and construction manager for the installation of a new 1300 gpm countercurrent fluidized bed demineralization system, replacing the existing hot lime water treatment system. The new system uses advanced technology to reduce operating costs and provide high-purity water for the facility.
(condensing / extracting facility) PRELIMINARY DESIGN BASIS BIOMASS CLASSIFICATION SYSTEM Material Sizing 3" Minus 3" Minus inches Screen Capacity (unloading) 4.2 5.2 tph (wet) Rejects Hog Sizing 2.1 2.6 tph (wet) BIOMASS LONG TERM STORAGE...
AI summary The document outlines the preliminary design basis for a biomass classification and storage system, including specifications for material sizing, screen capacity, storage density, and system dimensions. It also details the reclaim system, boiler feed system, and bottom ash collection and storage systems.
Executive Summary Page II-1 PRELIMINARY DESIGN BASIS BIOMASS CLASSIFICATION SYSTEM Material Sizing 3" Minus 3" Minus inches Screen Capacity (unloading) 4.2 5.2 tph (wet) Rejects Hog Sizing 2.1 2.6 tph (wet) BIOMASS LONG TERM STORAGE SYSTEM...
AI summary The document provides technical specifications for various components of a biomass processing system, including classification, storage, reclaim, and boiler feed systems, as well as ash collection and storage. It outlines dimensions, capacities, and other operational parameters for different fuel types such as logs, bark, and sawdust.
ASSUMPTIONS AND CLARIFICATIONS - 1. ESI has not included use taxes, property taxes, or Owner's insurance as part of this project budgetary pricing. We assume owner will provide this information. - 2. ESI assumes that the site is level with...
AI summary The document outlines various assumptions and clarifications made by ESI regarding the project budget, including the exclusion of certain taxes, site conditions, utilities, and environmental compliance measures. It highlights the assumptions made about site access, soil conditions, and the availability of resources during construction and commissioning.
B-23Renewable electricity Plan - A path to good jobs, stable prices, and a cleaner environment. 4/7/2011
6 passages
Grid: Cleaner and Stronger To increase the grid's capacity to absorb intermittent energy from wind and tidal sources, the province will continue to encourage the use of locally-produced natural gas—a cleaner, quick-responding fuel that is...
AI summary The province aims to enhance grid capacity to handle intermittent renewable energy by promoting locally-produced natural gas as a balancing fuel. Upcoming studies will support grid upgrades and improvements to the interconnection with the North American grid.
Benefits + Costs In the process of transitioning to a system that is cleaner, more diverse, more domestic, and more secure, this plan will support as much as $1.5 billion in green investment—creating good jobs and growing the economy. Spec...
AI summary The plan supports $1.5 billion in green investment, creating 5,000 to 7,500 person-years of jobs in construction, supply, manufacturing, and maintenance. While upfront costs and short-term increases in electricity bills (1-2%) are expected, long-term benefits include stabilized fuel prices, energy security, and protection from fossil fuel volatility and future carbon costs.
5. Market Structure and Governance Nova Scotia's electricity market consists of a vertically integrated utility—NSPI—and six smaller municipal electric utilities.As an integrated utility, NSPI has responsibility for electricity procurement...
AI summary Nova Scotia's electricity market is dominated by NSPI, a vertically integrated utility responsible for procurement, grid operations, and meeting renewable energy targets. The Renewable Electricity Plan emphasizes the cost-effectiveness of an integrated utility while introducing changes to how NSPI procures renewable energy, aiming to enhance energy security, diversity, and affordability.
Electricity Transmission and Distribution in Nova Scotia Adding more renewable electricity to the transmission and distribution systems requires careful planning to maintain system reliability. This is particularly true because most of the...
AI summary The document discusses the need for careful planning and investment in Nova Scotia's transmission and distribution systems to accommodate renewable energy sources and maintain reliability. It highlights the importance of upgrading infrastructure to support intermittent renewable generation, remote locations, and large-scale wind projects, with analysis to be conducted under compliance standards and open for stakeholder feedback.
The Role of Imports and Exports Nova Scotia does not have abundant supplies of untapped hydro power, but nearby provinces do. One way to increase the renewable portion of our energy supply would be to import clean electricity from Newfound...
AI summary Nova Scotia lacks sufficient local renewable energy and relies on imports from nearby provinces. Expanding interconnections with New Brunswick and New England could improve renewable energy imports and exports, but requires significant infrastructure investment. A study by SNC Lavalin suggests that enhancing transmission capacity would support renewable energy integration and backup for intermittent sources.
Reduced Greenhouse Gas Emissions and Improved Air Quality Current methods of electricity generation produce 50 percent of Nova Scotia's greenhouse gas emissions, and the vast majority of our air pollutant emissions. The 2008 Nova Scotia Wi...
AI summary The Renewable Electricity Plan aims to reduce greenhouse gas emissions and improve air quality by displacing fossil fuels with renewables and natural gas. It outlines steps including legislative action, public hearings, and program reviews. The plan also estimates potential cost savings from increased wind capacity and mentions the Integrated Resource Plan's assumptions regarding carbon pricing.
20110406-1Hearing Transcript — 4/6/2011 (ANSS Panel, St. Francis Xavier Univ, Consumer Adv. Panel)
4 passages
hand that I was supposed to assume that it was non- NSUARB-BRD-E-R.10 Page 631 16 of a generic biomass generation 17 facility for the Alliance." 18 MR. HAYES: Yes, sir. 19 MR. OUTHOUSE: Now, I'm just 20 interested in the term "generic." 21...
AI summary The discussion revolves around the assumption of a biomass generation facility being a brownfield project rather than a greenfield project, with specific considerations regarding steam pressure, infrastructure, and compliance with Canadian boiler code and ABMA standards.
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS lay of the land was that Antigonish District Heating 1 Limited owned and operated that facility and St. F.X. 2 would be a steam host only. 3 But those were never substantially 4 tested becaus...
AI summary The text discusses the Antigonish District Heating project, which faced push-back from utilities due to concerns about existing capacity in the province. The project's development was hindered by technical challenges and financial considerations, including discussions with banks regarding debt financing and cost of borrowing.
Page 812 NSUARB-BRD-E-R.10 NSUARB-BRD-E-R.10 Page 813 13 then I have whole reams of biological laws that govern my 14 conduct in around rivers and sedimentation and things like 15 that. 16 So it's I think some of that is 17 required becaus...
AI summary The text discusses the need for archaeological surveys and compliance with environmental regulations when planning infrastructure projects, highlighting the associated costs and uncertainties. The speaker also references the complexity of models used in such planning.
- DICTUM DIGITAL INC. CERTIFIED COURT REPORTERS whether these turbines last 20 years or less, five years, 1 the ones that would be installed in the next few years are 8 with the distribution lines sketched in and the capacity 9 on each of...
AI summary The text discusses the challenges of installing distributed generation in Nova Scotia, referencing sub-station capacity and the use of maps to identify areas with available capacity. It draws a comparison to Consolidated Edison's approach in New York City, suggesting that transparency in sub-station capacity can aid developers without creating competitive or security risks.