98234Complainant Submission - Nova Scotia Power Inc. Utility Service Requirements 2023 Edition - Effective May 1, 2023
7 passages
12.10 Service Entrances on Utility Poles Service entrances (no meters) shall only be permitted on utility poles as follows: - 1) Customer meters shall not be installed on any pole, notwithstanding items 5 and 6 below. - 2) Service entrance...
AI summary This section outlines the rules and standards for installing service entrances on utility poles in Nova Scotia. It specifies where service entrances can be installed, the required standards, and conditions for approvals. Key requirements include adherence to specific NSPI drawings and the use of PVC conduit or armoured cable with proper transitions.
13.9 Sewer and Water - 1) Cable should not be installed in the same excavation as sewer and water facilities, except under specific circumstances. Right angle crossings are often unavoidable. - 2) Sufficient clearance is required between s...
AI summary The text outlines guidelines for the installation of cables in relation to sewer and water facilities, emphasizing the need for proper clearance, avoiding simultaneous excavation, and ensuring sewer and water infrastructure is in place before cable installation.
14.13 Primary Line Extensions Individual customers are entitled to an overhead line extension credit, up to a maximum of 92m. NSPI will determine the point of attachment at both the customers' point of connection and NSPI plant. Any length...
AI summary The section outlines the rules for primary line extensions, including the maximum overhead line extension credit of 92m, the responsibility of NSPI in determining suitable lines and points of attachment, and the requirement for customers to contact NSPI for suitability assessments. Customers are also reminded not to assume routing or connection points.
MINIMUM CLEARANCE BETWEEN POWER DUCTS AND FUEL STORAGE TANKS OR PIPE LINES DATE: 2008-09-15 REV DATE: 2016-04-11 DRAWN: H. V. HUYNH STD NO: 1U-ED-41M . APPROVED: Jistu Tadyan SHEET: 1 of 1 (R1) MINIMUM CLEARANCES BETWEEN POWER DUCTS AND PI...
AI summary This document outlines the minimum clearance requirements between power ducts and fuel storage tanks or pipelines, as specified in standard 1U-ED-41M, revised on April 11, 2016. It was drawn by H. V. Huynh and approved by Jistu Tadyan.
DISTRIBUTION UNDERGROUND STANDARDS
AI summary The document discusses distribution underground standards, likely related to infrastructure planning and grid modernization in Nova Scotia.
RECOMMENDED CLEARANCES TO ADJACENT STRUCTURES DATE: 2020-07-02 REV DATE: DRAWN: M. HAL ASZ STD NO: V-ED-13M APPROVED: Jim he tady 1. Ehs. SHT NO: 2 OF 2 l 7
AI summary The document provides recommended clearances to adjacent structures, with details including the date, drawing information, and approval details. It includes a reference to an image and a standard number.
- 2. The item numbers refer to the number shown inside a circle (or ellipse) on the drawings. ITEM NO. DESCRIPTION MFG.CAT.NO. C 1066 CONDUIT – COUPLING PVC TO PVC, FOR USE ON 4" (100 MM) DB TYPE II CONDUIT SCEPTER EC55 C l067 CONDUIT – CO...
AI summary The text lists various items with descriptions and manufacturer catalog numbers, primarily related to electrical conduit, connectors, and enclosures used in infrastructure. These items are referenced by item numbers and include details on materials and specifications.