N-1-aNotice of Application and Direct Evidence - NSPI - REDACTED (Large File - 59 MB) 1 passage
23 7.5.3 Total Coincident Firm Peak
23 7.5.3 Total Coincident Firm Peak Total Coincident Firm Peak is the demand at the time of NSPI's system peak that is attributable to all firm (non-interruptible) classes (for example residential, small general, etc.), but excludes the no...

AI summary Total Coincident Firm Peak refers to the demand during NSPI's system peak from non-interruptible customer classes, significantly influenced by weather. NSPI must maintain a 20% planning reserve margin to ensure reliability, with forecasts showing increasing demand, such as from 1,751 MW in 2005 to 2,224 MW in 2015.

N-1-aAppendix D - Credit Rating Reports (Large File - 12 MB) 4 passages
.Commentary/Key Trends
ial for significant improvement in NSPI's credit metrics over the course of the next two to three years and/or a reduction in NSPI's risk exposure to volatile fossil fuel costs, a downgrade is likely. A notable rating event since the last...

AI summary The text discusses credit rating trends and risks within the Canadian utility sector, specifically focusing on Nova Scotia Power Inc. (NSPI) and other regional utilities. It highlights the assignment of recovery ratings for first mortgage bonds by Standard & Poor's and identifies key factors influencing credit quality, such as volatile fossil fuel costs and the financial impact of allowed return on equity (ROE) declines. Additionally, it notes upcoming risks related to smart meter implementation and major infrastructure project financing.

Major project developments
Major project developments Major pipeline and LNG developments, and electricity generation projects, such as those earmarked or currently being undertaken by Enbridge Inc. (A-/Stable/ ), Gaz Metro Inc. (A-/Stable/ ), Pembina Pipeline, Tran...

AI summary Standard & Poor's analyzes the impact of major pipeline, LNG, and electricity generation projects on the financial risk profiles of corporate sponsors. The analysis highlights that while these projects carry inherent construction and regulatory risks, they also introduce operational, sovereign, and counterparty risks. Significant concerns are raised regarding the curtailment of financial flexibility due to high costs and the potential use of off-balance-sheet transactions. S&P notes that while some risks are already factored into ratings, others remain premature to assess until final commitments are made.

Issuer Review
Issuer Review issuel IV South Neview BBB+/Stable/ Martin Laurie Conheady Laurie increase of approximately 3% effective May 1, 2006. The LDC will have to respond to written interrogatories but there will not be an oral hearing; a decision b...

AI summary The document provides an issuer review of several utilities, focusing on credit ratings, financial health, and project progress. It notes that Maritime Electric's rating reflects its parent company, Fortis Inc., and mentions the construction of a 50-MW combustion turbine facility in Charlottetown. For LHI, the review discusses its equity layer, a 2005 regulatory decision regarding the recoverability of deferred regulatory assets, and its funds from operations (FFO) interest coverage. It also notes the credit ratings for Newfoundland Power.

Preamble
click on the Issuer name below to see all Research for that Issuer. Issuer Debt Rated Rating Action Rating Trend Notes Latest Event Emera Inc. Medium-Term Notes Confirmed BBB (high) Stb May 16, 2006 Dominion Bond Rating Service ("DBRS") ha...

AI summary Dominion Bond Rating Service (DBRS) confirmed the credit rating of Emera Inc. at BBB (high) with a Stable trend. This confirmation follows Emera's announcement of the Brunswick Pipeline project in New Brunswick. The project involves a 145-kilometre natural gas pipeline connecting the Canaport LNG terminal to the Maritimes and Maritimes & Northeast Pipeline. The project features a 25-year send-or-pay tolling contract with Repsol, with Repsol assuming all development costs and guaranteeing payments, thereby eliminating volume risk for Emera.

N-1-aAppendix J - Proposed Regulation Changes 1 passage
a) Regular Permits and Inspection
a) Regular Permits and Inspection The fee for a regular permit and the maximum number of inspection visits, with respect to an installation will be calculated, as follows.

AI summary The document introduces the methodology for determining the fee for a regular permit and the maximum number of inspection visits allowed for a specific installation. It establishes that these variables will be calculated based on specific criteria, though the specific calculation details are not provided in this excerpt.

N-1-aAppendix G - Cost of Service Study - REDACTED (Large File - 14 MB) 4 passages
ALLOCATION OF AVERAGE WIRE INVESTMENT
ALLOCATION OF AVERAGE WIRE INVESTMENT (1) TOTAL PLANT (2) PRIMARY DEMAND (3) PRIMARY CUSTOMER (4) SECONDARY DEMAND (5) SECONDARY CUSTOMER ( 1) DOMESTIC $64,379 $25,072 $14,507 $10,284 $14,516 ( 2) SMALL GENERAL 3,912 1,655 789 679 790 ( 3)...

AI summary The document presents a detailed breakdown of the allocation of average wire investment and average meter investment for Nova Scotia Power Inc. for the year ending December 31, 2007. It provides data on total plant costs, primary and secondary demand, and customer categories, including domestic, small general, general, and various industrial classifications. The data includes specific unit meter costs and total costs per category to illustrate the distribution of infrastructure investment across different customer types.

ALLOCATION OF DEPRECIATION EXPENSES
ALLOCATION OF DEPRECIATION EXPENSES (1) TOTAL COMPANY (2) (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (9) EXTRA LI INTERR 2 (10) MUNICIPAL (11) UNMETERED (12) ALLOCATION F...

AI summary The document provides a detailed breakdown of depreciation expenses allocated across various demand classifications, including small general, general, industrial (small, medium, large), extra large interruptible, municipal, unmetered, and other categories. It specifies costs associated with different utility functions: generation (steam, hydro, wind, gas turbine, and general property), transmission (plants under and over 69kV), and distribution. Specific allocation factors and demand classifications are provided for each functional area to determine the cost distribution across customer segments.

NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007
NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31, 2007 (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL (...

AI summary The document presents a detailed data table for Nova Scotia Power Inc. regarding the development of allocation factors for the year ending December 31, 2007. It breaks down costs and demand across various customer classes, including Domestic, Small General, General, Large Industrial, and others. Key metrics include Pole & Wire investment demand and customer costs, substation investment demand, meter investment costs, and general plant demand, along with the corresponding percentage of responsibility for each class.

NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31 , 2007
NOVA SCOTIA POWER INC. DEVELOPMENT OF ALLOCATION FACTORS FOR THE YEAR ENDING DECEMBER 31 , 2007 (1) TOTAL COMPANY (2) DOMESTIC (3) SMALL GENERAL (4) GENERAL (5) GENERAL LARGE (6) SMALL INDUSTRIAL (7) MEDIUM INDUSTRIAL (8) LARGE INDUSTRIAL...

AI summary The document presents a detailed data table regarding Nova Scotia Power Inc.'s development of allocation factors for the year ending December 31, 2007. It breaks down total expenditures and percentage responsibility across various customer classes, including Domestic, Small General, General, General Large, Small Industrial, Medium Industrial, Large Industrial, EHV Industrial, Municipal, Unmetered, and Transmission categories. The data covers expenses related to demand, generation, and transmission systems.

N-1-aAppendix H - Proposed Tariffs (Large File - 21 MB) 6 passages
SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a c...

AI summary The document outlines specific conditions for utility service, focusing on metering and transformer ownership. It specifies that metering is typically on the low voltage side; however, if primary metering is required due to customer needs, the customer must provide a capital contribution for the additional costs. It also notes a 1.75% reduction in metered kWh usage for high-voltage side metering. Additionally, the Company may require customers to own transformers for non-standard service provisions.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a cap...

AI summary The text outlines special conditions regarding metering locations and associated costs for customers. While metering is typically placed on the low voltage side of the substation, customers requiring primary metering must provide a capital contribution for the additional costs over secondary metering. It also specifies adjustment factors for metered kW.h usage based on substation high voltage levels, requiring a 1.75% reduction if metering is on the high voltage side of a 69 kV substation, and a 1.75% increase if on the low voltage side of a substation below 69 kV.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a c...

AI summary The document outlines special conditions for a specific tariff, primarily focusing on metering requirements and customer eligibility. It specifies that metering is typically at the low voltage side; however, if primary metering is required due to customer needs, the customer must provide a capital contribution for the additional costs. It also notes a 1.75% reduction in metered kilowatt-hour usage for high voltage side metering and establishes a minimum billing demand of 250 kV.A (225 KW) for continued tariff availability.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - (1) At the option of the Company, supply may be at distribution voltage. Meter readings shall be increased by 1.75% for each transformation between the meter and the low voltage side of the bulk power supply transform...

AI summary The document outlines special conditions for a specific utility tariff, primarily addressing metering and transformer loss adjustments. It specifies that meter readings will be increased by 1.75% for each transformation between the meter and the low voltage side of a bulk power supply transformer to account for losses. It also mandates that customers requiring primary metering must provide a capital contribution for the additional costs. Finally, it establishes eligibility criteria, stating the Company may withdraw the tariff if a customer fails to maintain a regular demand of 2,000 kVA or 1,800 kW.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - (1) At the option ofthe Company, supply may be at distribution voltage. Meter readings shall be increased by 1.75% for each transformation between the meter and the low voltage side of the bulk power supply transforme...

AI summary The document outlines special conditions for a specific electricity tariff, primarily focusing on metering and transformer loss adjustments. It specifies that meter readings will be adjusted by 1.75% for each transformation between the meter and the low-voltage side of the bulk power supply transformer. Additionally, it mandates that customers requiring primary metering must make a capital contribution for the extra costs. Finally, it establishes eligibility criteria, stating the Company may withdraw the tariff if a customer fails to maintain a minimum demand of 2,000 kVA or 1,800 kW.

SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - ( 1) The Company reserves the right to have a separate service agreement if in the opinion of the Company, issues not specifically set out herein must be addressed for the ongoing benefit of the Company and its custom...

AI summary The text outlines special conditions for power supply agreements, granting the Company the right to establish separate agreements for specific customer needs. It mandates that customers must ensure their load does not compromise power supply system integrity, with specific requirements to be defined in a written operating agreement. Key technical factors for assessing system integrity include reliability, harmonic levels, voltage flicker, unbalance, load rate of change, stability, and fault levels. Additionally, it specifies adjustments for transformer losses and transmission voltage metering.

N-1-aAppendix F - Load Forecast Report (Large File - 16 MB) 8 passages
Annual Net System Requirement
Annual Net System Requirement In addition to annual energy requirements, NSPI also forecasts the peak hourly demand for future years. The process uses forecast energy requirements and expected load shapes (hourly consumption profiles) for...

AI summary Nova Scotia Power Inc. (NSPI) forecasts the annual net system requirement by combining annual energy requirements with peak hourly demand projections for future years. This process involves applying expected load shapes—derived from historical consumption profiles—to various customer classes. These load shapes are further adjusted based on anticipated changes, such as the installation of major equipment by customers, to determine the growth of the annual net system peak.

1 Introduction
1 Introduction 2 3 NSPI annually develops a forecast of energy sales and peak demand requirements to assess the 4 impact of customer, demographic and economic factors on the future provincial system load. It 5 is a fundamental input to the...

AI summary Nova Scotia Power Inc. (NSPI) produces an annual forecast of energy sales and peak demand requirements to evaluate how demographic, economic, and customer factors influence future provincial system load. This forecast serves as a foundational component for the Company's planning, budgeting, and operations. The specific forecast discussed covers the 10-year period from 2006 to 2015, utilizing data available as of the spring of 2006.

19 Table 2 Residential Sector Energy
19 Table 2 Residential Sector Energy Year Residential Sector GWh Growth Rate % 2000 3,672.1 4.6 2001 .2 3,741 1.9 2002 3,828.9 2.3 2003 4,010.5 4.7 2004 4,1 13.5 2.4 2005 4,1 14.3 0.0 2006F 4,203.6 2.2 2007F 4,326.9 2.9 2008F 4,466.2 3.2 2...

AI summary The text provides a 15-year historical and forecasted data table for residential sector energy consumption in Nova Scotia, showing a steady growth trend. It notes that the residential load is projected to grow at an average annual rate of 2.4% over the 10-year forecast period. This growth is attributed to a shift toward electric heating due to high furnace oil prices, while natural gas distribution is expected to have a negligible impact on residential load in the near term due to high gas prices and limited infrastructure.

17 System Losses and Unbilled Sales
17 System Losses and Unbilled Sales 18 19 The load forecast is developed using NSPI "billed" sales rather than "accrued" sales to provide a 20 longer historical time series upon which to base the models. Billed sales refers to the amount o...

AI summary Nova Scotia Power Inc. (NSPI) explains its methodology for developing load forecasts, noting that it utilizes 'billed' sales rather than 'accrued' sales to provide a longer historical time series. The text distinguishes between billed sales, accrued sales, and 'unbilled' sales, which result from billing delays. Additionally, NSPI details system losses, estimating transmission losses at 3.0% of the transmission energy requirement and distribution losses at approximately 6.2% of distribution sales, resulting in an average total system loss of 6.9% of the Net System Requirement (NSR).

Preamble
18 The Net System Requirement for the province has grown at an average of 1.9 percent per year 19 from 2000-2005 and is forecast to average 2.0 percent over the next 10 years. 20 21 Nova Scotia Power Inc. 18 2006 Load Forecast

AI summary The document provides a historical and forward-looking overview of the Net System Requirement (NSR) for Nova Scotia. It notes that the NSR grew at an average annual rate of 1.9 percent between 2000 and 2005 and projects a continued average growth rate of 2.0 percent over the subsequent 10-year period. This data is presented as part of the 2006 Load Forecast provided by Nova Scotia Power Inc.

16 Total Coincident Firm Peak
16 Total Coincident Firm Peak 17 18 Total Coincident Firm Peak is the demand at the time ofNSPI's system peak that is attributable 19 to all firm classes (e.g.: residential, small general, etc), but excluding the non-firm customer 20 class...

AI summary The text defines and distinguishes between 'Total Coincident Firm Peak' and 'Total Non-coincident Firm Peak' for Nova Scotia Power Inc. (NSPI). While non-coincident peak refers to the highest demand for combined firm classes regardless of timing, NSPI typically uses the coincident firm peak as a representative proxy for planning purposes. This is because coincident peak data is more readily available monthly, whereas non-coincident peak requires complex hourly load shape analysis. Statistics suggest these peaks are often similar during winter due to cold-weather demand drivers.

1 Industrial Model Input Variables and Contributions
1 Industrial Model Input Variables and Contributions 2 3 Year RQTOS RQTOS contrib GWh MIGRATE MIGRATE contrib GWh SM_Indt·11 SM_Indt·11 contrib GWh SM_Ind\ GWh GWh Actual Growth % 1994 17,535 163.2 1 -28.7 517.8 385.3 519.7 528.3 2.0 1995...

AI summary The document presents a historical analysis of industrial model input variables and their contributions to the Net System Requirement (NSR) in Gigawatt-hours (GWh) from 1994 to 2015. Key variables discussed include Real Quarters to Sales (RQTOS), MIGRATE, and Small and Medium Industrial (SM_Ind) metrics. The data tracks the growth and contribution of these factors to the total GWh, providing a basis for the 2006 Nova Scotia Power Inc. (NSPI) energy requirement forecast.

High and Low Forecast Scenarios
High and Low Forecast Scenarios Low Forecast Scenario Assumptions 1 1, 700 GWh lyr from 2007 onward) Major Paper Mill Closure(- 2 Economic Growth Diminishes (Base case growth rate decreases by 50%) 3 45% reduction in home heating oil price...

AI summary The document outlines two extreme forecast scenarios—High and Low—to test the sensitivity of the 2006 Load Forecast. The Low Forecast assumes diminished economic growth, major paper mill closures, lower heating oil prices, and reduced residential customer additions. Conversely, the High Forecast assumes improved economic growth, new industrial load additions, significant heating oil price increases, and higher residential customer growth. The tables provide year-over-year projections for Net System Requirement (NSR) and Peak demand in GWh and MW from 2007 to 2015 under these varying assumptions.

N-1-aAppendix B - Operating, Maintenance and General Expenses - REDACTED (Large File - 12 MB) 1 passage
(in Thousands of $)
(in Thousands of $) 2005 2006 2006 2007 2007 Fct. Vs. 2007 Fct. Vs. 2006 2007 Fct. Vs otal 16,137 18,085 15,985 (152) (2,100) Responsibility Area 2007 2006 2006 2005 Customer Operations Forecast Forecast Compliance Actual T&D Asset 15,985...

AI summary The document provides a financial analysis of the T&D Asset planning and maintenance costs for 2007 compared to previous periods. It highlights a material decrease in costs compared to the 2006 forecast, attributed primarily to expected reductions in customer-requested work across materials, contracts, and miscellaneous revenue. Conversely, the 2007 forecast shows a labor cost increase relative to 2006 compliance due to union and non-union wage growth and expanded inspection programs, partially offset by staff transfers to the Energy Control Center.

N-2-aRIRs 1 to 39 - NSUARB to NSPI - REDACTED (Large File - 19 MB) 1 passage
For 2007, the expected breakdown of this work and estimated cost is shown below:
For 2007, the expected breakdown of this work and estimated cost is shown below: NSPI External a) DSM in Integrated Resource Planning $40,000 $150,000 b) DSM Potential Study $10,000 $100,000 c) Move DSM from IRP to a Plan in Rates $10,000...

AI summary The text outlines expected costs for various demand-side management (DSM) activities in 2007, including integrated resource planning, DSM potential studies, and DSM programming, with costs split between NSPI and external parties. It also notes that some functions listed in UARB IR-39a are performed by non-NSPI personnel.

N-2-aRIRs 40 to 69 - NSUARB to NSPI - REDACTED (Large File - 34 MB) 2 passages
Response IR-44: (cont'd)
Response IR-44: (cont'd) - d. The increase in Generation Development is due to costs for items such as the Integrated Resource Plan (IRP) process, environmental projects and increased investment associated with planned air emissions techno...

AI summary Nova Scotia Power Inc. provides justifications for increases in Generation Development and pension benefit costs. Generation Development costs are attributed to the Integrated Resource Plan (IRP) process, environmental projects, and air emissions technology investments. Pension benefit cost increases are specifically linked to three factors: a decrease in the discount rate from 6% to 5.5%, an update to the mortality table from GAM-83 to UP-94, and a reduction in the return on assets assumption from 7.5% to 7.25%.

Preamble
- (Note 2) In keeping with the UARB's direction of September 28, 2006, the DSM process became part ofNSPI's Integrated Resource Planning (IRP) process. Subsequent to the filing ofNSPI's October 10, 2006 Rate Application, the UARB approved...

AI summary The text outlines the integration of the Demand Side Management (DSM) process into Nova Scotia Power Inc.'s (NSPI) Integrated Resource Planning (IRP) framework, following a 2006 UARB direction. It notes that the UARB granted an extension for the IRP timeline to mid-2007. Additionally, NSPI indicates that it is still evaluating Third Party Call Overflow options, with a recommendation to be submitted to the UARB later in the year to determine potential cost implications for 2007.

N-2-bRIRs 77 to 84 - NSUARB to NSPI - REDACTED (Large File - 35 MB) 4 passages
Property, plant and equipment is comprised of the following:
Property, plant and equipment is comprised of the following: millions of dollars 2005 Cost Accumulated De~reciation Net Book Value Generation Thermal $1,719.1 $634.1 $1,085.0 Gas turbines 31.1 21.5 9.6 Combustion turbines 71.4 5.4 66.0 Hyd...

AI summary The document provides a detailed breakdown of property, plant, and equipment (PPE) for the year 2005. It categorizes assets into generation (thermal, gas turbines, combustion turbines, hydroelectric, and wind turbines), transmission, distribution, and general plant. The table includes the historical cost, accumulated depreciation, and net book value for each category, totaling $2,406.7 million in net book value for the primary asset classes listed.

Hurricane Juan
Hurricane Juan In Q3, 2003 Nova Scotia was struck by Hurricane Juan, a Category Two hurricane causing extensive damage to Nova Scotia Power's transmission and distribution system. The total cost of the hurricane to the company was $12.6 mi...

AI summary The document details the financial impact of Hurricane Juan on Nova Scotia Power Inc. in Q3 2003. The Category Two hurricane caused extensive damage to the company's transmission and distribution infrastructure. The total cost incurred by the company amounted to $12.6 million, which is broken down into $4.0 million in net after-tax operating costs recorded in 2003 and $8.6 million in capital costs.

Capacity
Capacity To ensure reliability of service, NSPI maintains a generating capacity greater than firm peak demand. The total company-owned generation capacity to 2,293 MW, which is supplemented by 57 megawatts in service contracted with indepe...

AI summary Nova Scotia Power Inc. (NSPI) manages a generating capacity of 2,293 MW, supplemented by 57 MW of contracted capacity, to ensure service reliability and meet regional planning criteria. The company emphasizes maximizing capacity utilization to improve operating efficiency and defer capital investment. Key strategies include maintaining high asset availability through planned maintenance, managing interruptible loads, and optimizing export sales. NSPI reported a capacity utilization of 78% in 2005, a slight decrease from 2004 due to scheduled turbine inspections.

Hourly Loads for a Typical Week - 2007 Forecast
Hourly Loads for a Typical Week - 2007 Forecast Day-Hour Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Fri 9:00 AM 1988.2 2073.2 1861.5 1704.7 1608.9 1519.6 1572.0 1521.0 1538.3 1580.7 1673.0 1759.7 Fri 10:00 AM 1933.4 1980.2 1847.0 1627...

AI summary The document presents a data table showing forecasted hourly electricity loads for a typical week in 2007. It provides a monthly breakdown (January through December) for specific Friday morning and afternoon hours, illustrating seasonal variations in demand. The data serves as a basis for load forecasting and infrastructure planning.

N-2-bRIR 76 - NSUARB to NSPI - REDACTED (Large File - 46 MB) 9 passages
To My Fellow Shareholders
o demonstrate the commitment of our company to change how we approach issues and letter to shareholders collaboratively solve problems. We are listening and acting. This work must and will continue. Our operating companies, Nova Scotia Pow...

AI summary In a letter to shareholders, Christopher G. Huskilson, President and CEO of the company, outlines the organization's commitment to collaborative problem-solving and evolving its approach to industry issues. He highlights the ongoing efforts of operating companies Nova Scotia Power and Bangor Hydro-Electric to modernize facilities for cleaner, safer energy generation, transmission, and distribution. The letter also acknowledges the strategic guidance of the Board of Directors and the dedication of the company's employees.

Preamble
- Nova Scotia Power Inc. ("NSPI") is an electricity generation, transmission and distribution company, provid ing service to the vast majority of the province of Nova Scotia. NSPI has $3 bill ion in assets, and 470,000 customers. NSPI is a...

AI summary The text provides a preamble describing the corporate structure and regulatory environment of Emera's electric utilities. Nova Scotia Power Inc. (NSPI) serves Nova Scotia as a cost-of-service utility regulated by the UARB, while Bangor Hydro-Electric Company (BHE) serves eastern Maine under FERC and MPUC oversight. The document highlights that while these utilities provide stable earnings due to their monopoly positions and regulated markets, Emera seeks growth through infrastructure expansion, including a joint venture for a pumped storage hydro-electric facility in Massachusetts.

Capacity
Capacity To ensure reliability of service, NSPI maintains a generating capacity greater than firm peak demand. The total companyowned generation capacity is 2,293 MW, wh ich is supplemented by 57 megawatts in service contracted with indepe...

AI summary Nova Scotia Power Inc. (NSPI) manages a total generating capacity of 2,293 MW plus 57 MW of contracted capacity to ensure service reliability. The company emphasizes maximizing capacity utilization to improve operating efficiency and defer capital investments. Strategies for optimization include maintaining high plant availability, managing interruptible loads to shift demand from peak to off-peak periods, and optimizing export sales. NSPI reports high performance in capacity-related indicators, ranking among the top units in Canada.

OUTl-OOK
OUTl-OOK Bangor Hydro net earnings for 2006 are expected to be marginally higher than 2005. The Northeast Reliabil ity Interconnect, Bangor Hydro's proposed new transmission line linking New Brunswick and Maine, achieved a significant mile...

AI summary Bangor Hydro Electric (BHE) expects net earnings for 2006 to be slightly higher than in 2005. The company reports progress on the Northeast Reliability Interconnect, a transmission line connecting New Brunswick and Maine. Significant milestones were achieved in 2005, including the receipt of the Certificate of Public Convenience and Necessity from the Maine Public Utilities Commission, followed by the receipt of state and federal environmental permits in January 2006. The line is projected to be in service by late 2007.

Bangor Hydro
Bangor Hydro Bangor Hydro's business consists of four primary components wh ich are each governed by their own regulatory structure. The components include distribution, transm ission , standard costs, and supply (metering, billi ng, and s...

AI summary The document outlines the four primary components of Bangor Hydro's business: distribution, transmission, standard costs, and supply. BHE's distribution business operates under an Alternate Rate Plan (ARP) requiring annual rate decreases and performance penalties, with the potential for higher returns on equity. Transmission is regulated by FERC and linked to the Regional Transmission Organization for New England. BHE can recover stranded costs for regulatory assets and power purchases, while metering and billing costs are recoverable as prudently incurred.

FIVE-YEAR SUMMARY
FIVE-YEAR SUMMARY Year Ended December 31 2005 2004 2003 2002 2001 Electric energy sales (GWh) Residential 4,602.7 4,632.4 4,391.1 4,401.6 3,901.7 Commercial 3,614.1 3,567.4 3,586.1 3,401.8 2,862 .3 Industrial 4,600.3 4, 556.1 4,449 .8 4,2...

AI summary The document provides a five-year historical summary (2001-2005) of electric energy sales, generation sources, customer counts, and infrastructure data. It details a shift in energy sources, noting high reliance on thermal coal while tracking growth in hydro and wind. The data also captures the expansion of the customer base across residential, commercial, and industrial sectors, alongside steady metrics for nameplate capacity, employee counts, and transmission and distribution line lengths.

Getting Connected The Northeast Rei iabi I ity Interconnect
Getting Connected The Northeast Rei iabi I ity Interconnect Reliability, stability and power quality ... combined with reasonable rates, these elements create a robust electrical system. Bangor Hydro is committed to building a strong syste...

AI summary Bangor Hydro discusses its commitment to electrical system reliability, stability, and power quality through the Northeast Reliability Interconnect (NRI). The NRI is a 345 kV transmission line between Maine and New Brunswick designed to support economic development. The company emphasizes a collaborative, multi-stakeholder approach to environmental protection and route selection for the project. Additionally, the text briefly mentions a customer's participation in a Nova Scotia Power forum regarding residential energy efficiency.

Renewable Energy ... Why Wind?
Renewable Energy ... Why Wind? Our customers have expressed strong support for electricity produced from renewable wind energy. Atlantic Canada, with its coastal geography, has strong winds and holds great potential for wind development. I...

AI summary Nova Scotia Power (NSPI) highlights the company's commitment to wind energy, citing strong customer support and Atlantic Canada's favorable coastal geography. The company details specific projects, including the 12-megawatt Glace Bay Lingan Wind Power farm and the 31-megawatt Amherst Wind Energy Project. By securing contracts for 100 megawatts of wind energy, NSPI intends to exceed provincial renewable power generation targets and position Nova Scotia as a leader in the Canadian wind energy industry.

Bear Swamp Acquisition Completed
Bear Swamp Acquisition Completed In 2005, in partnership with Brookfield Power, Emera completed its acquisition of Bear Swamp, a 600 megawatt pumped storage hydro-electric generating facility in northern Massachusetts. Bear Swamp is locate...

AI summary The document confirms the completion of Emera's 2005 acquisition of the Bear Swamp facility, a 600-megawatt pumped storage hydro-electric generating plant in Massachusetts, in partnership with Brookfield Power. The acquisition includes the 10-megawatt Fife Brook run-of-river hydro facility. This move was intended to diversify the company's energy portfolio, increase renewable energy capacity, and expand its presence in the northeastern United States. Additionally, it notes Nova Scotia Power's Trenton generating station received top performance honors from the Canadian Electricity Association.

N-2-bRIRs 1 to 26 - AEC to NSPI - REDACTED (Large File - MB) 1 passage
Upstream
Upstream - -Integrated public and private sector investment - -Market and technology transformation - Multi stakeholder engagement - Delivers social policy - Delivers climate change

AI summary The document outlines the objectives and characteristics of upstream energy initiatives, emphasizing the integration of public and private sector investments. It highlights the importance of market and technology transformation, multi-stakeholder engagement, and the delivery of social policy and climate change objectives within the energy sector.

N-2-cRIRs 1 to 39 - CA to NSPI - REDACTED (Large File - 14 MB) 1 passage
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-20: Please provide the NSPI load forecast for 2007 assuming that DSM is implemented along the lines of the company's DSM proposal and associated budget. Response IR-20: The incl...

AI summary Canada Nova Scotia Electricity Corporation (CA) responded to an information request regarding Nova Scotia Power Inc.'s (NSPI) load forecast for 2007. CA stated that because Demand Side Management (DSM) is integrated into the Integrated Resource Plan (IRP) with a specific timetable, it is not possible to implement NSPI's specific proposal in a manner that would achieve the anticipated year-one DSM effects by 2007.

N-2-dRIRs 1 to 46 - CME to NSPI - REDACTED (Large File - 18 MB) 3 passages
Preamble
In order to mitigate weather related risks, NSPI designs, operates and maintains the system within good utility practices. NSPI has also presented to the UARB a report that recommends increased spending on the NSPI Distribution Vegetation...

AI summary Nova Scotia Power Inc. (NSPI) maintains the distribution system in accordance with good utility practices to mitigate weather-related risks. NSPI submitted a report to the Utility and Rate Board (UARB) recommending increased investment in the Distribution Vegetation Management program specifically aimed at storm hardening the system.

Strengths:
Strengths: - A supportive regulatory environment with cost-of-service regulation mitigates most operating risks. - A dominant industry position due to monopoly service franchise, geographic isolation, and limited interconnections presently...

AI summary The document outlines the strengths of the utility's current operating position. It highlights a supportive regulatory environment that mitigates operating risks and a dominant market position secured by a monopoly franchise and geographic isolation. Additionally, the text notes that market capacity exceeds demand and that the company possesses sufficient operating cash flows to support maintenance-oriented capital expenditures over the next three to five years.

Rationale
ructuring will involve open access to the transmission grid to allow for wholesale competition. Wholesale customers account for less than 2% of energy sales and gross revenues so the initial effect of this first stage is not expected to be...

AI summary The text outlines the rationale for a restructuring plan involving open access to the transmission grid to foster wholesale competition. While the initial impact on retail customers is expected to be minimal due to the small share of wholesale sales, a competitive bidding process for new generation capacity will follow. Nova Scotia Power's new generation will remain regulated on a cost-of-service basis. Additionally, Standard & Poor's assesses Emera's liquidity as adequate, noting sufficient cash flows to cover capital expenditures, dividends, and the C$350 million Capital Project program.

N-2-gRIRs 1 to 25 - Stutz to NSPI - REDACTED (Large File - 18 MB) 6 passages
1 4.0 STREET I CROSSWALK LIGHTING STUDY
1 4.0 STREET I CROSSWALK LIGHTING STUDY Street and Crosswalk lighting represent 90% of the total number of NSPI's unmetered service units and the total revenue collected from customers. As stated previously, NSPIowned streetlights include...

AI summary The text introduces a 2006 update to the 1977 Street and Crosswalk Lighting Study, noting that these services account for 90% of Nova Scotia Power Inc.'s unmetered service units and total revenue. It outlines the composition of charges for NSPI-owned and customer-owned lights, which include power and energy, maintenance, and capital recovery components. The update involves reviewing inventory levels, maintenance costs, installation labor, depreciation, weighted average cost of capital, material costs, lamp life, and revenue based on current inventory.

30 4.1 Schedule 1 - Street and Crosswalk Lighting Inventory
30 4.1 Schedule 1 - Street and Crosswalk Lighting Inventory 31 32 33 The lighting units reviewed in this study were based on inventory levels as of December 2005. The total units were 134,280 which were made up of 120,718 full charge light...

AI summary The text provides an inventory of street and crosswalk lighting units on Nova Scotia Power Inc.'s (NSPI) system as of December 2005. Out of a total of 134,280 units, 120,718 are full charge lights, 894 are power and energy plus maintenance charge lights, and 12,668 are power and energy only lights. The majority of the lighting (83%) consists of High Pressure (Intensity) Sodium lamps with wattages ranging from 70W to 1,000W.

21 4.3 Schedule 3 - Determination of Average Installation Labour Costs associated with Street Lighting Gross Assets
21 4.3 Schedule 3 - Determination of Average Installation Labour Costs associated with Street Lighting Gross Assets 23 24 25 26 27 28 29 30 22 This schedule uses the Gross Street Lighting Assets as of December 31 , 2005 of $44.602M and the...

AI summary This schedule details the methodology for determining average installation labour costs associated with street lighting gross assets as of December 31, 2005. By subtracting the total material capital costs (calculated from current material costs and fixture counts) from the total gross plant value of $44.602M, the applicant derived a total installation cost. This result was then divided by the number of fixtures to establish an average installation labour cost of $181.48 per fixture. Due to missing data for incandescent and fluorescent lighting, a 125% escalation factor was applied to 1977 unit costs.

4.6 Schedules 6 and 7 - Summary and Detail of Street Lighting Material Costs by Fixture Type
4.6 Schedules 6 and 7 - Summary and Detail of Street Lighting Material Costs by Fixture Type 12 13 14 15 16 17 18 19 20 An analysis of current material costs was conducted using information as of September 2005. This analysis involved the...

AI summary The text discusses an analysis of street lighting material costs, specifically examining components like lamps, photocells, davits, wires, connectors, and fasteners. The analysis, based on data from September 2005, concludes that material prices have not changed materially since that date and remain appropriate for the study. Nova Scotia Power Inc. (NSPI) provided a detailed listing of these costs derived from their material inventory control system.

STREET / CROSSWALK LIGHTING STUDY AREA LIGHTING MATERIAL COST ANALYSIS September 2005
STREET / CROSSWALK LIGHTING STUDY AREA LIGHTING MATERIAL COST ANALYSIS September 2005 Light Type Material Fixture Lamp Photocell Davit Wire Connectors Fasteners Street Lights Cost Incandescent < 300 Watts $51.36 $0.00 $0.00 $0.00 $0.00 $0....

AI summary This document provides a detailed cost analysis for street and crosswalk lighting materials as of September 2005. It lists specific material costs for various light types, including Incandescent, Mercury Vapour, Fluorescent, High Pressure Sodium, Low Pressure Sodium, and Metallic Arc lights. The breakdown includes costs for fixtures, lamps, photocells, davits, wires, connectors, and fasteners, providing a comprehensive pricing reference for lighting infrastructure components.

STREET I CROSSWALK LIGHTING STUDY AREA LIGHTING MATERIAL COST ANALYSIS September 2005
STREET I CROSSWALK LIGHTING STUDY AREA LIGHTING MATERIAL COST ANALYSIS September 2005 ITEM DESCRIPTION AVG COST Location 0057155725 BRACKET TAPERED 2"X10' 106.44 0057156020 BRACKET LOWER 2" X 6' 57.25 0057156080 BRACKET FIXED 2" X 8' 87.48...

AI summary This document provides a detailed cost analysis of materials for street and crosswalk lighting as of September 2005. It lists various components, including brackets, plates, and luminaires (specifically Low Pressure Sodium and High Pressure Sodium types), along with their respective average costs and specific location codes. The data serves as a reference for material pricing in infrastructure projects.

N-7-aRIRs 85 to 104 [105 to 107 (Filed 03/05/2007)] - NSUARB to NSPI - REDACTED 1 passage
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: UARB REDACTED Question IR-93: Reference Board Staff IR-3, Attachment 1 The maintenance duration for the steam-electric units totals 38 weeks (sum rows 1-ll).Please provide the comparable total...

AI summary The UARB responds to an information request from NSPI regarding the maintenance duration for steam-electric units from 2000 to 2006. The response provides a table with actual and estimated maintenance weeks, noting that 2006 data is incomplete.

N-7-aRIRs 8 to 23 - HRM to NSPI - REDACTED 5 passages
DETERMINATION OF STREET AND CROSSWALK LIGHTING CONNECTED LOAD BY UNIT BASED ON DECEMBER 2005 INVENTORY LEVELS
DETERMINATION OF STREET AND CROSSWALK LIGHTING CONNECTED LOAD BY UNIT BASED ON DECEMBER 2005 INVENTORY LEVELS Description Rate Code kW.h/Mo. Units Unit Connected Load (kW) Total Load (kW) Incandescent : Incandescent < 300 Watts Incandescen...

AI summary The document provides a detailed inventory and load calculation for street and crosswalk lighting based on December 2005 data for the Halifax Regional Municipality (HRM). It categorizes various lighting types—including Incandescent, Mercury Vapour, and Fluorescent—by specific wattage, listing their respective rate codes, monthly kilowatt-hour (kW.h/Mo.) consumption, unit counts, unit connected loads (kW), and total system loads (kW).

DETERMINATION OF STREET AND CROSSWALK LIGHTING CONNECTED LOAD BY UNIT BASED ON DECEMBER 2005 INVENTORY LEVELS
DETERMINATION OF STREET AND CROSSWALK LIGHTING CONNECTED LOAD BY UNIT BASED ON DECEMBER 2005 INVENTORY LEVELS Description Rate ~ kW.h/Mo. Unit Connected Load lkWl Total Load lkWl Low Pressure Sodium : Low Pressure Sodium 90 Watts Low Press...

AI summary The document presents a detailed inventory and technical calculation of connected loads for street and crosswalk lighting units in Nova Scotia. Based on December 2005 inventory levels, it categorizes various lighting types—including Low Pressure Sodium, High Pressure Sodium, and Metallic Arc lamps—by their specific wattage, monthly kilowatt-hour (kW.h/Mo.) consumption, unit connected load, and total load. The data serves as a technical basis for determining the electrical demand associated with municipal lighting infrastructure.

- g. Please refer to the following table:
- g. Please refer to the following table: Year Average Number of Streetlight Fixtures 2004 133,741 2005 134,280 2006 September 135,768 2007 137,142 - h. There are 530 unmetered billing accounts with more than 10 fixtures per account.

AI summary The text provides historical data on the average number of streetlight fixtures in the service territory from 2004 to September 2007, showing a steady increase from 133,741 to 137,142. Additionally, it identifies 530 unmetered billing accounts that contain more than 10 fixtures per account.

Preamble
- 1. The fifty percent full time equivalent (FTE) position in Billing Services is required to serve the various municipalities that are conducting light emitting diode traffic control light (LED TCL) conversions throughout Nova Scotia, inc...

AI summary The text justifies the necessity of a fifty percent full-time equivalent (FTE) position within the Billing Services department. This role is specifically required to support multiple municipalities across Nova Scotia, including the Halifax Regional Municipality (HRM), as they undertake conversions of traffic control lights to light-emitting diode (LED TCL) technology.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: HRM Question IR-20: Are re-adjustments to the fixture or possibly the pole done during repairs to align lighting correctly? Response IR-20: Adjustments would be made if the light fixture had b...

AI summary In response to Information Request IR-20, the Halifax Regional Municipality (HRM) clarified the criteria for adjusting light fixtures or poles during repairs. They stated that re-adjustments are performed primarily to rectify damage or dislodged fixtures from their original positions. Furthermore, the municipality noted that any repositioning of lighting to provide different coverage areas is initiated specifically by customer requests rather than routine maintenance.

N-7-bRIRs 142 to 143 - SEB to NSPI - REDACTED (Large File - 45 MB) 9 passages
Re-investing in Key Transmission
Re-investing in Key Transmission - Stranded cost recovery provides pool of capital to reconfigure BHE's asset base - Focus on transmission investments - "Northeast Reliability Interconnect" will provide second U.S. / Canada link in northea...

AI summary The text outlines a strategy for re-investing in key transmission infrastructure by leveraging stranded cost recovery to reconfigure the BHE asset base. Key projects include the 'Northeast Reliability Interconnect,' a $110M investment intended to create a second U.S./Canada link to improve reliability and facilitate cross-border electricity sales during offsetting peak seasons. Additionally, the text highlights successful permitting as a strategic strength and identifies further investment opportunities ranging from $70M to $200M in other Maine transmission projects.

Gas Transmission
Gas Transmission - Maritimes & Northeast Pipeline - $2B, 1,300 km pipeline linking Sable gas fields to US northeast - EMA has 12.9% equity investment - Duke and Exxon Mobil also partners - US Phase IV LNG expansion moving forward - > $300M...

AI summary The text provides an overview of gas transmission infrastructure, specifically highlighting the Maritimes & Northeast Pipeline. This $2 billion, 1,300 km pipeline connects Sable gas fields to the US northeast. Emera (EMA) holds a 12.9% equity investment in the project alongside partners Duke and Exxon Mobil. Additionally, the document notes the progression of the US Phase IV LNG expansion project, valued at over $300 million USD.

Brunswick Pipe Delivers LNG and Growth
Brunswick Pipe Delivers LNG and Growth - Recently announced $350 M gas pipeline links Canaport TM LNG terminal to U.S. - Builds on EMA's stake in M&NP - Duke Energy operating partner - Comprehensive risk mitigation for EMA - 11% 14% ROE, o...

AI summary The text highlights the development of a $350 million gas pipeline project designed to link the Canaport LNG terminal to the United States. This project builds upon Emera's (EMA) stake in M&NP and involves Duke Energy as an operating partner. The initiative is described as providing comprehensive risk mitigation for EMA, with a projected return on equity (ROE) of 11% to 14% based on a minimum of 40% equity capitalization.

Open for Business
Open for Business - Strategic decision to pursue growth opportunities based on market characteristics and skills, rather than geography - Strong, growing markets - Assets that fit our skill set, risk profile and capacity - Strategic partne...

AI summary The text outlines a strategic business approach focused on pursuing growth opportunities based on market characteristics and organizational skills rather than geographic location. Key success factors identified include targeting strong, growing markets with assets that align with the company's risk profile and capacity. The strategy emphasizes the importance of strategic partnerships and disciplined execution to achieve these growth objectives.

Bangor Hydro Overview
Bangor Hydro Overview - Regulated Transmission & Distribution utility in restructured market - Transmission FERC regulated - Distribution regulated by Maine Public Utilities Commission under Alternative Rate Plan - Significant stranded cos...

AI summary The document provides an overview of Bangor Hydro, a regulated Transmission & Distribution utility operating within a restructured market. Its transmission assets are regulated by FERC, while its distribution services are regulated by the Maine Public Utilities Commission under an Alternative Rate Plan. The utility holds $580M in assets and serves 115,000 customers. Notably, it possesses a significant stranded cost rate base. Following its acquisition, Emera (EMA) has worked to streamline the utility's cost structure and improve its regulatory relationships.

Increasing Returns at BHE
Increasing Returns at BHE - Stranded cost recovery provides pool of capital to reconfigure BHE's asset base for higher returns - Focus on transmission investments - "Northeast Reliability Interconnect" will provide second U.S. / Canada lin...

AI summary The text discusses Boston Edison's (BHE) strategy to increase returns by leveraging stranded cost recovery to reconfigure its asset base. A primary focus is on transmission investments, specifically the $110M 'Northeast Reliability Interconnect' project, which aims to improve reliability and facilitate cross-border electricity sales between the U.S. and Canada. BHE also intends to capitalize on its success in permitting to pursue additional transmission opportunities in Maine valued between $70M and $200M.

Maritimes & Northeast
Maritimes & Northeast - Maritimes & Northeast Pipeline - $2B, 1,300 km pipeline linking Sable gas fields to US northeast - EMA has 12.9% equity investment - Duke and Exxon Mobil also partners - US Phase IV LNG expansion moving forward - $3...

AI summary The text provides a brief overview of the Maritimes & Northeast pipeline, a $2 billion, 1,300 km infrastructure project connecting Sable gas fields to the US Northeast. It notes that Emera (EMA) holds a 12.9% equity investment in the project alongside partners Duke and Exxon Mobil. Additionally, it mentions the progression of the US Phase IV LNG expansion, which is a $300 million USD project.

Brunswick Pipe Delivers Growth
Brunswick Pipe Delivers Growth - Recently announced $350 M gas pipeline links Canaport ™ LNG terminal to U.S. - Builds on EMA's stake in M&NP - Duke Energy operating partner - Comprehensive risk mitigation for EMA - 11% 14% ROE, on minimum...

AI summary Emera (EMA) is involved in a $350 million gas pipeline project linking the Canaport LNG terminal to the United States. The project leverages EMA's stake in M&NP and involves Duke Energy as an operating partner. The investment aims to provide comprehensive risk mitigation for EMA, with a target return on equity (ROE) of 11% to 14% based on a minimum 40% equity capitalization. The project is currently undergoing hearings with the National Energy Board (NEB).

Open for Business
Open for Business - Strategic decision to pursue growth opportunities based on market characteristics and skills, rather than geography - Strong, growing markets - Assets that fit our skill set, risk profile and capacity - Strategic partne...

AI summary The document outlines a strategic approach for pursuing growth opportunities, emphasizing a shift toward selecting markets based on specific characteristics and organizational competencies rather than geographic location. Key priorities include identifying strong, growing markets and assets that align with the company's risk profile, capacity, and skill set. The strategy highlights the importance of strategic partnerships and disciplined execution as core components for successful expansion.

N-14Evidence filed by John Antonuk, Donald T. Spangenberg, Jr. and John B. Adger, Jr. (on behalf of NSUARB) (Large File - 26 MB) 3 passages
Q. WHAT PRINCIPAL STEPS HAS NSPI TAKEN TO DETERMINE OPTIMUM MEANS FOR MEETING EMISSION-CONTROL REQUIREMENTS?
Q. WHAT PRINCIPAL STEPS HAS NSPI TAKEN TO DETERMINE OPTIMUM MEANS FOR MEETING EMISSION-CONTROL REQUIREMENTS? A. Since the conclusion of the last case, NSPI filed with the Board a plan for Air Emissions Capital Expenditures. While this appl...

AI summary NSPI has taken steps to meet emission-control requirements by filing a plan for Air Emissions Capital Expenditures with the Board, although this application was discontinued. NSPI will now submit an Integrated Resource Plan to the Board, which will satisfy Liberty's recommendation on emission control.

Electricity
Electricity Project Manager for Liberty's audit for the New Jersey Board of Public Utilities of the competitive service offerings of the state's four major electric companies. Scope included corporate structure, governance, and separation,...

AI summary The text outlines various projects managed by Liberty in different states, including audits, acquisitions, and transmission projects. Key activities involve regulatory proceedings related to utility governance, competitive service offerings, and infrastructure development.

Utility Strategy
Utility Strategy Project Manager and Lead Consultant for Liberty's facilitation of strategic planning for Powder River Energy Corporation, a Wyoming electric-distribution cooperative. Project Manager for a second project aimed at improving...

AI summary The text outlines various projects led by Liberty in the energy sector, including strategic planning for electric-distribution cooperatives, development of energy plans for Wyoming, power-marketing initiatives, and assessments of industry restructuring impacts. It also includes work on automated meter reading transitions and workforce management.

N-16Review of NSPI's Fuel Costs on behalf of Avon Valley Greenhouses et al. (AVON) REDACTED (Large File - 38 MB) 3 passages
Section 101
42 ABARE, September 2006 Thermal Coal Forecast, p. 4 62 41 International Coal Report, June 12, 2006. p. 7 Australian miners have in the last several years been limited in their ability to respond to higher demand in the international marke...

