N-1CI C0061552 – L6043 Replacements and Upgrades- $3,603,351
5 passages
DESCRIPTION: L6043 is a 28.9-kilometre 138 kV transmission line, built in 1985, that connects the 113H Dartmouth East substation to the 126H Porters Lake and 87H Musquodoboit Harbour substations. This project is required to replace deterio...
AI summary L6043 is a 28.9-kilometre 138 kV transmission line constructed in 1985, connecting Dartmouth East to Porters Lake and Musquodoboit Harbour substations. The project aims to replace deteriorated assets identified through NS Power's inspection program, focusing on approximately 52 structures.
The project includes: • Structure Replacements: 22 Structures • Timber and Insulator Replacements: 27 Structures • Insulator Replacement: 1 Structure • Other Deteriorated Asset Replacements: 2 Structures
AI summary The project involves replacing 22 structures, 27 timber and insulator structures, 1 insulator structure, and 2 other deteriorated assets, totaling 52 replacements across various categories.
Why do this project? The NS Power transmission line inspection program identified deteriorated assets on this line that require replacement to mitigate the risk of unplanned transmission interruptions. Failure to complete this project woul...
AI summary NS Power's transmission line inspection program identified deteriorated assets requiring replacement to prevent unplanned interruptions. Failure to act would compromise system reliability, reduce redundancy, and risk impacting 10,185 customers served by this radial line connected to two distribution substations.
Why do this project now? This work has been prioritized based on the assessed condition of the transmission line assets as determined through NS Power's transmission line inspection program results, data collected throughout the transmissi...
AI summary The project is prioritized due to the critical condition of transmission line assets, as identified by NS Power's inspection and LiDAR data, and its importance to system reliability. The project will be in-service by June 2026, with the Final Cost Date set for February 2028, six months after the last phase completes in August 2027.
Document No: XXX-XX-XXXX-XXXX Project Cost Estimate Input Checklist and Maturity Matrix Transmission Line Infrastructure Required fields: Estimate Classification Project Name: L6043 Replacements and Upgrades Started or Preliminary Class 5...
AI summary The document outlines a checklist and maturity matrix for estimating the costs of a transmission line infrastructure project, focusing on the L6043 Replacements and Upgrades. It includes various project categories such as scope, capacity, location, requirements, technology selection, strategy, planning, and regulatory approval.