N-12025 Report
4 passages
Figure 1 – NS Power's Operating Regions
AI summary The document references Figure 1, which illustrates NS Power's operating regions. No substantive arguments, topics, or cross-references are explicitly discussed in the provided text, which contains only a figure placeholder and page marker.
3 The PLT data for 2026 is set out below in Figure 3 with accompanying notes and explanations. 5 4 6 Figure 3 – PLT Staffing Levels (Actual and Forecast)
AI summary The document presents Figure 3, which outlines PLT staffing levels for 2026, including actual and forecast data, along with notes and explanations.
21 Figure 9 – NS Power System Data (2025) Region # of Km of Km of Substations Regional Peak Customers Distribution Transmission Load Non Lines Lines Coincident (MW) West 117,911 8,443 1,334 57 690 Metro 258,989 5,910 981 40 1,015 Northeast...
AI summary Figure 9 presents NS Power's system data for 2025, including the number of customers, distribution and transmission lines, substations, and regional peak load by region. The document notes a change in the definition of a substation, excluding stepdown transformers from the count.
25 The total length of transmission and distribution lines varies with time as the system changes as a 26 result of new construction, line removals, and as GIS modelling continues to evolve. The system 27 data in the 2026 report is accordi...
AI summary The document discusses changes in the length of transmission and distribution lines over time, influenced by new construction and GIS modeling. It highlights differences between the 2025 and 2026 reports and explains how peak load estimates are calculated. NS Power uses system data to forecast resource needs while balancing affordability for customers.