AI summary The text discusses infrastructure investments in Australia's coal industry, including rail and port expansions aimed at increasing coal export capacity. Projects like the Sandgate rail grade separation and the Kooragang Island coal loader expansion are highlighted, with some executives expressing concerns about the pace of investment.

COMMITTED AND PLANNED AUSTRALIAN PORT CAPACITY EXPANSIONS
COMMITTED AND PLANNED AUSTRALIAN PORT CAPACITY EXPANSIONS Ports 2005 Actual Throughput Spare and Committed Expansion Total in 2007 Additional Port Proposals Proposed Capacity by 2010 Abbot pt 13.2 1.8 15.0 +35.0 50 DBCT 50.7 9.7 60.4 +24.6...

AI summary The document presents data on committed and planned port capacity expansions in Australia for various ports between 2005 and 2010, including actual throughput, spare and committed expansions, and proposed capacities. The note highlights that port proposals depend on commitments from coal shippers.

LIST OF RELEVANT INDEPENDENT POWER PROJECTS (IPP)
of a 60 mWe gas-fired industrial CHP plant in eastern Germany. - For an American IPP developer, preliminary due diligence for the privatization of an electricity distribution company (GZE) in Poland. - For an American IPP developer, prelim...

AI summary The text outlines various projects and due diligence activities undertaken by American and German IPP developers, including the acquisition and repowering of power plants, market analysis, and assistance with privatization and legal processes in multiple European countries.

N-40RIRs Attachment SEB-NSPI - 4a (Large File - 40 MB) 3 passages
Attachment SEB-NSPI-4a
Attachment SEB-NSPI-4a Name of Respondent (569) Maintenance of Structures 233, 69,403 (570) Maintenance of Station Equipment 4,299,4 3,479,053 _ (571) Maintenance of Overhead Lines _ 4,449, _ 2,586,682 (572) Maintenance of Underground Line...

AI summary The document is a technical reporting table for City Power & Light Company, detailing transmission and distribution expenses. It includes specific line items for maintenance of structures, station equipment, overhead lines, and underground lines, as well as operation supervision and engineering costs. The report also contains placeholders for reporting the disposition of electric energy, including sales for resale and non-requirements.

Table A4.3.10 - Primary Energy for Electrical Generation (PJ) - British Columbia
Table A4.3.10 - Primary Energy for Electrical Generation (PJ) - British Columbia Supply Push Sceni ario Natural Gus 48.95 33.03 28.31 32.92 32.92 49.42 60 63 74.50 88.98 87.50 100.15 113.82 135 73 145.54 154.13 140.15 142.26 156.59 164.67...

AI summary The provided text is a data table (Table A4.3.10) detailing the primary energy sources for electrical generation in British Columbia. It quantifies the energy input from various sources, including Natural Gas, Wind, Biomass, and Small Hydro, measured in Petajoules (PJ). The table tracks these values across multiple scenarios or time periods, showing a general trend of increasing total primary energy requirements over the projected timeline.

Table A4.3.5 - Primary Energy for Electrical Generation (PJ) - Québec
Table A4.3.5 - Primary Energy for Electrical Generation (PJ) - Québec Supply Push Scena erio Natural Gas 1.42 1.41 1.34 134 1 34 1.34 36.47 44.09 71.23 56,37 35.48 74.29 57,11 74.34 92.89 105,93 133.12 111.15 119.87 116,65 137.85 161.85 16...

AI summary The document presents Table A4.3.5, which details the primary energy sources for electrical generation in Québec (measured in Petajoules). It provides a breakdown of energy supply across various scenarios, including Natural Gas, Wind, Biomass, Small Hydro, and Other sources. The data tracks these values over a multi-year period, culminating in a total primary energy requirement of 1,047.30 PJ. The table also includes a 'Techno-Vert Scena' row with associated dates and values.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 1 (Large File - 22 MB) 1 passage
CUSTOMER-OWNED METERS
CUSTOMER-OWNED METERS Customers taking service under this schedule have the option of owning their electric service meter. Customer-owned meters shall be consistent with the Company's billing and metering systems and communication protocol...

AI summary This section outlines the regulations and conditions for customers who choose to own their own electric service meters. While customers may own the hardware, the Company retains control over meter location, maintenance, and disconnection rights. Customers are responsible for all costs associated with the meter, including initial installation, updates, and testing. The Company ensures that customer-owned meters remain compatible with its billing and communication protocols, and the customer assumes all liability for any injury or damage caused by their equipment.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 3 (Large File - 23 MB) 1 passage
AVAILABILITY OF SERVICE
AVAILABILITY OF SERVICE Available to industrial and large commercial customers. Customers shall contract for a definite amount of electrical capacity in KW which shall be sufficient to meet normal maximum requirements but in no case shall...

AI summary The text outlines the availability of service for industrial and large commercial customers, specifying that these customers must contract for a definite amount of electrical capacity in KW. The contracted capacity must be sufficient to meet normal maximum requirements and is subject to a minimum threshold of 3,000 KW. Furthermore, contract capacities must be specified in multiples of 100 KW.

N-44RIRs 76 to 136 - CA to NSPI - REDACTED (Large File - 19 MB) 6 passages
National Retailer / Grocer:
National Retailer / Grocer: - Contributed to a Supply Chain strategy and roadmap project that had a 8 year vision horizon - Assessed current performance through gap analysis, created vision for future state, defined investment requirements...

AI summary The National Retailer / Grocer contributed to a Supply Chain strategy and roadmap project with an 8-year vision. They conducted a gap analysis, defined future state and investment requirements, and developed a business case and benefits model.

— Selected Relevant Experience: -
— Selected Relevant Experience: - - This major gas and electric utility was undergoing a major shift in business strategy. Given these changes the CIO engaged Mr. McCarthy to assist in defining an IT organization to support the business ne...

AI summary The text discusses Mr. McCarthy's experience in assisting major utilities and a global cosmetics company with IT strategy and organization restructuring, focusing on aligning IT with business needs, governance models, and performance benchmarking.

□ Date for final UARB report moved to Jan 8; workplan adjusted to reflect this accelerated schedule; final design of future operating capability will occur after UARB report has been finalized
□ Date for final UARB report moved to Jan 8; workplan adjusted to reflect this accelerated schedule; final design of future operating capability will occur after UARB report has been finalized Key Milestones Target Date Status Conduct curr...

AI summary The final UARB report date has been moved to January 8, with the workplan adjusted to accommodate the accelerated schedule. The final design of future operating capability will occur after the UARB report is finalized. Key milestones include conducting interviews, assessments, and preparing the board report.

- ☐ Holidays scheduled for Dec 25, 26, and Jan 1
- ☐ Holidays scheduled for Dec 25, 26, and Jan 1 Key Milestones Target Date Status Conduct current state assessment 12/15 Complete Document leading practices in terms of 12/19 Complete capability and performance Evaluate NSPI performance a...

AI summary The document outlines key milestones for a project involving the assessment of NSPI's performance and the development of future operating capabilities, with a report submission to the UARB and scheduled workshops.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-1 09: Referring to page 15, could Accenture, if hired by NSPI, provide system assessment, design, and/or implementation for any of the systems that are recommending to be replac...

AI summary The response confirms that Accenture can provide system assessment, design, and implementation services if hired by NSPI for systems recommended for replacement.

RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: CA Question IR-134: Referring to page 114, did the NSPI evaluations on IT upgrades or replacement quantify any benefits for those items? Response IR-134: NSPI replacement or upgrade recommenda...

AI summary NSPI evaluated IT upgrades or replacements but found no operating savings. The recommendations are based on technical deficiencies, such as lack of vendor support.

N-46Rebuttal Evidence of NSPI - REDACTED (Large File - 31 MB) 1 passage
4.3 Outstanding Approvals and Deferrals
e requirement. 67Nancy Brockway, Direct Evidence, at page 18, lines 12-13 68 Nancy Brockway, Direct Evidence, at page 19, lines 25-26 69 NSPI Application and Direct Evidence, at page 182, lines 14-19 The second of these items relates to th...

AI summary The text discusses NSPI's outstanding approvals and deferrals, including the review of its DSM plan, which was incorporated into the IRP process, and the approval of increased vegetation management expenditure following a study and Board recommendations.

N-46Rebuttal Evidence of NSPI - Appendix A to J - REDACTED (Large File 27 MB) 13 passages
Gas Market Studies
e with the highest NPV to the government consistent with economic operation of the project. Mr. Crook provided independent reviews of contract documents and briefed the Prime Minister and the Cabinet. - For a Mitsubishi, Mr. Crook has eval...

AI summary The text outlines the consulting work performed by Mr. Crook and ICF regarding the North American liquefied natural gas (LNG) and natural gas markets. Key activities include evaluating competitive situations for LNG deliveries to the U.S., forecasting ex-terminal gas prices, and conducting market dynamics studies for various entities including Mitsubishi, Anadarko Petroleum, and ExxonMobil. The work involved analyzing pipeline competition, shipping availability, and the regulatory frameworks associated with importing LNG into the U.S. and eastern Canada.

Gas Supply and Transportation Planning
Gas Supply and Transportation Planning - Mr. Crook led a valuation of an Appalachian region gathering pipeline system. The study evaluated the production potential in eastern Pennsylvania, the competing access to market for the production,...

AI summary The text outlines the professional experience of Mr. Crook in gas supply and transportation planning. It details various projects involving asset valuation, gas supply option studies, and capacity analysis for major utilities and energy companies. Key activities include evaluating pipeline systems, optimizing gas supply functions (including LNG and storage), analyzing contract portfolios for cost reasonableness, and assisting in the procurement of outsourced gas supply functions.

Office of Pipeline Regulation (OPR)
Office of Pipeline Regulation (OPR) 1978- 1983 Served as an Industry Economist in Pipeline Certificates Division, managed environmental assessments (EAs) and environmental impact statements (EISs) for pipeline projects, curtailment plans a...

AI summary The document outlines the professional experience of an individual who served as an Industry Economist in the Pipeline Certificates Division of the Office of Pipeline Regulation (OPR) from 1978 to 1983. Key accomplishments include managing environmental assessments for pipeline projects, developing air quality impact assessments for natural gas curtailment plans in Florida, conducting cost-benefit analyses on oil pipeline impacts in Port Everglades, and researching socioeconomic impact costs for the Alaska Natural Gas Transportation System (ANGTS).

Office of Regulatory Analysis (Office of Economics) 1975-1978
Office of Regulatory Analysis (Office of Economics) 1975-1978 Served on the staff of the Commission's Advisor on Environmental Quality, an office created to implement the National Environmental Policy Act (NEPA); helped develop environment...

AI summary The text describes the professional experience of an individual serving in the Office of Regulatory Analysis (Office of Economics) between 1975 and 1978. Key responsibilities included assisting the Commission's Advisor on Environmental Quality in implementing the National Environmental Policy Act (NEPA), developing environmental regulations, and performing policy and management analyses. Notable achievements include developing FERC regulations regarding the National Historic Preservation Act and conducting socioeconomic impact analyses for the Alaska Natural Gas Transportation System (ANGTS).

Bureau of Power (Office of Hydroelectric Licensing) 1972 -1975
Bureau of Power (Office of Hydroelectric Licensing) 1972 -1975 Served on Bureau of Power's environmental staff preparing environmental impact statements specializing in the economic and cultural resource impacts of hydroelectric projects....

AI summary The text describes the professional experience of an individual serving on the Bureau of Power's environmental staff between 1972 and 1975. The role focused on preparing environmental impact statements for hydroelectric projects, specifically analyzing economic and cultural resource impacts. Key achievements include developing the first studies on the impact of power dams on historic and archeological resources, establishing federal policies in response to new legislation, and creating a compliance primer for hydro license applicants.

PUBLICATIONS and PRESENTATIONS
Technologies and Practices;" with M. Lang; presentation to International Energy Agency Conference: "Natural Gas Technologies: A Driving Force for Market Development;" Berlin, Germany, Sept. 1-4, 1996. - "Can Gas Compete on a Long Term Basi...

AI summary This document is a list of historical publications and presentations authored by an individual (likely a representative of Nova Scotia Power or a related entity) between 1989 and 1996. The topics covered include natural gas technologies, market development, integrated resource planning, risk significance in project finance, and the impacts of FERC Order 636. The document also includes a 2007 email correspondence regarding Nova Scotia Power's projected 2007 pension expenses.

Rationale
Rationale The ratings on Emera Inc. and its subsidiary, Nova Scotia Power Inc. (NSPI; BBB/Stable/ ), are based on the consolidated business and financial risk profile of the parent, Emera, which is itself based on the consolidated rating m...

AI summary The text provides a credit rating rationale for Emera Inc. and its subsidiary, Nova Scotia Power Inc. (NSPI). The ratings are supported by stable regulated cash flows from monopoly utility operations in Nova Scotia and Maine. However, the rating is constrained by a moderate financial profile, exposure to higher-risk marketing activities, and a lack of a timely fuel cost recovery mechanism for NSPI. Concerns are also noted regarding potential leverage pressure from new pipeline investments and the volatility of fuel costs relative to regulated rates.

_Business Description
_Business Description Emera is a utility holding company based in Halifax, N.S. The primary subsidiaries of Emera are: - NSPI: NSPI provides electricity generation, transmission and distribution to Nova Scotia. The company is a regulated m...

AI summary This document provides a business description of Emera, a utility holding company based in Halifax, Nova Scotia. It outlines the primary roles of its subsidiaries: Nova Scotia Power Inc. (NSPI), which provides regulated electricity services in Nova Scotia, and Bayonne Hydroelectric Corporation (BHE), which operates in eastern Maine. Additionally, the text details Emera's diverse investments, including a pumped storage hydroelectric facility, a pipeline interest, and its energy services arm, as well as recent plans for a natural gas pipeline project in New Brunswick.

Company Profile
Company Profile Emera (EMA) is a relatively small utility/energy services holding company with total assets of approximately $4 billion. Historically, management's growth strategy has focused on the regions in relatively close proximity to...

AI summary The document provides a company profile of Emera (EMA), a utility and energy services holding company with approximately $4 billion in total assets. Its core business is centered on regulated electric utility subsidiaries, primarily Nova Scotia Power Inc. (NSP) in Nova Scotia and Bangor Hydro-Electric (BHE) in Maine, which account for over 90% of its consolidated assets and net income. The company is also expanding its geographic and sectoral focus through investments in infrastructure assets and a 13% interest in the Maritimes & Northeast Pipeline.

Nova Scotia Utility and Review Board
Nova Scotia Utility and Review Board Mailing address PO Box1692, Unit •M• Halifax. Nova Smtia B313S3 [email protected] Web www.nsuarb.ca Office 3rd Floor 1601 Lower Water Street Halifax, Nova Scotia B3J 3P6 902 424-4448 t 902 424-3919 f...

AI summary The Nova Scotia Utility and Review Board is reviewing Nova Scotia Power Industrial's (NSPI) request to recover $3.6 million for a Distribution System Vegetation Management program. While the Board acknowledges that vegetation encroachment is a primary cause of power outages and supports the program's necessity for reliability, it notes that NSPI failed to include this foreseeable expenditure in its 2007 test year revenue requirement filing. Consequently, approving the request now would result in a revenue requirement increase.

Customer Requested Work Program (CRW)
Customer Requested Work Program (CRW) NSPI's Customer Requested Work Program is directed at addressing safety issues associated with vegetation in proximity to power lines. NSPI typically receives between three thousand and four thousand c...

AI summary Nova Scotia Power Industrial (NSPI) manages a Customer Requested Work Program (CRW) to address safety concerns regarding vegetation encroachment near power lines. NSPI receives 3,000 to 4,000 customer calls annually, with approximately 50% requiring crew dispatch. The company notes an increasing trend in these requests and has assumed an annual cost of $900,000 for vegetation management in its submission.

Section 117
The large hazard tree program targets large trees, near NSPI plant that have died or are dying . . The objective of the program is to remove the tress before they fall apart. The classic example of this in our region is American White Elm,...

AI summary The text describes the Large Hazard Tree Program (LHT), which aims to proactively remove large, dying, or dead trees near Nova Scotia Power Industrial (NSPI) facilities. Using the American White Elm affected by Dutch Elm Disease as a primary example, the program seeks to prevent heavy limbs from falling and causing significant damage to infrastructure or resulting in power outages.

Question 2
Question 2 What are the anticipated roles of NSPI's linemen, scopers, foresters, and contract tree-trimmers in the proposed program?

AI summary The document presents a specific inquiry regarding the proposed program's operational structure. It seeks clarification on the specific roles and responsibilities assigned to various personnel groups, including NSPI's internal linemen, scopers, and foresters, as well as external contract tree-trimmers, within the context of the proposed initiative.

N-52N-52.pdf 1 passage
Nova Scotia Utility and Review Board
ter St., 3rd floor P.O. Box 1692, Box "M" Halifax, N.S. B3J 3S3 / RECEIVED JAN 2 6 2CJ7 Nova Scotia Utility L-._ _ _:::_:_ and __Re___ view _____ Board _ __; Dear Ms. McNeil, This letter is to provide input from GPI Atlantic on the recent...

AI summary GPI Atlantic expresses concern over the proposed Fuel Adjustment Mechanism (FAM) in the 2007 Nova Scotia Power Inc. Rate Case, arguing that it is premature without addressing energy efficiency, renewable energy development, and affordability issues. They emphasize the need to complete the Integrated Resource Planning Process and a Demand Side Management plan before proceeding.

57960Board Decision 3 passages
3.7 Findings
ed the specifics of the Agreement. The AEC confirms that its objection is based on opposition, in principle, to any rate increase pending resolution of a constitutional and Human Rights Act challenge. [34] Similarly, the EAC does not chall...

AI summary The Board approves the Settlement Agreement, noting the AEC's objection to rate increases pending a constitutional challenge and the EAC's concerns about NSPI's reliance on fossil fuels. The Board emphasizes that the IRP process will take precedence over the FAM proceeding and expects the EAC to participate actively in the IRP.

6.0 COMPLIANCE WITH OUTSTANDING BOARD DIRECTIVES
6.0 COMPLIANCE WITH OUTSTANDING BOARD DIRECTIVES [59] There remain outstanding a number of directives from the 2005 and 2006 rate decisions. The operations audit is dealt with in Section 5 of this decision. Other directives include the aff...

AI summary The document outlines outstanding directives from 2005 and 2006 rate decisions, including the affiliate audit and finalizing Liberty's fuel recommendations, which must be addressed promptly ahead of the FAM process. These tasks are part of the IRP process.

7.1 Written and Oral Submissions from the Public
7.1 Written and Oral Submissions from the Public [61] In the advertised Notice of Public Hearing concerning NSPI's rate application and the rate increases proposed, the public were advised that they could file submissions with the Board ou...

AI summary The Nova Scotia Utility and Review Board received public submissions regarding NSPI's rate application, with concerns about the impact of rate increases on low-income customers, environmental issues, and human rights practices. The Board acknowledges these concerns, addresses some through the Integrated Resource Plan and service improvements, and concludes that the rate increases are reasonable and justified.

57968Amended Board Order (and attached Schedules A to C) 2 passages
2.8 ELECTRICAL INSPECTION OF INSTALLATIONS
2.8 ELECTRICAL INSPECTION OF INSTALLATIONS Every electrical installation within NSPI's service area shall be made in conformity with the Electrical Installation and Inspection Act (and regulations made thereunder), and Company standards. A...

AI summary This section outlines the requirements for electrical installations within NSPI's service area, emphasizing compliance with the Electrical Installation and Inspection Act and NSPI's standards. A wiring permit is required before work begins, and NSPI reserves the right to inspect and ensure compliance before connecting any installation.

2.11 UNDERGROUND ELECTRIC SERVICES
2.11 UNDERGROUND ELECTRIC SERVICES Distribution Systems- The Company may supply, install, maintain and own underground distribution systems. A party requesting the installation of an underground distribution system will be required to make...

AI summary The document outlines the rules and responsibilities for underground electric services, including capital contributions required from parties requesting installation or conversion, and the ownership and maintenance responsibilities for primary and secondary services. The Company may replace systems with the lowest cost option, and customers may need to cover additional costs if they prefer underground service over overhead.

57960Board Decision 2 passages
3.7 Findings
ed the specifics of the Agreement. The AEC confirms that its objection is based on opposition, in principle, to any rate increase pending resolution of a constitutional and Human Rights Act challenge. [34] Similarly, the EAC does not chall...

AI summary The Board approves the Settlement Agreement, noting that the AEC opposes any rate increase pending a constitutional and Human Rights Act challenge. The EAC is not objecting to the agreement's terms but is concerned about NSPI's reliance on fossil fuels and the need for Demand Side Management and renewable energy. The Board emphasizes that the IRP process will take precedence over the FAM proceeding.

7.1 Written and Oral Submissions from the Public
7.1 Written and Oral Submissions from the Public [61] In the advertised Notice of Public Hearing concerning NSPI's rate application and the rate increases proposed, the public were advised that they could file submissions with the Board ou...

AI summary The public submitted concerns about rate increases, environmental issues, and human rights practices related to coal suppliers. The Board acknowledges these concerns, addresses some through the Integrated Resource Plan (IRP) process and service improvements, and concludes that the rate increases are reasonable and justified.

57969Notice - NSPI 2007 Rate Application - Preliminary Issues List 1 passage
8. Below the Line Rates:
8. Below the Line Rates: - Proposed ELIIR-2 true up mechanism. - 9. Energy Sales, Net Generation, Gross Generation and Demand Forecast - 2007 compared to recent experience. - 10. Expenditures related to Demand Side Management (DSM), Integr...

AI summary The document outlines various topics for discussion in the proceeding, including proposed mechanisms for ELIIR-2 true up, energy sales and demand forecasts, expenditures related to DSM and IRP, costs of pending UARB reviews, compliance filing processes, and the development of standard filing requirements.

57974NSPI Compliance Filing 2007 Rate Application - REDACTED (Large File - 36 MB) 1 passage
SPECIAL CONDITIONS:
SPECIAL CONDITIONS: - (1) Metering will normally be at the low voltage side of the substation. Should the customer's requirements make it necessary for the Company to provide primary metering, then the customer will be required to make a c...

AI summary The document outlines special conditions for metering and service provisions. It specifies that primary metering may require a capital contribution from the customer and that meter readings on the high voltage side will be adjusted by 1.75%. Additionally, non-standard service provisions may require the customer to own transformers typically provided by the company.

58003Participant responses to Preliminary Issues List for P-886 3 passages
Item 10. Expenditures related to Demand Side Management (DSM), Integrated Resource Plan (IRP), and Emergency Power Outage Response Measures
Item 10. Expenditures related to Demand Side Management (DSM), Integrated Resource Plan (IRP), and Emergency Power Outage Response Measures Specifically with respect to the IRP, concern has been raised by several Stakeholders that the assu...

AI summary The document discusses concerns raised by stakeholders regarding the Integrated Resource Plan (IRP) and Demand Side Management (DSM) initiative. Concerns include the lack of appropriate ratebase risk attached to emissions reductions and the need for rigorous analysis of DSM within the IRP context. BWEL agrees with these concerns and highlights the need for clear goals and cost analysis.

Nancy McNeil - CME Submission re Preliminary Issues List P-886
costs are affected by usage patterns and we feel the cost, pricing and timing of the deployment of types of generation especially away from times of high fuel cost usage should be a matter of review. - 4. The exploitation of renewable ener...

AI summary The submission highlights the interrelation between rate design, fuel costs, and renewable energy deployment, emphasizing the need for a comprehensive review of NSPI's costs, pricing, and resource planning. It also references past recommendations and the need for a hearing on cost of service and future planning.

RECEIVED
RECEIVED OCT 3 1 2005 BERWICK, NOVA SCOTIA Nova Scotia Utility and Review Board October 30, 2006 By e-mail; original follows Ms Nancy McNeil, Regulatory Affairs Officer The Nova Scotia Utility and Review Board P.O. Box 1692, Unit "M", Hali...

AI summary The letter discusses the integration of multiple processes, including the Integrated Resource Plan (IRP) and the Energy Efficiency and Load Integration Report (ELIR-2) rate hearing, and emphasizes the need for a coordinated approach. It supports delaying the IRP timeline to ensure thorough consideration and calls for provincial leadership in energy and emissions policy.

58140Final Submission - Ecology Action Centre 1 passage
Is NSPI Undertaking Reasonable and Prudent Expenses Given Opportunities for Demand Side Management?
for energy efficiency in Nova Scotia - 17. Thus a lack of publicly available evidence currently exists in Nova Scotia regarding the maximum achievable potential for cost-effective energy efficiency. - 18. The EAC understands that in this h...

AI summary The EAC emphasizes the need for a proper framework to procure energy efficiency in Nova Scotia, noting the lack of publicly available evidence on cost-effective energy efficiency potential and the importance of integrating energy efficiency with fuel cost considerations for rational electricity system governance.

58141Closing Submission - NDP - Re: Proposed Settlement Agreement 1 passage
Section G: Demand Side Management
Section G: Demand Side Management One of the ways in which NSPI can assist all its customers, but in particular its low income customers, is through the roll out of a comprehensive demand side management program. So why the continued delay...

AI summary The document highlights the delay in implementing a comprehensive demand side management (DSM) program by NSPI, particularly for low-income customers. The Board's 2006 decision disallowed a $5 million DSM expense and instead required NSPI to develop a plan, delaying the program. The NDP recommends expediting the Integrated Resource Planning (IRP) process and initiating DSM before Fuel Adjustment Mechanism hearings.

58143Closing Submission - Nova Scotia Department of Energy (NSDOE) 1 passage
HER MAJESTY THE QUEEN IN RIGHT OF THE PROVINCE OF NOVA SCOTIA AS REPRESENTED BY THE DEPARTMENT OF ENERGY
HER MAJESTY THE QUEEN IN RIGHT OF THE PROVINCE OF NOVA SCOTIA AS REPRESENTED BY THE DEPARTMENT OF ENERGY Stephen T. McGrath Nova Scotia Department of Justice 400-5151 Terminal Road P.O. Box 7 Halifax, NS B3J 2L6 (902) 424-6288 Phone: Facsi...

AI summary The Nova Scotia Department of Energy commends the agreement reached by NSPI and stakeholders regarding rate setting effective April 1, 2007, but expresses concern that NSPI's focus on a fuel adjustment mechanism may delay ongoing integrated resource planning and demand side management processes.

58240Comments on Preliminary Issues List - Barrington Wind Energy Limited (BWEL) 1 passage
Item 6. Existing Regulations and Proposed Changes
Item 6. Existing Regulations and Proposed Changes The Government of Nova Scotia has stated that the market opening is anticipated to be February 1, 2007 and in addition has begun the process of accommodating the implementation of Financial...

AI summary The document discusses existing regulations and proposed changes related to renewable energy contracts and the Integrated Resource Plan (IRP). Concerns are raised about the assumptions in the IRP not reflecting proper ratebase risk and the need for a clear set of goals for Demand Side Management (DSM). BWEL supports these concerns and highlights the need for further discussion.

58246Comments on Preliminary Issues list - Municipal Electric Utilities of NS Co-operative (MEUNSC) [via Berwick Electric Commission] 2 passages
Section 1
PWG/MAMS/KSD OHS/HRY/RAB Account Info. (902) 538-4009 Superintendent's Office (902) 538-4744 Facsimile (902) 538-4779 Berwick Electric Commission 236 Commercial Street P.O. Box 130 B0P 1E0 Email: [email protected] RECEIVED OCT 3 1 20...

AI summary The letter discusses the need for a coordinated approach to an Integrated Resource Plan (IRP) process, which has incorporated a previous DSM filing and is overlapping with other proceedings. The writer supports Dr. Stutz's position on the IRP timeline, emphasizing the importance of a thorough and government-led process for provincial energy and emissions policy.

Section 2
vernment and the Department of Energy to· show leadership in fonnulating what i$ in fact Provincial energy and emission$ policy. We will aU pay for the outcomes. and we will an live with the outcomes. To the extent that there is a public h...

AI summary The text discusses the need for provincial energy and emissions policy, supports certain environmental measures outside the IRP process, and endorses recommendations for renewable energy and co-generation. It emphasizes the importance of public health benefits and the need to complete the Integrated Resource Plan (IRP) before approving new generation additions.

86477Submission - Re: Rate Hearing Future Filing Requirements 1 passage
VII. Miscellaneous
VII. Miscellaneous - (a) Breakdown of Generati ng Capacity - (b) Reliability Statistics - (c) Plant Maintenance / Depreciation / Additions I Retirement Information - (d) Filings with the Board

AI summary This section outlines various miscellaneous topics including a breakdown of generating capacity, reliability statistics, plant maintenance and depreciation information, and filings with the Board.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →