Matter: Nova Scotia Power Inc. - Storm Outage Analysis Report - January 18-19, 2026
4 passages 3 documents

Infrastructure Planning across all matters →

N-1Report 2 passages
Section 6
Event End Time is noted as the beginning time of the final outage attributable to the storm event. Combined with the start time, these two times provide the bounds of the outage events included in storm analysis. As shown in the graph abov...

AI summary A wind, snow, and rain event on January 18-19, 2026, caused widespread power outages in Nova Scotia. The map illustrates provincial impact by customer hours of interruption (CHI), with over 300 field resources deployed for restoration. Outages continued beyond the storm event's end time, highlighting prolonged service disruption.

Section 52
Contacts with primary lines, opening the West recloser. Cape Failed/Dam Heavy, wet snow accumulation 1/19/2026 Grand Electrical Breton 0 0 30 0 aged caused an insulator to break, 19 5.4 9:01 Étang Failure West Equipment opening the fuse.

AI summary The text references power interruption events on January 19, 2026, at Cape Breton and Étang, attributing failures to heavy snow accumulation causing equipment damage (insulator breakage) and recloser/fuse operations. Dates and locations are noted, with technical terms like 'recloser' and 'insulator' indicating infrastructure issues.

N-2NSPI (NSEB) RIR 1 to 4 1 passage
(c)
(c) Depot # of Field Resources Day 1 Day 2 Day 3 Day 4 Bridgewater 62 102 147 1 Liverpool 24 27 29 1 2 (c) Starting on January 19, additional crews were re-dispatched from elsewhere in the province 3 to the west. Also, additional crews wer...

AI summary The text discusses the deployment of additional crews to address resource challenges on multiple days, with specific numbers of field resources listed for Bridgewater and Liverpool. It also mentions cold load restoration issues on several circuits.

N-3NSPI (NSEB) RIR 1 to 4 - Refiled 1 passage
(c)
(c) Depot # of Field Resources Day 1 Day 2 Day 3 Day 4 Bridgewater 62 102 147 1 Liverpool 24 27 29 1 2 (c) Starting on January 19, additional crews were re-dispatched from elsewhere in the province 3 to the west. Also, additional crews wer...

AI summary The text discusses the deployment of additional crews to address resource challenges during a period of increased demand, including re-dispatching crews within and outside the province, and mentions specific circuits facing cold load restoration issues.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →