Matter: Nova Scotia Power Inc. - CI C0080671 – LIN1 HP IP Turbine Refurbishment 2026 - $3,249,384
5 passages 4 documents

Infrastructure Planning across all matters →

N-1Work Order 1 passage
Document No: XXX-XX-XXXX-XXXX p. p. 5
Document No: XXX-XX-XXXX-XXXX Process Industries Required fields: Estimate Classification Project Name: LIN1 HP IP Turbine Refurbishment 2026 Started or Preliminary Class 5 Class 4 Class 3 Class 2 Class 1 Maturity Level of Project Definiti...

AI summary The document outlines the project scope and maturity levels for the LIN1 HP IP Turbine Refurbishment 2026, detailing various aspects such as project definition deliverables, scope of work, capacity, location, requirements, and planning. It provides a structured overview of the project's development stages and classifications.

N-2NSPI (NSEB) RIR 1 to 4 - Redacted 2 passages
NON-CONFIDENTIAL p. p. 10
NON-CONFIDENTIAL 1 Request IR-1: 2 3 Page 1 of the application notes that the Lingan Unit 1 steam turbine consists of a dual flow 4 low pressure (DFLP) and a combined high and intermediate pressure (HIP) turbine that 5 convert steam, suppl...

AI summary The document outlines information requests regarding the refurbishment of Lingan Unit 1, including its current capacity, energy production data, emissions classification, retirement plans, alignment with NS Power's 2030 renewable targets, and actions taken to extend the unit's operational life. The requests also seek details on post-retirement roles and utilization factors.

CONFIDENTIAL (Attachment Only) p. p. 10
CONFIDENTIAL (Attachment Only) 1 Request IR-3: 2 3 (a) Was an engineering assessment performed that recommended the proposed overhaul 4 of the components? If yes, please provide the report. If not, please explain why no 5 assessment was co...

AI summary The response to Request IR-3 indicates that no engineering assessment was performed for the proposed overhaul of turbine components, as the decision was based on maintenance strategy targets. Contract estimates were derived from previous project quotes and reviewed by subject matter experts. Risks covered by the 20% contingency are not explicitly detailed.

102137Board Decision Letter 1 passage
M12745 - Nova Scotia Power Inc. - CI C0080671 - LIN1 HP IP Turbine Refurbishment 2026 - $3,249,384 p. pp. 0-2
M12745 - Nova Scotia Power Inc. - CI C0080671 - LIN1 HP IP Turbine Refurbishment 2026 - $3,249,384 The Board has reviewed the application by Nova Scotia Power Inc. (NS Power) dated March 13, 2026. NS Power requested Board approval of a cap...

AI summary Nova Scotia Power Inc. (NSP) seeks approval for a $3.25M capital expenditure to refurbish Lingan Unit 1's turbine components. The Board reviewed NSP's response to information requests, approved confidentiality for specific documents, and concluded the project is necessary to maintain the unit's firm capacity value to the grid. The Board approved the expenditure as justified and essential for grid reliability.

102137Board Decision Letter 1 passage
M12745 - Nova Scotia Power Inc. - CI C0080671 - LIN1 HP IP Turbine Refurbishment 2026 - $3,249,384 p. pp. 0-2
M12745 - Nova Scotia Power Inc. - CI C0080671 - LIN1 HP IP Turbine Refurbishment 2026 - $3,249,384 The Board has reviewed the application by Nova Scotia Power Inc. (NS Power) dated March 13, 2026. NS Power requested Board approval of a cap...

AI summary Nova Scotia Power Inc. (NS Power) requested approval for a $3.25 million capital expenditure to refurbish Lingan Unit 1's turbines. The Board approved the request, citing the necessity of the work and the justification of costs, particularly due to the unit's firm capacity value to the grid. NS Power provided detailed responses to information requests, including historical operating data and cost estimates.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →