7 Figure 3– 2025 ESRP Drill Action Items # ESRP Area Status Action Item Status Update 1 Control Centre In Progress Ensure technology at the Control Centre is scalable to meet the increased staffing capacity requirements of a Level 3 or 4 s...
AI summary This section outlines action items for the 2025 ESRP Drill, focusing on ensuring scalability of technology, confirming business continuity plans, updating response protocols, and verifying team rosters for emergency situations.
Deployment of Safety Specialists - 1) As workers are deployed in the restoration effort, the Safety Lead works with the EOC team to identify the requirements and locations for Safety Specialists. - 2) Safety Specialists will be deployed to...
AI summary The deployment of Safety Specialists is outlined in a 1:150 ratio with tool workers, managed by the EOC Safety Lead, and reassessed throughout the event to ensure adequate support for field operations.
6.6.6 Transmission Operations Lead In a major storm event, the Transmission Operations Lead function is responsible for development and execution of the Transmission restoration plan. This is achieved through the deployment of both interna...
AI summary The Transmission Operations Lead is responsible for developing and executing the transmission restoration plan during major storm events, working closely with the EOC and other leads to coordinate restoration efforts and provide status updates.
Satellite EOC Organizational Structure The Satellite EOC will encompass the node roles at that location, along with the following (as required). The node structure can be found in the Regional Operations Subplan. - Satellite Lead - Satelli...
AI summary The Satellite EOC organizational structure includes roles such as Satellite Lead and Satellite Communications Lead, mirroring the main EOC roles described in Section 6.6. These roles are incremental and require additional resources, as outlined in the Regional Operations Subplan.
APPENDIX 7 – Post-Event Review List Post Event Review 4.1 Transmission Lines – Transmission Operations Lead 4.2 Lines damaged, types of damage, location and repairs Transmission Operations Lead 4.3 Cost of repairs Transmission Operations L...
AI summary This appendix outlines a post-event review list focusing on transmission lines, substations, distribution feeders, vegetation management, and staffing. It details areas such as damage assessment, repair costs, customer impact, and staffing adequacy, with responsibilities assigned to various operational leads.