Topic/Matter Intersection

Topic:"Infrastructure Planning" in M13173

Matter: Nova Scotia Independent Energy System Operator (IESO Nova Scotia) - 2027/2028 Proposed Expenses, Revenue Requirement and Fees Application
182 passages 2 documents

Infrastructure Planning across all matters →

N-1Application - Redacted 181 passages
1.1 Overview p. p. 125
1.1 Overview - This is the Revenue Requirement, Proposed Expenditures, and Fees application (the - "Application") of the Nova Scotia Independent Energy System Operator (IESO Nova Scotia) for - the fiscal period beginning on April 1, 2027 a...

AI summary IESO Nova Scotia has submitted its Revenue Requirement, Proposed Expenditures, and Fees application for the 2027-2028 fiscal period to the Nova Scotia Energy Board. This is the third such application under Section 29 of the More Access to Energy Act. Established in December 2025, IESO Nova Scotia is a not-for-profit independent energy system operator currently in its early operational phase, focusing on system planning, interconnection management, and energy procurement to transform the province's energy system.

1.2 Background p. p. 125
1.2 Background - This is the third Application in which IESO Nova Scotia seeks approval of its proposed revenue - requirements under s.29 of the MAEA, but is the first such application in which approval is - sought for other proposed expen...

AI summary IESO Nova Scotia is seeking approval from the Nova Scotia Energy Board for its proposed revenue and expenditure requirements under section 29 of the More Access to Energy Act (MAEA). This application marks the first time the organization is seeking approval for expenditures beyond revenue requirements. The text outlines the organizational maturation of IESO Nova Scotia, which transitioned from a board-only entity to a fully staffed organization capable of performing system planning, resource procurement, and interconnection processes following the transfer of functions from Nova Scotia Power.

1.3 Material Changes in the Application p. p. 125
1.3 Material Changes in the Application - The Board and parties will note that this Application differs in some respects from the prior - applications for the 2025/2026 and 2026/2027 fiscal years. The material changes or additions - fall u...

AI summary IESO Nova Scotia outlines material changes in its current application compared to prior filings for the 2025/2026 and 2026/2027 fiscal years. Key updates include a revised transition date for Phase 2A to March 2028 based on completed design work. The application also introduces a more functional alignment of OM&A expenditures within the revenue requirements to improve consistency for Board evaluation. Additionally, it details the phased implementation of the Phase 2 Control Centre project to support independent Balancing Authority and Transmission Operator functions.

General Stakeholders p. p. 125
General Stakeholders - Throughout both last fiscal year and the 2026/2027 fiscal year to date, IESO Nova Scotia has - invested significant time and energy into engaging with a broad range of stakeholders. This - includes, but is not limite...

AI summary IESO Nova Scotia reports on its extensive stakeholder engagement activities during the last fiscal year and the 2026/2027 fiscal year to date. The engagement involves a diverse range of actors, including industry partners, government officials, advocacy groups, and individual residents. Key discussion topics included electricity infrastructure needs, specific energy resource procurements, and the Integrated Resource Plan process. The organization utilizes both formal and informal engagement formats to remain responsive to stakeholder needs.

Indigenous Communities and Organizations p. p. 125
Indigenous Communities and Organizations - Over the course of IESO Nova Scotia's first year of operations, as well as throughout the - 2026/2027 fiscal year to date, the organization has worked to initiate and build relationships - with Mi...

AI summary IESO Nova Scotia is actively building relationships with Mi'kmaw communities and organizations to facilitate their participation in the province's energy system. Key engagement efforts include introducing the independent system operator's role, inviting participation in the Integrated Resource Plan process, and sharing information on infrastructure projects. To formalize these efforts, IESO Nova Scotia has engaged a Mi'kmaw-owned firm to co-develop an organization-wide Indigenous Relations Framework to guide future collaboration.

2.1 Role of the Business Plan p. p. 125
2.1 Role of the Business Plan - IESO Nova Scotia's 2027/2028 Business Plan (Appendix 4) is filed with this Application in - accordance with the Board's direction in M12412. The Business Plan establishes the work IESO - Nova Scotia intends...

AI summary The text outlines the role of IESO Nova Scotia's 2027/2028 Business Plan in relation to its current Application. While the Business Plan and the 2027/2028 Plan describe the organization's intended work and objectives under the More Access to Energy Act (MAEA), the Application specifically details the capital expenditures, operating costs, and revenue requirements needed to achieve those goals. Together, these documents demonstrate how proposed expenditures support the organization's legislative mandate and annual enterprise priorities.

2.2 Legislative Mandate and Business Plan p. p. 125
2.2 Legislative Mandate and Business Plan - The MAEA established IESO Nova Scotia as an independent, not-for-profit energy system - operator and assigned it responsibilities for electricity system planning, the procurement of - energy reso...

AI summary The text outlines the legislative mandate of IESO Nova Scotia as established by the More Access to Energy Act (MAEA). It describes the organization's role as an independent, not-for-profit energy system operator responsible for electricity system planning, resource procurement, and transmission interconnection. The document details a phased transition of responsibilities from Nova Scotia Power, noting that Phase 1 (planning and procurement) is complete, while Phase 2 (real-time system operations) is ongoing. The 2027/2028 Business Plan serves as both an annual operating plan and a transition roadmap for these institutional changes.

2.3.4 Build External Trust and Shape Energy Policy to Benefit Nova Scotians p. p. 125
2.3.4 Build External Trust and Shape Energy Policy to Benefit Nova Scotians - The fourth enterprise priority supports the relationships, transparency and public - accountability necessary for IESO Nova Scotia to discharge its independent m...

AI summary IESO Nova Scotia outlines its fourth enterprise priority, which focuses on building public trust, transparency, and accountability to fulfill its independent mandate. The organization intends to participate in regional and North American reliability activities, conduct required adequacy assessments, and engage with Mi'kmaq and other stakeholders. These activities are essential for effective planning, procurement, and market development. The requested funding covers stakeholder communications, Indigenous Relations Framework development, and public education to ensure informed participation and confidence in the organization's decisions.

1. Proposed capital expenditures p. p. 125
1. Proposed capital expenditures These costs establish the facilities, systems and capabilities required to transfer real- time system operations and related settlement and market-administration functions to IESO Nova Scotia. They are prin...

AI summary The text outlines proposed capital expenditures required to transition real-time system operations, settlement, and market-administration functions to IESO Nova Scotia. These costs are primarily linked to the first enterprise priority and the completion of outstanding operational requirements mandated by the More Access to Energy Act (MAEA).

3. OM&A revenue requirement p. p. 125
3. OM&A revenue requirement These expenses support the continued delivery of IESO Nova Scotia's existing planning, procurement, interconnection, regulatory and corporate responsibilities, while also providing for initial operation of the c...

AI summary IESO Nova Scotia proposes an OM&A revenue requirement of approximately $14.76 million for 2027/2028, which is slightly lower than the 2026/2027 request despite an expanding work program. This consistency is attributed to completed transition activities and the capitalization of Control Centre project costs. However, a significant increase in operating costs is forecasted for 2028/2029 as the organization assumes real-time system operations, primarily involving the transfer of responsibilities from Nova Scotia Power.

2.5 Summary p. p. 125
2.5 Summary - The Business Plan and 2027/2028 Plan establish the operational basis for this Application. It - identifies the work required to continue performing the responsibilities already transferred to - IESO Nova Scotia and to impleme...

AI summary The document outlines that the Business Plan and the 2027/2028 Plan serve as the operational framework for the current Application. These plans identify the necessary work to maintain responsibilities transferred to IESO Nova Scotia and to implement the next phase of the Province's independent system-operator model. The proposed expenditures and revenue requirements are intended to provide the resources required to execute these objectives.

Proposed expenditure and revenue requirements p. p. 125
elated to the capital work in - progress expense of IESO Nova Scotia's Phase 2 Control Centre build-out. - Likewise, the definition of revenue requirement in s.3 of the MAEA includes amortization as - noted, and therefore this Application...

AI summary IESO Nova Scotia is seeking approval for amortization expenses and revenue requirements related to its Phase 2 Control Centre build-out and various Information Technology (IT) assets. The applicant notes that while previous IT costs were covered by a Provincial grant, new assets will now require recovery through the revenue requirement and fees. The request includes specific amortization for IT assets and the Phase 2 Control Centre, with the latter expected to be in-service by March 2028.

3.1.1 Summary of Proposed Expenditures and Revenue Requirement p. p. 125
3.1.1 Summary of Proposed Expenditures and Revenue Requirement - The Application includes the following costs associated with Proposed Expenditures and - Revenue Requirement: - Proposed Expenditures associated with: - o capital costs (capi...

AI summary The Application outlines proposed expenditures and the revenue requirement for IESO Nova Scotia, specifically focusing on the Phase 2 Control Centre Project. It seeks approval for $48.99M in capital work in progress (CWIP) for 2026-2030. The 2027/2028 revenue requirement of $15.19M includes amortization for the Control Centre and other IT assets, alongside $14.76M in ongoing OM&A costs. OM&A costs are projected to decrease slightly due to the conclusion of the current IRP process and lower consulting costs, offset by higher interest expenses and public education costs.

3.2 Proposed Expenditures - Phase 2 Control Centre p. p. 125
3.2 Proposed Expenditures - Phase 2 Control Centre - IESO Nova Scotia's proposed expenditures in this Application are exclusively related to the - capital work in progress costs of its Phase 2 Control Centre8 build-out (the "Project"). Thi...

AI summary IESO Nova Scotia is seeking Nova Scotia Energy Board (NSEB) approval for $48.99 million in capital expenditures to complete Phases 2A and 2B of its Phase 2 Control Centre project. These expenditures, spanning four fiscal years (2026-2030), are part of a $75.4 million project to transition system operations. The project was informed by a value analysis by FTI Consulting and IBM to determine the most cost-effective independent system operator model for grid operations.

Requirements of the More Access to Energy Act p. p. 125
Requirements of the More Access to Energy Act - The More Access to Energy Act (MAEA) requires the transition of system operator responsibilities - from Nova Scotia Power Incorporated (NS Power) to IESO Nova Scotia. In accordance with the -...

AI summary The text discusses the requirements of the More Access to Energy Act (MAEA), which mandates the transition of system operator responsibilities from Nova Scotia Power Incorporated to IESO Nova Scotia. To fulfill these statutory obligations, IESO Nova Scotia must establish a control centre equipped with necessary personnel, systems, and business processes. The document references specific analyses, including the IBM Control Centre Options Analysis and the FTI IESO Nova Scotia Value Case Report, to justify the proposed expenditures for the Phase 2 Control Centre.

Phase 2 Control Centre p. p. 125
Phase 2 Control Centre - Following the successful implementation of Phase 1 in December 2025, IESO Nova Scotia - undertook a comprehensive assessment of options for establishing independent operational - control of Nova Scotia's integrated...

AI summary IESO Nova Scotia is pursuing 'Scenario 4 Enhanced Independence' for the Phase 2 Control Centre, following a comprehensive assessment of options for establishing independent operational control of the province's electricity system. This pathway involves establishing an independent control room space within Nova Scotia Power's Atlantic Data Centre and progressively transferring operational responsibilities. Scenario 4 was selected as the most prudent balance because it achieves high operational independence while avoiding the high costs of new construction and leveraging existing synergies with Nova Scotia Power systems.

3.2.2 Options Analysis p. p. 125
3.2.2 Options Analysis - To develop the option selection process, select an option, and prepare budget estimates, IESO - Nova Scotia engaged the expert support of FTI and IBM. FTI was engaged to develop a value - framework and to quantify...

AI summary The text describes the process for selecting and budgeting options for the Independent Energy System Operator (IESO) Nova Scotia's Control Centre. Nova Scotia engaged FTI Consulting to develop a value framework to quantify the benefits and disbenefits of transitioning from a vertically integrated utility model to an independent system operator model. IBM was engaged to assess five strategic scenarios, ranging from simple models to the construction of a new control facility with new systems, and to provide AACE Class 3 cost estimates for the recommended option.

11 p. p. 125
11 Strategic Scenarios IESO-Lite Near-term planning role only Shared Operations Shared facilities and systems Minimum Independence Limited tactical investments Enhanced Independence Enhanced Capability Fit for future market evolution Contr...

AI summary The document presents a comparative analysis of five strategic scenarios for the evolution of the Independent Energy System Operator (IESO) and Nova Scotia Power (NSP) operational relationship. The scenarios range from 'IESO-Lite' (minimum independence) to 'Fit for future market evolution' (full independence). Each scenario is evaluated based on control center facilities, EMS/SCADA systems, dispatch capabilities, market mechanisms, and projected CAPEX and benefits. The 'Fit for future' scenario requires the highest investment ($167M mid-range) but offers the most robust market operation capabilities and highest projected benefits.

Preamble p. pp. 25-199
or Economic Capacity and Constraint Portfolio Optimization. It is a tool used by Nova Scotia Power (NSP) to optimize the dispatch of generation resources based on economic and operational constraints. SCED (Security Constrained Economic Di...

AI summary The text evaluates four operational scenarios for the establishment of IESO Nova Scotia, focusing on the balance between cost-efficiency and organizational independence. It analyzes 'Shared Operations' (Scenario 2), which leverages existing Nova Scotia Power infrastructure but creates operational inefficiencies and dependency issues. It also considers 'Minimum Independence' (Scenario 3). Ultimately, the document identifies Scenario 4 ('Enhanced Independence') as the selected option, noting the trade-offs between implementation costs, physical separation, and the independence of the IESO Nova Scotia entity.

6 Derived Strategic Scoring Areas p. p. 125
6 Derived Strategic Scoring Areas Scored dimensions Weight Reliability / Operability / Compliance 20% Independence / Transparency 20% Future Optionality 10% Implementation Risk 15% Technical Score 65% Costs (Present Value) 25% Benefits (Pr...

AI summary The document outlines a scoring framework used to evaluate projects or strategic initiatives based on six derived scoring areas. These areas include reliability, independence, future optionality, implementation risk, technical score, costs, benefits, and net value delivery. Each dimension is assigned a specific percentage weight, culminating in a total weighted score of 100% to facilitate a standardized assessment of project value and feasibility.

Section 78 p. p. 125
- Scenario 4 Enhanced Independence scored the highest, balancing operational factors with costs and benefits, as shown in Figure 4 below. As a result, it is the Project scenario sought - 7 for approval in this Application.

AI summary The document identifies 'Scenario 4 Enhanced Independence' as the preferred project scenario for the Application. This selection is based on a comparative analysis that scored the scenario highest by balancing operational factors against associated costs and benefits.

1 Figure 4: Strategy Scenario Scoring Results p. p. 125
1 Figure 4: Strategy Scenario Scoring Results Strategic scenario scoring results ( Scored dimensions Weight IES0-1,lle s red Operallons finimum lndtpendtnct Full Markel OJ)("ralions Reliability/ Operability/ Compliance 20% 1.5 3.0 3.0 4.1...

AI summary The document presents a comparative scoring analysis of various strategic scenarios based on several weighted dimensions. These dimensions include Reliability/Operability/Compliance, Independence/Transparency, Future Optionality, Implementation Risk, CAPEX Costs (Present Value), and Benefits (Present Value). The results are aggregated into a Total Weighted Score, which evaluates the net value delivery of different options, with the scoring results displayed in a comparative table.

4 Scenario 4 p. p. 125
4 Scenario 4 Scenario 4 establishes a dedicated IESO Nova Scotia Control Centre at the Atlantic Data Centre. 6 Scenario 4 also provides the operating model through which IESO Nova Scotia will assume responsibility for the operation of Nova...

AI summary Scenario 4 outlines the establishment of a dedicated IESO Nova Scotia Control Centre at the Atlantic Data Centre. This project includes the physical facility, operational capabilities, business processes, and technological systems required for IESO Nova Scotia to fulfill its statutory mandate as an independent electricity system operator under the More Access to Energy Act. The scope encompasses responsibilities as a Balancing Authority (BA) and Transmission Operator (TOP), focusing on real-time supply-demand balance and reliable transmission system operation.

4 Figure 5: Core Capabilities p. p. 125
4 Figure 5: Core Capabilities CAPABILITY OPERATIONAL PURPOSE SCENARIO 4 PRINCIPAL SYSTEM APPROACH 1. SCADA & Monitoring Provides operators with real- time visibility into the electricity system so they can monitor system conditions and res...

AI summary The document outlines the core operational capabilities required for the electricity system, categorized by their operational purpose, approach (Shared, Transfer, or Build New), and principal systems. Key capabilities include SCADA and monitoring for real-time visibility, Energy Management Systems (EMS) for decision support, dispatch/redispatch for reliability, market management, operational forecasting, and intertie management for coordinating energy flows with neighboring jurisdictions. It also covers outage coordination, training systems, and reporting and analytics.

Phased Approach p. p. 125
Phased Approach - Scenario 4 will be implemented through a phased transition. This is a risk balanced approach - that will help accelerate early deliverables while allowing more time to refine later deliverables - to maximize value. As not...

AI summary The document outlines a phased transition plan for Scenario 4 to balance risk while accelerating early deliverables. The transition involves three phases: Phase 2A (Operational Control), Phase 2B (Settlement), and Phase 2C (Enhanced Independence). These phases progressively transfer operational responsibilities, systems, and capabilities from Nova Scotia Power to IESO Nova Scotia. Phase 2A establishes core dispatch capabilities; Phase 2B transfers market settlement and administration; and Phase 2C provides enhanced technological independence. Phases 2A and 2B together constitute 'Steady State 1'.

Section 88 p. p. 125
3 The cost estimates are organized into two categories: (i) capital costs associated with - 4 establishing the facilities, technology systems, compliance framework, and supporting - 5 infrastructure required for Phase 2 implementation and...

AI summary The document outlines the organization of cost estimates for Phase 2 implementation, dividing them into two primary categories: capital costs and capitalized interest. Capital costs encompass the establishment of facilities, technology systems, compliance frameworks, and supporting infrastructure. Capitalized interest covers the financing of project expenditures during the implementation period, including contingencies. A proposed expenditure profile by fiscal year is provided in the associated figure.

8 Figure 7: Cost Profile by Year p. p. 125
8 Figure 7: Cost Profile by Year Future (All costs in $M) 26/27 27/28 28/29 29/30 Years Total Capex - Phase 2A $ 10.3 $ 30.6 - - - $ 40.9 Capex - Phase 2B - $1.3 $ 5.4 $ 1.4 - $ 8.1 Capex - Phase 2C - - $ 1.9 $ 7.9 $ 16.6 $ 26.4 Total Cape...

AI summary The document presents a cost profile for infrastructure projects, specifically outlining the capital expenditures (Capex) for Phases 2A, 2B, and 2C. The total Capex for Phase 2A is $40.9 million, while Phase 2B is $8.1 million. The project schedule shows a peak in spending for Phase 2B in the 2027/28 period and a significant long-term expenditure for Phase 2C, totaling $16.6 million over the future years.

11 Control Center Build p. p. 125
11 Control Center Build 12 Control Centre Build includes the design, construction, fit-out, physical security systems, and 13 commissioning of t he IESO Nova Scotia Control Centre at the Atlantic Data Centre. This includes 14 t he dedicate...

AI summary The Control Centre Build involves the design, construction, and commissioning of the IESO Nova Scotia Control Centre at the Atlantic Data Centre. This facility is a foundational component for the transition to an independent system operator under the More Access to Energy Act (MAEA). It enables IESO Nova Scotia to independently manage real-time operations of Nova Scotia's bulk electricity system and assume Balancing Authority (BA) and Transmission Operator (TOP) responsibilities, independent of Nova Scotia Power.

IT Costs p. p. 125
IT Costs - IT Costs include the configuration and implementation of shared platforms, transferred - platforms, communications, interfaces, and other technology systems required to support - Phase 2 operations. This includes operational tec...

AI summary The text outlines the Information Technology (IT) costs associated with the configuration and implementation of shared platforms, communications, and interfaces required to support Phase 2 operations. These costs specifically cover the capabilities transferred to IESO Nova Scotia under Scenario 4, including settlement, reporting, and market administration functions. IBM developed the cost estimates using a capability-based assessment approach, incorporating EMS, SCADA, cybersecurity, and data analytics requirements based on vendor data, utility information, and analogous projects.

NERC Compliance p. p. 125
NERC Compliance - NERC Compliance includes compliance program and procedure development, audit readiness, - certification activities, and the documentation required for IESO Nova Scotia to assume BA and - TOP functions. This work supports...

AI summary The text outlines the requirements for NERC Compliance as part of the IESO Nova Scotia transition to assume Balancing Authority (BA) and Transmission Operator (TOP) functions. This involves developing compliance programs, audit readiness, and certification activities aligned with reliability and cybersecurity standards. These activities are essential for certification by NERC and the NPCC. The cost estimate for these compliance activities was developed by IBM based on industry benchmarks and past experience, primarily supporting Phase 2A of the project.

Cyber Security p. p. 125
Cyber Security - Cyber Security includes the security architecture, network controls, monitoring, identity - management, and other cybersecurity controls required to support IESO Nova Scotia's - independent operating environment. This work...

AI summary The document outlines the scope and requirements for cyber security within IESO Nova Scotia's independent operating environment. It specifies that cyber security encompasses security architecture, network controls, monitoring, and identity management necessary to support Balancing Authority (BA) and Transmission Operator (TOP) functions while adhering to NERC CIP requirements. The associated cost estimates were developed by IBM based on industry benchmarks and professional judgment. These activities are essential throughout Steady State 1 and Steady State 2, specifically during Phases 2A and 2B.

Program Integration p. p. 125
Program Integration - Program Integration includes program management, design authority, process development, - change management, quality assurance, and program administration. This category covers the - resources and activities required...

AI summary The document defines Program Integration as the management of design authority, process development, change management, quality assurance, and program administration for the Phase 2 program. It encompasses the resources needed to coordinate various workstreams, oversee vendors and system integrators, and manage dependencies. The cost estimate was developed by IBM using a bottom-up assessment based on detailed design activities, internal resource planning, and experience with similar projects to support the transition from Nova Scotia Power to IESO Nova Scotia.

NS Power Support Costs p. p. 125
NS Power Support Costs - NS Power Support Costs represent incremental costs associated with support provided by NS - Power to facilitate the implementation of Phase 2, including system transition activities, - knowledge transfer, handover...

AI summary The text outlines the 'NS Power Support Costs' associated with the phased transition of responsibilities to IESO Nova Scotia under Scenario 4. These incremental costs include system transition activities, knowledge transfer, handover, reconfiguration of shared systems, and operational readiness. The estimates, developed by IBM using NS Power data, specifically cover activities during Steady State 1 where NS Power maintains support while transferring operational, settlement, reporting, and market administration capabilities to IESO Nova Scotia.

Other p. p. 125
Other - Other costs cover internal IESO Nova Scotia effort, third-party vendor costs for systems to be - transferred or shared, training coordination, market changes and miscellaneous - implementation items. This category captures costs th...

AI summary The text describes 'Other' costs associated with Phase 2 implementation, which include internal IESO Nova Scotia efforts, third-party vendor costs for system transfers or sharing, training coordination, and miscellaneous items related to market changes. It specifies that these costs are necessary to complete the project scope but do not fit into predefined categories. The cost estimate was developed by IBM based on vendor information, industry benchmarks, past project experience, and professional judgment.

3.2.4.1 Class of Estimate p. p. 125
3.2.4.1 Class of Estimate - The Control Centre cost estimates were developed by IBM as a Class 3 Budgetary Estimate in - accordance with AACE estimating standards. The estimate after contingency carries an - expected accuracy range of -15%...

AI summary IBM developed the Control Centre cost estimates as a Class 3 Budgetary Estimate, adhering to AACE standards. The estimate, which carries an expected accuracy range of -15% to +20% after contingency, was derived from a mix of vendor data, Nova Scotia Power information, analogous projects, and industry benchmarks. IBM asserts the estimate is sufficient for current decision-making, with plans to refine precision to Class 2 and Class 1 levels as the project moves into detailed design and procurement.

Section 103 p. p. 125
14 Phase 2A is expected to deliver benefits of approximately $21M/year once the Control Centre 15 is in-service in March 2028. 11When the full projected costs of Phases 2A and 2B are taken into 16 account, Steady State 1 also delivers a po...

AI summary The text discusses the projected economic benefits of Phase 2A and Phase 2B of a project. Phase 2A is expected to yield approximately $21M in annual benefits starting in March 2028 upon the completion of Control Centre 15. While Phase 2B does not provide additional economic benefits beyond Phase 2A, the combined project (Steady State 1) is projected to result in a positive long-term financial outcome, supported by positive Net Present Value (NPV) and Internal Rate of Return (IRR) metrics across various scenarios.

Phase 2A Workstreams p. p. 125
Phase 2A Workstreams (GRA) Governance & Regulatory - Market Rules & Open Access Transmission Tariff (OATT) Establish the governance, regulatory change management, stakeholder approval, and agreement frameworks needed to support the IESO NS...

AI summary The document outlines the specific workstreams for Phase 2A of a project aimed at establishing the Independent Electricity System Operator Nova Scotia (IESO NS). The workstreams are categorized into Governance & Regulatory (covering market rules, OATT, and NERC compliance), Technology & Communications, Control Centre infrastructure, and Operational Frameworks (focused on processes and people). These activities are designed to ensure regulatory compliance, cybersecurity, and operational readiness for the transition to a new market model.

4 Phase 2B Sequencing p. p. 125
4 Phase 2B Sequencing 3 - 5 Although Phase 2B is scheduled for completion after Phase 2A, work on Phase 2B will begin - 6 before Phase 2A is complete. This is necessary because Phases 2A and 2B together comprise - 7 Steady State 1 and are...

AI summary The text explains the sequencing of Phase 2B in relation to Phase 2A of the project to achieve 'Steady State 1'. While Phase 2B is scheduled for completion after Phase 2A, work will begin concurrently because the two phases form an integrated operating model. Phase 2A focuses on independent operation and dispatch, while Phase 2B establishes the necessary settlement, reporting, and participant administration systems. Parallel implementation is required to ensure timely completion of the administrative and market functions mandated by the MAEA.

3.2.7 Project Governance and Risk Management p. p. 125
3.2.7 Project Governance and Risk Management - Given the importance of this Project for IESO Nova Scotia's system dispatch and operation - function under the MAEA, the organization has established a strong governance framework, - including...

AI summary IESO Nova Scotia outlines its governance and risk management framework for the transition of system operator functions from Nova Scotia Power, as mandated by the More Access to Energy Act. The framework includes a Transition Committee under the Board of Directors for oversight, a Project Decision Board for approving key milestones, and a Project Management Office to manage the scope, budget, and schedule of Phase 2. The organization also emphasizes proactive risk identification and mitigation strategies to address the project's complexity.

1. Costs and Timeline p. p. 125
1. Costs and Timeline - Risk: As with any major project, there is a risk of cost increases. The Project is complex, so - there is the potential for cost and/or timeline increases from actual circumstances differing - from assumptions, inte...

AI summary IESO Nova Scotia acknowledges the inherent risks of cost and timeline overruns associated with the Project's complexity. To mitigate these risks, the project utilizes an AACE Class 3 estimate with a 15% contingency, aiming for an 80% confidence interval. Mitigation strategies include quarterly reporting of cost changes, price locking through procurement, and a governance structure for oversight. Furthermore, the phased implementation and annual budgeting under the More Access to Energy Act allow for adjustments based on real-world experience.

2. Reliability Through Transition p. p. 125
2. Reliability Through Transition - Risk: Material reliability incident occurring during transition, cutover, or early operations, - particularly under challenging operating conditions. - Mitigation: The mitigation measures for this risk a...

AI summary The document outlines the risks and mitigation strategies associated with maintaining grid reliability during system transitions, cutovers, or early operations, especially under adverse conditions. Key mitigation strategies include active collaboration with Nova Scotia Power, clear role definition for separated processes, established communication protocols, parallel operations, and extensive testing. Furthermore, the plan advocates for a controlled, staged cutover approach informed by weather assessments and comprehensive internal and external training.

3. IESO Capacity and Resourcing p. p. 125
3. IESO Capacity and Resourcing - Risk: Critical path delays or cost increases due to capacity and resource constraints. - Mitigation: IESO Nova Scotia has developed a project implementation plan that includes work - breakdowns and iterati...

AI summary The text outlines the risks and mitigation strategies associated with the Independent Electricity System Operator Nova Scotia (IESO Nova Scotia) capacity and resourcing for the Project. The primary risk identified is critical path delays or cost increases resulting from resource constraints. To mitigate these, IESO Nova Scotia has developed a project implementation plan featuring work breakdowns and iterative assessments of required skillsets and loading. This data will inform resource acquisition to ensure timely project delivery under a robust governance framework.

4. NS Power Dependency p. p. 125
4. NS Power Dependency - Risk: This Project has significant impacts on NS Power, and this is one of its many priorities. - Delays or cost increases due to the transition leading to unexpected requirements for NS Power - to reconfigure syst...

AI summary The document outlines the operational dependencies and risks associated with the transition of certain capabilities to IESO Nova Scotia from NS Power. Key risks include potential delays and cost increases resulting from necessary system reconfigurations, process updates, and documentation changes. To mitigate these risks, the project utilizes continued collaboration, an expanded Project Management Office purview to manage shared scope, a Joint Transition Committee for leadership communication, and a phased implementation approach to allow for ongoing reassessment of transfer requirements and costs.

5. Cybersecurity p. p. 125
5. Cybersecurity Risk: Cybersecurity risk associated with shared systems, transitional access arrangements, and interim technology solutions implemented during the phased transition to IESO Nova Scotia operations. Mitigation: While certain...

AI summary The document outlines cybersecurity risks and mitigation strategies during the phased transition to IESO Nova Scotia operations. Key risks involve shared systems and transitional access arrangements. Mitigation efforts include network segmentation, identity and access management, and adherence to NERC and NPCC Critical Infrastructure Protection (CIP) standards. The transition plan aims to reduce reliance on NS Power systems over time while building internal expertise at IESO Nova Scotia, supported by external consultants and collaborative risk assessments with NS Power.

3.2.8 Conclusion and Proposed Expenditures Updates p. p. 125
3.2.8 Conclusion and Proposed Expenditures Updates - As noted at the outset of Section 1.7, IESO Nova Scotia is requesting NSEB approval of Project - Phases 2A and 2B, regarding operational dispatch and market settlement functions respecti...

AI summary IESO Nova Scotia is seeking approval for $48.99 million in proposed capital work in progress expenditures for Project Phases 2A and 2B. Phase 2A focuses on operational dispatch and Phase 2B on market settlement functions, both of which are required under the More Access to Energy Act (MAEA). The expenditures span fiscal years 2026/2027 through 2029/2030. IESO Nova Scotia argues that timely approval is necessary to meet in-service dates and secure external financing, while committing to provide updated costs in future s.29 applications.

1 3.3.1 Phase 2 Control Centre p. p. 125
1 3.3.1 Phase 2 Control Centre 2 As described above in section 3.2 regarding the Phase 2 Control Centre project, Phase 2A 3 regarding system operational dispatch functionality, and the corresponding control centre 4 assets, are expected to...

AI summary The text describes the Phase 2 Control Centre project, noting that the Phase 2A system operational dispatch functionality and associated assets (including buildings, hardware, and software) are expected to be in-service by March 2028. Because of this timeline, one month of amortization expense is included in the current revenue requirement. These investments align with IESO Nova Scotia's strategic priority to complete the successful transition of system operations.

3.4 Operating, Maintenance and Administration p. p. 125
3.4 Operating, Maintenance and Administration - In this application, IESO Nova Scotia seeks review and approval of its OM&A revenue requirement for the 2027/28 fiscal year of $14.76M, a slight reduction from IESO Nova Scotia's OM&A revenue...

AI summary IESO Nova Scotia is seeking approval for its 2027/28 Operating, Maintenance and Administration (OM&A) revenue requirement of $14.76M. The budget was developed using historical spending data, external evidence like quotes and contracts, and internal staff expertise. Due to its status as a new organization with limited historical data, IESO Nova Scotia acknowledges potential for variance but emphasizes a forward-looking approach to refining budgeting processes. The OM&A costs cover statutory mandates, administrative functions, and transitioned operational roles from NS Power, including upcoming bulk electricity system dispatch costs.

Staffing and Compensation p. p. 125
Staffing and Compensation - Consistent with IESO Nova Scotia's prior revenue requirement applications (M12412 and - M12663), compensation continues to be the single largest category of cost across all functional - areas of the organization...

AI summary IESO Nova Scotia outlines its staffing and compensation requirements for fiscal year 2027/2028, noting that compensation remains its largest OM&A cost at approximately $6.9M. The staffing plan reflects the organization's growth as it assumes new responsibilities under the More Access to Energy Act (MAEA), specifically the transfer of bulk system control operations from Nova Scotia Power. The plan projects a phased increase from 55 to 91 full-time equivalents (FTEs) by March 2028, prioritizing internal hiring to build expertise and reduce project costs.

3.4.1 System Planning and Procurement p. p. 125
3.4.1 System Planning and Procurement - IESO Nova Scotia system planning and procurement budget primarily consists of costs incurred - to fulfill its statutory object of carrying out Resource Planning and Transmission Planning as - well as...

AI summary IESO Nova Scotia is seeking to include costs associated with system planning, transmission planning, and competitive energy resource procurement in its revenue requirement. The costs cover managing multiple procurement processes prior to contract execution, which aligns with the most recent Integrated Resource Plan (IRP) and the Province's Clean Power Plan. IESO Nova Scotia asserts that these administrative costs are consistent with its strategic priorities regarding system reliability and stakeholder engagement.

1 Figure 18: OM&A Costs for the System Planning and Procurement Cost Category p. p. 125
1 Figure 18: OM&A Costs for the System Planning and Procurement Cost Category Ongoing OM&A Budget (S) Cost Category 2026/2027F Restated 2027/2028F Total System Planning & Procurement 5.10 4.17 Compensation 4.08 3.52 Procurement 1.10 0.74 S...

AI summary The document presents a budgetary breakdown of Operating, Maintenance, and Administration (OM&A) costs for the System Planning and Procurement cost category. It provides a comparison between the restated 2026/2027 forecast and the 2027/2028 forecast. Key cost components include Compensation, Procurement, and System Planning, with a notable reduction in total costs from 5.10 million to 4.17 million, partially offset by third-party recoveries.

3.4.2 System Operations p. p. 125
3.4.2 System Operations This is a new cost category in IESO Nova Scotia's Revenue Requirement Application and has been added in preparation for the transition to assume Phase 2 system operation responsibilities. Costs in this category incl...

AI summary IESO Nova Scotia has introduced a new 'System Operations' cost category in its Revenue Requirement Application to prepare for assuming Phase 2 system operation responsibilities. These costs include staff and consulting expenses transferred from Nova Scotia Power, as well as one month of OM&A costs for the Phase 2 Control Centre. The budget is based on IBM estimates and accounts for both transferred roles and incremental costs for functions where personnel remain with NS Power due to other non-transferring responsibilities.

3.4.3 Information Technology p. p. 125
3.4.3 Information Technology - IESO Nova Scotia is budgeting $2.1M in expenses as part of the Information Technology cost - category. This cost category consists of costs incurred for internal staff, Managed IT Services, - IT Application S...

AI summary IESO Nova Scotia is budgeting $2.1 million for Information Technology costs to support its functional areas and business mandates. These expenses cover internal staff, Managed IT Services, IT Application Software, and other technology services. The organization's technology strategy is heavily influenced by the utilization of cloud and managed services, which are deemed necessary to execute its strategic priorities and meet future requirements.

Comparison to 2026/2027 Budget p. p. 125
Comparison to 2026/2027 Budget - The overall estimated costs associated for Technology are similar to the forecasted amount in - fiscal year 2026/2027. As can be seen in Figure 20 above, some areas are increasing and some - are decreasing....

AI summary The text compares the estimated technology costs for the current period against the forecasted 2026/2027 budget. While overall costs remain similar, specific fluctuations are noted: compensation costs are decreasing because a portion of salary costs for employees working on the Phase 2 Control Centre project are being charged directly to that project. Conversely, Managed IT Services costs are increasing to accommodate a growing number of users.

4 3.4.8 Facilities p. p. 125
4 3.4.8 Facilities 5 IESO Nova Scotia is budgeting $0.61M in costs as part of the Facilities OM&A cost category. This 6 cost category consists of the annual costs associated with IESO Nova Scotia's office space as 7 well as one month of op...

AI summary IESO Nova Scotia is budgeting $0.61M for the Facilities Operating, Maintenance and Administration (OM&A) cost category. These costs cover the annual expenses of IESO Nova Scotia's office space and one month of operating costs for the Phase 2 Control Centre. The expenditure is deemed necessary to fulfill strategic priorities, specifically the transition of system operations, and is compared against the restated 2026/2027 forecast.

5 Conclusion p. p. 125
5 Conclusion In the last 15 months, IESO Nova Scotia has progressed from an organization without employees or officers to a functioning and maturing independent system operator. In that short period, it has completed the Phase 1 transition...

AI summary IESO Nova Scotia concludes that it has successfully transitioned from a nascent entity to a functioning independent system operator over the past 15 months. Key milestones include completing Phase 1 of system planning and procurement, launching generation and energy storage initiatives, and establishing fee recovery mechanisms. The current application represents a maturation of the organization, featuring improved financial controls, accounting policies, and transparency regarding customer expenditure management while committing to ongoing operational improvements.

6 Relief Sought p. p. 125
6 Relief Sought IESO Nova Scotia seeks the following approvals from the Board by March 31, 2027: - 1. Approval of Phase 2 Control Centre project Phases 2A and 2B and capital work in progress proposed expenditures in the total amount of $48...

AI summary IESO Nova Scotia is seeking five specific approvals from the Board by March 31, 2027. These requests include authorization for $48.99 million in capital expenditures for Phase 2 of the Control Centre project (Phases 2A and 2B), approval of the $15.19 million revenue requirement for the 2027/28 fiscal year, and adoption of DVM Guidelines and Accounting Policies. Additionally, the entity seeks a $343k positive variance via the Net Revenue Requirement Deferral and Variance Mechanism and approval of 2027/2028 fees.

NON-CONFIDENTIAL p. p. 167
NON-CONFIDENTIAL Project Key Activities (Updated) Estimated or Actual Completion MAEA Objects Permanent Fee and Cost Recovery Mechanism - Consultant engagement - Stakeholder engagement - Submission in Q1 2026/27 - Application submitted to...

AI summary The document provides an update on key projects under the More Access to Energy Act (MAEA), including the development of a Permanent Fee and Cost Recovery Mechanism, the Integrated Resource Plan (IRP), and procurement activities. Specifically, it notes the launch of a Fast Acting Generation RFP and the formalization of a capacity purchase agreement with New Brunswick Power for the RIGS project. Completion timelines and specific MAEA section references are provided for each initiative.

Priority 1 - Complete the Successful Transition of Independent Grid Operations p. p. 167
Priority 1 - Complete the Successful Transition of Independent Grid Operations Key Activity/ Project Description Estimated Completion MAEA Linkage Independent Grid Operations Planning and Implementation Please refer to Proposed Expenditure...

AI summary The document outlines Priority 1 for the transition to independent grid operations in Nova Scotia, primarily involving the establishment of IESO Nova Scotia. Key activities include the creation of an independent control centre, obtaining NERC certification for Balancing Authority and Transmission Operator functions, and updating market rules and tariffs. The plan also encompasses technology enablement (cybersecurity and IT/OT systems), organizational change management for personnel transitioning from Nova Scotia Power, and the development of a new settlement system to support a competitive electricity market.

Section 367 p. p. 167
As discussed in the Phase 2 Control Centre section, while operational cutover of system operations to IESO Nova Scotia's dedicated control centre is targeted for the end of 2027-28, the full transition of is part of multi-year program that...

AI summary The text outlines the timeline for transitioning system operations to the IESO Nova Scotia dedicated control centre. While the operational cutover is targeted for completion by the end of the 2027-28 period, the full transition is characterized as a multi-year program. This initiative will include ongoing activities related to system stabilization, settlements, and optimization, which are expected to continue through the 2028-32 period.

Priority 2 - Advance System Reliability Building on the IRP p. p. 167
Priority 2 - Advance System Reliability Building on the IRP Key Activity/ Project Description Estimated Completion MAEA Linkage Integrated Resource Plan: IRP Action Plan litems will be identified and reviewed with stakeholders as part of t...

AI summary The document outlines Priority 2 activities aimed at advancing system reliability based on the Integrated Resource Plan (IRP). Key activities include the identification and stakeholder review of IRP Action Plan items, the ongoing procurement of fast-acting generation with a 2027 award target, and the management of the New Brunswick Capacity Purchase. Additionally, it details plans for a technology-neutral capacity Request for Quotation (RFQ) expected in late January 2027, with subsequent procurement steps slated for 2027-28.

Section 369 p. p. 167
The System Planning team will continue to implement the 2026 IRP Action Plan beyond 2027-28. In addition, preparations and pre-IRP studies will be undertaken to prepare for the next IRP, currently anticipated to occur in 2029. The Procurem...

AI summary The System Planning and Procurement teams will continue executing the 2026 IRP Action Plan and Procurement Plan beyond the 2027-28 period. Efforts will also include pre-IRP studies for a planned 2029 cycle. Additionally, the organization intends to apply to the Nova Scotia Energy Board for the recovery of energy resource costs, as permitted under Section 30 of the More Access to Energy Act, with the application expected in 2028/29.

Priority 3 - Strengthen System-User Engagement, Transparency, and Access p. p. 167
Priority 3 - Strengthen System-User Engagement, Transparency, and Access Key Activity/ Project Description Estimated Completion MAEA Linkage Standard Generation Interconnection Procedures Revisions and Federal Energy Regulatory Commission...

AI summary The document outlines Priority 3 of a regulatory plan focused on strengthening system-user engagement, transparency, and access. Key activities include updating Standard Generation Interconnection Procedures to align with FERC Order 2023 recommendations, improving interconnection process functionality by Q4 2027-28, and establishing an updated market participant framework. IESO Nova Scotia aims to create structured collaboration mechanisms, such as a Market Advisory Committee and Participant Information Portal, to encourage new market entrants and improve transparency.

Section 371 p. p. 167
Interconnection Studies and commissioning support will continue beyond 2027-28 as part of ongoing work to facilitate new generation, storage, and load connections to the Nova Scotia transmission system. Depending on the determined scope of...

AI summary The text outlines the ongoing commitment to provide interconnection studies and commissioning support beyond the 2027-28 period. This work is intended to facilitate new connections for generation, storage, and load to the Nova Scotia transmission system. The timeline for full implementation may be extended depending on the defined scope of Interconnection Process Improvements, which may include the deployment of new software systems.

Project Work Plan and Schedule p. p. 167
Project Work Plan and Schedule Object Summary 9(a) exercise and perform the powers, duties and functions assigned to the IESO under this Act, the market rules and its licence; 9(b) enter into agreements with transmitters giving the IESO th...

AI summary The document outlines the statutory powers, duties, and functions of the Independent Electricity System Operator (IESO) as defined under the relevant Act. These responsibilities include maintaining the adequacy and reliability of the bulk electricity system, procuring ancillary services, coordinating power system planning, and facilitating a competitive electricity market. Additionally, the IESO is tasked with procuring various energy resources (including storage and renewables), forecasting electricity demand, and conducting independent planning for transmission and demand-side management.

Re: Government Support for IESO Nova Scotia's Phase 2 Plans p. p. 167
Re: Government Support for IESO Nova Scotia's Phase 2 Plans I am writing to confirm the Government of Nova Scotia's support for IESO Nova Scotia's proposed approach for the Phase 2 project and staged implementation timeline, including the...

AI summary The Government of Nova Scotia confirms its support for IESO Nova Scotia's Phase 2 plans, which include a staged implementation timeline and the transfer of electricity system operational control from Nova Scotia Power to IESO Nova Scotia by spring 2028. The Government supports repurposing Nova Scotia Power's data centre for IESO Nova Scotia's independent control centre to ensure cost-effectiveness and reliability. Additionally, the Government agreed to a $10 million line of credit increase to facilitate planning and procurement activities.

Appendix 6 – IBM Control Centre Analysis p. p. 167
Appendix 6 – IBM Control Centre Analysis NON-CONFIDENTIAL Phase 2: Control Centre Options Analysis and Recommendation Roadmap IBM Report

AI summary This document serves as an appendix containing an analysis and recommendation roadmap for the IBM Control Centre options. It specifically focuses on Phase 2 of the project, which involves evaluating options for the Control Centre and outlining the subsequent roadmap for implementation.

Why it matters: p. p. 180
Why it matters: - Needed to support independent model - Decouples stakeholder commercial discussions from operational cut-over, removing a high-risk dependency - Builds maturity and technical readiness, while rcrJucing 111itial 2A scope -...

AI summary The text outlines the strategic rationale for a phased implementation approach regarding a system transition or operational cut-over. Key objectives include supporting an independent model, decoupling stakeholder commercial discussions from operational execution to mitigate risk, and building technical maturity while reducing initial scope. This approach is intended to improve decision-making, ensure confidentiality and transparency, and provide the flexibility to adapt settlement needs as market and regulatory environments evolve.

Why it matters: p. p. 180
Why it matters: - Achieves the long-term "North Star" operating model and long-term customer benefits - Postpones enhancement capex, allowing design l o be based on real operation;:il experiences, including seeing full functionality of NSP...

AI summary IBM recommends that IESO-NS adopt 'Scenario 4 – Enhanced Independence' as the preferred operating model for Phase 2 of the transition to independent operational control. This move aligns with the More Access to Energy Act (MAEA) and aims to achieve long-term system value and reliability. The proposed phased implementation (2A, 2B, and 2C) is estimated to cost $75 million in capital over five years, with an expected net present value of $219 million and significant annual benefits starting in 2028/29.

IBM's assessment established: p. p. 182
IBM's assessment established: - the preferred long-term BA/TOP operating model for Nova Scotia as Strategic Scenario 4 Enhanced Independence ; - the justification for selecting this model based on evidence and structured evaluation; - the...

AI summary The document outlines the findings of an assessment conducted by IBM regarding the preferred long-term Balancing Authority (BA) and Transmission Operator (TOP) operating model for Nova Scotia. The assessment identifies 'Strategic Scenario 4 Enhanced Independence' as the preferred model. It provides a structured evaluation to justify this selection and proposes a phased implementation pathway (2A / 2B / 2C), specifically recommending Phase 2A as the initial implementation milestone.

3.Legislative and Strategic Context p. pp. 182-183
3.Legislative and Strategic Context Phase 2 represents the final step in the transition of operating responsibilities from NSP to IESO-NS, as required under the 2024 More Access to Energy Act . Following Phase 1 operations, the focus of Ph...

AI summary The text describes Phase 2 of the transition of operating responsibilities from Nova Scotia Power Inc. (NSP) to the Independent Electricity System Operator - Nova Scotia (IESO-NS), as mandated by the 2024 More Access to Energy Act. The objective is to establish independent operational control while prioritizing system reliability, cost optimization, and value for customers. IBM was engaged to ensure the transition balances legislative compliance with prudence, affordability, and long-term operational feasibility, viewing the change as a foundational structural shift rather than a mere compliance exercise.

4.1. Strategic Evaluation Methodology p. pp. 184-185
4.1. Strategic Evaluation Methodology IBM's strategic scenario assessment utilized a structured multi-criteria decision analysis framework to compare the five operating model options on a consistent basis. Assessment criteria were grouped...

AI summary IBM outlines a multi-criteria decision analysis framework used to evaluate five operating model options for the Independent Electricity System Operator - Nova Scotia (IESO-NS). The methodology weights technical and operational factors (reliability, independence, transparency, and implementation) at 65%, while economic value and cost considerations are weighted at 35%. This weighting prioritizes system security and regulatory compliance over purely economic drivers to ensure a prudent, defensible, and evidence-based recommendation for the province's electricity system.

5. Options Assessed p. pp. 185-186
5. Options Assessed The assessment considered five operating model options. IBM evaluated these scenarios using a structured assessment framework (described in Section 4) that combined technical and operational criteria with value delivery...

AI summary IBM evaluated five different operating model options for the utility using a structured assessment framework. The framework weighted technical and operational criteria at 65% and value delivery considerations at 35%. Based on this scoring, Scenario 4 – Enhanced Independence received the highest total weighted score. IBM argues that this recommendation is based on a rigorous comparative assessment rather than subjective judgment.

Scenario 1 - IESO Lite p. p. 186
Scenario 1 - IESO Lite Scenario 1 represents the lowest-independence model. Under this approach IESO-NS would perform planning, monitoring and advisory functions while NSP retained responsibility for real-time BA and TOP operations. No ind...

AI summary The document describes 'Scenario 1 - IESO Lite,' which is characterized as the lowest-independence model for the IESO-NS. In this scenario, IESO-NS would handle planning, monitoring, and advisory functions, while Nova Scotia Power (NSP) would maintain responsibility for real-time Balancing Authority (BA) and Transmission Operator (TOP) operations without establishing an independent control centre or operational systems. While noted for its low cost and simplicity, the model is deemed insufficient for achieving long-term goals regarding operational independence, transparency, and direct accountability.

Scenario 2 - Shared Operations p. p. 186
Scenario 2 - Shared Operations Scenario 2 achieves a faster transition by leveraging NSP's existing operational systems and control room infrastructure. IESO-NS personnel would utilize shared systems and facilities, minimizing implementati...

AI summary The document describes 'Scenario 2 - Shared Operations,' a model where the Independent Electricity System Operator - Nova Scotia (IESO-NS) utilizes Nova Scotia Power Inc.'s (NSP) existing operational systems and control room infrastructure. While this approach accelerates the transition and minimizes implementation costs and timelines, it creates significant operational, cyber, and governance dependencies on NSP. The text notes that while technically feasible, this model restricts the future flexibility and independence of the IESO-NS.

Scenario 3 - Minimum Independence p. p. 186
Scenario 3 - Minimum Independence Scenario 3 introduces an independent IESO-NS control room while continuing to utilize NSP-hosted EMS and SCADA environments. This model improves physical separation and organizational independence but cont...

AI summary Scenario 3 describes a model for the Independent Electricity System Operator - Nova Scotia (IESO-NS) that establishes an independent control room while maintaining reliance on Nova Scotia Power Inc. (NSP) for hosted Energy Management System (EMS) and SCADA environments. While this configuration enhances physical separation and organizational independence compared to previous models, the text notes that it leaves significant operational and cyber dependencies, resulting in only a partial achievement of independence objectives.

Scenario 4 - Enhanced Independence p. p. 186
Scenario 4 - Enhanced Independence Scenario 4 introduces an independent EMS environment, enhanced operational optimization capabilities, stronger cyber segregation and greater operational autonomy. It delivers a level of independence suffi...

AI summary Scenario 4 describes an 'Enhanced Independence' model for the Energy Management System (EMS). This scenario aims to provide an independent EMS environment that features improved operational optimization, stronger cyber segregation, and increased operational autonomy. The goal is to satisfy the long-term legislative intent of the More Access to Energy Act (MAEA) while deliberately avoiding the high implementation complexity associated with a full wholesale market model.

Scenario 5 - Full Market Operations p. p. 186
Scenario 5 - Full Market Operations Scenario 5 builds upon Scenario 4 by introducing a full Market Management System, real-time market operations and day-ahead market functionality. While this option maximizes market capabilities, it also...

AI summary The document discusses Scenario 5 of a strategic assessment regarding the transition to full market operations. This scenario involves implementing a full Market Management System with real-time and day-ahead market functionality. While it offers maximum market capabilities, it is noted to have higher costs, delivery complexity, organizational change requirements, and implementation risks compared to other scenarios. The assessment aims to balance statutory compliance, system reliability, and feasibility with long-term value.

Strategic Scenarios IESO-Lite Near-term planning role only Shared Operations Shared facilities and systems Minimum Independence limited tactical investments nhanced Independence Enhanced Cap p. p. 186
Strategic Scenarios IESO-Lite Near-term planning role only Shared Operations Shared facilities and systems Minimum Independence limited tactical investments nhanced Independence Enhanced CapabiUty Full Markel Operations Ftt for future mark...

AI summary The document outlines five strategic scenarios for the evolution of the Independent System Operator (IESO) and Nova Scotia Power (NSP) relationship. These scenarios range from 'IESO-Lite' (near-term planning role with shared operations) to 'Full Market Operations' (full market evolution). The table details specific operational components—including Control Centre facilities, EMS/SCADA systems, dispatch responsibilities, and market mechanisms—alongside associated capital expenditures (CAPEX), estimated benefits, and implementation timelines for each strategic path.

Tool/Platform Descriptions p. p. 186
Tool/Platform Descriptions - 1. Day-ahead P×Q pairs : This refers to the day-ahead submission of power (P) and quantity (Q) pairs by generators, indicating their planned generation output and associated costs for the next day. These pairs...

AI summary The text describes various technical tools and platforms used for power grid management, including SCADA, EMS, and the NSP optimizer (ECCPO). It evaluates different scenarios for market development, concluding that Scenario 4 is the preferred long-term model. This scenario is favored for balancing legislative compliance, operational independence, reliability, and implementation feasibility over other options. The assessment recommends a phased pathway for reaching the target state rather than a single-step implementation.

5.1. Basis for Scenario Ranking by Assessment Criteria p. pp. 186-188
5.1. Basis for Scenario Ranking by Assessment Criteria Building on the scoring results shown in Fig. 5, this section describes the basis for Scenario 4's ranking against each of the five overarching assessment criteria defined earlier in t...

AI summary The document evaluates Scenario 4 against four key assessment criteria to justify its ranking as the preferred pathway. It highlights that Scenario 4 provides the best balance between operational independence and system reliability compared to less independent options. It also demonstrates superior alignment with the More Access to Energy Act by establishing independent control center operations and governance. Furthermore, the assessment concludes that Scenario 4 offers the most cost-effective balance of value and risk, maximizing long-term benefits for Nova Scotians while remaining affordable.

5.2. Basis of Cost, Benefit and Timeline Estimates p. pp. 188-189
5.2. Basis of Cost, Benefit and Timeline Estimates The strategic scenarios were supported by high-level Class 4 planning estimates developed to provide a consistent basis for comparing costs, benefits and implementation timelines across th...

AI summary The text describes the methodology used to develop Class 4 planning estimates for various strategic scenarios. IBM used a capability-based assessment to decompose requirements into workstreams like EMS, SCADA, and cybersecurity, utilizing a mix of vendor data, NSP information, and analogous projects. FTI Consulting independently developed the benefit estimates, focusing on operational independence and optimization. Timelines were established based on complexity factors such as procurement lead times, facility readiness, and NERC compliance obligations.

6. IBM Recommendation: Scenario 4 - Enhanced Independence p. pp. 189-191
6. IBM Recommendation: Scenario 4 - Enhanced Independence IBM recommends that IESO-NS adopt Scenario 4 – Enhanced Independence as the preferred long-term operating model for Phase 2. IBM's assessment is that Scenario 4 as the preferred lon...

AI summary IBM recommends Scenario 4 – Enhanced Independence as the preferred long-term operating model for Phase 2 of the IESO-NS transition. This scenario is designed to provide IESO-NS with the operational independence required to assume BA and TOP functions. IBM justifies this recommendation based on its superior balance of legislative alignment with the MAEA, operational reliability, transparency, long-term value creation, and a feasible phased delivery approach compared to other strategic scenarios.

7.Recommended Delivery Pathway: Phase 2A / 2B / 2C p. pp. 191-192
7.Recommended Delivery Pathway: Phase 2A / 2B / 2C IBM recommends that Scenario 4 be implemented through a phased 2A / 2B / 2C delivery pathway. This phased approach is central to the recommendation. It allows IESO-NS to progress toward th...

AI summary IBM recommends a phased delivery pathway (2A, 2B, and 2C) for Scenario 4 to transition IESO-NS toward its long-term end-state. This approach manages complexity and preserves reliability by creating decision points. Steady State 1 (Phases 2A and 2B) establishes the first independent operating model by transferring BA/TOP responsibilities while leveraging existing systems. Steady State 2 (Phase 2C) completes the target model, adding technology resilience, cybersecurity segregation, and operational flexibility while minimizing risk.

What it delivers: p. p. 192
What it delivers: - Establishes the independent IESO-NS control centre (ADC) - Begins BA/TOP operations using existing NSP systems - Creates secure physical/cyber boundaries - Builds operator capability and early credibility

AI summary The text outlines the functional objectives and deliverables of a new initiative, which includes establishing an independent IESO-NS control centre (ADC). Key milestones include commencing BA/TOP operations utilizing existing Nova Scotia Power (NSP) systems, creating secure physical and cyber boundaries, and developing operator capability to build early credibility in the system's management.

Why it matters: p. p. 192
Why it matters: - Fastest, lowest-risk path to operational independence - Delivers early value and meets legislative expectations - Provides the operational footing needed for l;itcr phases

AI summary The text highlights the strategic importance of achieving operational independence, characterizing it as the fastest and lowest-risk pathway for the utility. It emphasizes that this transition delivers early value, fulfills legislative expectations, and establishes the necessary operational foundation required for subsequent project phases.

What it delivers: p. p. 192
What it delivers: - Adds province wide settlement capabilities - Enhances forecasting, outage coordination, and analytics - Strengthens governance, transparency, and participant trust

AI summary The text outlines the core benefits and deliverables of a system upgrade or technological implementation. Key improvements include the addition of province-wide settlement capabilities, enhanced capabilities for forecasting, outage coordination, and data analytics, as well as the strengthening of governance, transparency, and trust among participants.

Why it matters: p. p. 192
Why it matters: - Needed to support independent model - Decouples stakeholder commercial discussions from operational cll!- over, removing a high-risk dependency - Builds maturity and technical readiness, while reducing initial 2A scope -...

AI summary The text outlines the strategic rationale for a phased approach to developing an independent model. Key benefits include decoupling commercial stakeholder discussions from operational complexities to reduce risk, building technical maturity, and narrowing the initial scope of the 2A phase. The initiative aims to improve decision-making, confidentiality, and transparency while ensuring the system can adapt to evolving market and regulatory settlement needs.

7.1. Phase 2A p. pp. 192-193
7.1. Phase 2A Phase 2A is the first phase within Steady State 1, and is the recommended first implementation milestone and a credible initial operating step for IESO-NS. Steady State 1 is intended to establish operational independence whil...

AI summary Phase 2A is the initial implementation milestone of Steady State 1, designed to establish operational independence for the IESO-NS. The phase aims to enable safe and compliant BA and TOP operations by utilizing an independent IESO-NS control room while leveraging specific NSP-hosted systems to avoid infrastructure duplication. Key objectives include establishing clear decision-making authority, ensuring regulatory compliance with the More Access to Energy Act, and delivering early operational benefits to Nova Scotians.

7.1.1. Rationale for Shared, Transferred and Newly Built Components p. pp. 193-194
7.1.1. Rationale for Shared, Transferred and Newly Built Components The Steady State 1 operating model was intentionally designed to balance operational independence, reliability, cost, and implementation risk. As a result, not all capabil...

AI summary The document explains the rationale behind the Steady State 1 operating model, which categorizes system components as shared, transferred, or newly built. This classification is based on asset ownership, operational requirements, implementation complexity, and cost-effectiveness. The primary objective of this design is to balance operational independence and reliability while ensuring practical compliance with the legislative goals of the More Access to Energy Act.

7.1.1.1. Shared Components p. p. 194
7.1.1.1. Shared Components Shared components are capabilities where NSP continues to provide infrastructure, technical support, or hosting services during the transition period. These arrangements reduce implementation cost and schedule ri...

AI summary The text discusses the use of 'shared components' during the transition of operational authority to IESO-NS. Nova Scotia Power (NSP) will continue to provide infrastructure, technical support, and hosting services for certain capabilities, such as SCADA systems, which NSP owns and operates. This collaborative approach is intended to reduce implementation costs and schedule risks by avoiding the duplication of assets while ensuring continued operational effectiveness and reliability during the transition.

7.1.1.2. Transferred Components p. p. 194
7.1.1.2. Transferred Components Transferred components represent capabilities currently operated by NSP that are required for IESO-NS to exercise independent operational responsibility. These capabilities are transferred where direct opera...

AI summary The text defines transferred components as existing capabilities operated by Nova Scotia Power (NSP) that must be transitioned to the IESO-NS to enable independent operational responsibility. These transfers occur when direct operational control is essential for supporting BA and TOP functions, or when transferring existing ownership is deemed more effective than developing new systems.

7.1.1.3. Newly Built Components p. p. 194
7.1.1.3. Newly Built Components Newly built components are new capabilities established directly within IESO-NS to support operational decision-making, governance, compliance, and control room operations. These capabilities form the founda...

AI summary The text describes the newly built components within the IESO-NS, which are essential capabilities established to support governance, compliance, operational decision-making, and control room operations. These components serve as the fundamental infrastructure for the IESO-NS' independent operating model.

Fig 8 below illustrates the technology operating model for Steady State 1, with most of the OT components either shared with NSP or transferred from NSP. p. p. 194
Fig 8 below illustrates the technology operating model for Steady State 1, with most of the OT components either shared with NSP or transferred from NSP. Base capablUtles Option selected for this capability Component I SCADA & Monitoring S...

AI summary The text describes the technology operating model for 'Steady State 1,' outlining how various Operational Technology (OT) components will be managed between Nova Scotia Power (NSP) and IESO-NS. Key capabilities such as SCADA & Monitoring, Energy Management Systems (EMS), and Training Systems will be shared or transferred. Specific tools for ECC Optimization, Operational Forecasting, Intertie Management, and Settlement are identified for transfer to IESO-NS, while new reporting capabilities will be built from the ground up.

7.2. Phase 2B p. pp. 194-195
7.2. Phase 2B Phase 2B remains within Steady State 1. It introduces additional independence and transparency enhancements without changing the core operating model. Phase 2B addresses the establishment of commercial arrangements under IESO...

AI summary Phase 2B of the project aims to establish the business and commercial capabilities required for IESO-NS to independently administer Nova Scotia's electricity system. While Phase 2A focuses on safe system operation and dispatch, Phase 2B focuses on participant workflows, settlement capabilities, reporting processes, and information exchange. These enhancements are designed to increase transparency and accountability by allowing stakeholders to interact directly with IESO-NS. The project has an estimated capital cost of $8 million and is subject to a formal decision gate review following Phase 2A.

7.3. Phase 2C p. pp. 195-196
7.3. Phase 2C Phase 2C corresponds to Steady State 2, which represents the completion of the long-term Scenario 4 target model. Steady State 2 builds on the independent operating model already delivered in Steady State 1, extending it with...

AI summary The text describes Phase 2C of the project, which corresponds to Steady State 2 of the long-term Scenario 4 target model. While Steady State 1 (Phases 2A and 2B) establishes the core operational and commercial capabilities for IESO-NS to assume BA, TOP, and market administration responsibilities, Steady State 2 builds upon this foundation. Phase 2C introduces enhanced technology resilience, cybersecurity segregation, independent EMS capabilities, and reduced dependency on NSP-hosted infrastructure to support Nova Scotia's long-term energy transition and future grid complexity.

Strategic Scenario #4 Option selected for this capability Component I p. p. 196
Strategic Scenario #4 Option selected for this capability Component I Base capablUtles SCADA & Monitoring Same as Steady State 1 Same as in Scenario #3. The system is built around a core SCADA platform for real-time monitoring, control, an...

AI summary The document outlines Strategic Scenario #4 for system capabilities, focusing on the transition to a new operational framework. Key components include the transfer of an Energy Management System (EMS) from Nova Scotia Power to IESO-NS, featuring tools for automatic generation control and power system analysis. It also details plans for enhanced ECC Optimization Tools, improved market management, operational forecasting for wind and load, and the procurement of a new settlement system to align with market rules.

7.4. Why the Phased Pathway is Preferred p. pp. 196-197
7.4. Why the Phased Pathway is Preferred The phased pathway is recommended because it supports prudency in three ways: - 1. It enables IESO-NS to establish an initial credible operating capability before full build-out; - 2. It allows earl...

AI summary The document argues that a phased pathway for the IESO-NS is preferred because it supports prudency by establishing initial operating capabilities before full build-out, enabling early value realization after Phase 2A, and creating natural decision gates for reassessing risk and performance. This approach allows for a lower-risk transition to statutory responsibilities, ensuring system reliability and cost management while preserving the flexibility to develop a future-ready system operator model based on evolving economic and system needs.

8.1. Timing of Delivery and the Value of Early Wins p. pp. 198-199
8.1. Timing of Delivery and the Value of Early Wins The current plan targets March 2028 for implementation of Phase 2A. This timing matters because Phase 2A is the first credible operational milestone and the point at which benefits are ex...

AI summary The document emphasizes the importance of the March 2028 implementation deadline for Phase 2A, identifying it as the first credible milestone for realizing operational and economic benefits. It projects approximately $10 million in benefits for 2028/29, increasing to $21 million annually from 2029/30. The text argues that delays to Phase 2A would postpone these benefits and potentially incur additional costs from extended transition arrangements. The phased approach is presented as a balance between timely delivery and prudency.

The estimated program costs are summarized in Fig 11 below, illustrating both the total investment and the allocation across each implementation phase. p. p. 199
The estimated program costs are summarized in Fig 11 below, illustrating both the total investment and the allocation across each implementation phase. (All costs in $M) Total IT Costs $ 20.7 Program Integration $ 11.3 Control Center Build...

AI summary The document provides a detailed financial breakdown of estimated program costs for Phase 2 implementation, categorized into capital expenditures (Capex) and operating expenses (Opex). It outlines specific costs for IT, program integration, control center construction, NERC compliance, and cybersecurity. The summary includes a 'Mid Case' total Capex of $75.4M, with low and high case variations, and allocates these costs across three distinct implementation phases (Phase 2A, 2B, and 2C).

1. IT Costs: p. p. 199
1. IT Costs: - Description: Assumes the configuration of shared platforms (EMS, etc.), transferred platforms, communications, interfaces, and other IT tools. This includes shared or partitioned EMS and SCADA environments, telemetry, and hi...

AI summary The document outlines the basis for estimating Information Technology (IT) costs associated with the IESO-NS project. It covers the configuration of shared and exclusive platforms, including EMS, SCADA environments, telemetry, and historian systems. The text emphasizes that shared systems with Nova Scotia Power (NSP) are preferred for ratepayer benefit. Cost estimates are derived from a combination of vendor quotes, NSP internal estimates, industry benchmarks, and historical project data.

2. Program Integration: p. p. 199
2. Program Integration: - Description: Includes program management, design authority, process, change and quality assurance, and program administration. This covers the resources and activities required to coordinate design, delivery, and...

AI summary This section describes the 'Program Integration' component of the project, which encompasses program management, design authority, process oversight, quality assurance, and administration. It covers the resources and activities necessary to coordinate the design, delivery, and quality assurance across all Phase 2 workstreams, including the oversight of vendors and system integrators. The cost estimate for these activities was developed using a bottom-up approach based on detailed work packages, professional judgment, internal planning, and past project experience.

3. Control Center Build: p. p. 199
3. Control Center Build: - Description: Covers the design, construction, fit-out, physical security systems, and commissioning of the IESO-NS control center. This includes the dedicated primary control centre facility and operating workfor...

AI summary The text describes the scope and basis for the IESO-NS control center build. This project encompasses the design, construction, fit-out, physical security, and commissioning of a dedicated facility. The primary objective is to provide the IESO-NS with an environment and workforce capable of conducting real-time operational control independently of Nova Scotia Power (NSP). The cost estimates for this project are derived from professional judgment and benchmarks from analogous control center projects and historical data.

4. NERC Compliance (process & documentation): p. p. 199
4. NERC Compliance (process & documentation): - Description: Includes compliance program and procedures development, audit readiness, and certification activities. This includes the work required for IESO-NS to be certified by NERC/NPCC to...

AI summary The text outlines the scope and basis for NERC compliance activities, focusing on the development of compliance programs, procedures, audit readiness, and certification. Specifically, it covers the work required for IESO-NS to obtain NERC/NPCC certification to perform Balancing Authority (BA) and Transmission Operator (TOP) functions. This involves aligning documentation with NERC CIP and reliability standards, with estimates derived from professional judgment, industry benchmarks, and historical project data.

5. Cyber Security: p. p. 199
5. Cyber Security: - Description: Covers security architecture, network controls, monitoring, identity management, and required cyber controls. This includes the cybersecurity architecture and controls needed to support IESO-NS's independe...

AI summary The document outlines the requirements and scope for cybersecurity in the context of the IESO-NS independent operating environment. It specifies that the security architecture must include network controls, monitoring, identity management, and necessary cyber controls to meet NERC CIP requirements for BA/TOP certification. The cost estimates for these measures are based on a combination of vendor quotes, industry benchmarks, and professional judgment from past project experiences.

6. NSP Support Costs: p. p. 199
6. NSP Support Costs: - Description: Includes internal Nova Scotia Power effort supporting transition, handover, and system readiness. This reflects the effort required from Nova Scotia Power to support the transfer or shared operation of...

AI summary Nova Scotia Power (NSP) identifies 'NSP Support Costs' as a category covering the internal efforts required to facilitate the transition, handover, and system readiness for shared operations with IESO-NS. These costs specifically account for the transfer of systems and knowledge during implementation. The estimates for these costs are provided directly by Nova Scotia Power.

11. Opex Items: p. p. 199
11. Opex Items: - Description: Includes incremental annual operating costs such as staffing, system operating costs, NERC compliance, training, and telecommunications. This reflects the ongoing annual operating costs required to sustain IE...

AI summary The document outlines the estimated annual operating expenses (OPEX) for IESO-NS's independent operations, totaling approximately $75 million. These costs cover staffing, system operations, NERC compliance, training, and telecommunications. The estimates are based on professional judgment and industry benchmarks, categorized as Class 3 accuracy (-15% to +20%). The text justifies the $64 million to $90 million range as reasonable for a large-scale operational transformation involving complex systems and governance development.

9.1. Cost Estimation Method and Assumptions p. p. 199
9.1. Cost Estimation Method and Assumptions The cost estimates for the Phase 2 program have been developed as a Class 3 Budgetary Estimate as defined by AACE standards. This indicates an estimate developed at a level appropriate for strate...

AI summary The document outlines the methodology and assumptions for the Phase 2 program's cost estimates, which are classified as Class 3 Budgetary Estimates according to AACE standards. These estimates are intended for strategic decision-making and program approval rather than final execution, with an expected accuracy range of -15% to +20%. Key assumptions include a 2026 commencement date, a 15% capital contingency, approximately $6.3 million in annual operating costs, and a phased benefit realization schedule validated against benchmarks like the Ontario IESO model.

9.2. Incremental Costs and Transfers from NSP p. p. 199
9.2. Incremental Costs and Transfers from NSP A clear distinction should be drawn between costs that are incremental — representing new investment required to establish independent operational capability — and costs that represent the tran...

AI summary The text distinguishes between two types of costs associated with the Phase 2 program regarding the transition of responsibilities from Nova Scotia Power (NSP) to the IESO-NS. Incremental costs refer to new investments required to build independent operational capabilities, such as a control centre, operational technology, staffing, and governance. In contrast, transferred costs involve existing functions and cost structures currently funded by NSP that will be moved to IESO-NS as part of the legislatively mandated transition.

10. Net Present Value Analysis and Stress Testing p. p. 199
10. Net Present Value Analysis and Stress Testing A comprehensive NPV analysis was prepared to assess the economic merit of the Phase 2 program across a range of cost and benefit scenarios. The key findings are: - Phase 2 has a positive bu...

AI summary The document presents a Net Present Value (NPV) analysis for the Phase 2 program to evaluate its economic viability. The analysis concludes that the program has a positive business case, with expected benefits significantly outweighing incremental costs. The estimated NPV is $219 million over a 17-year period. Furthermore, the cost estimates were subjected to stress testing within a Class 3 estimate range of -15% to +20% to ensure robustness.

10.2. Potential Cost Risk Areas p. p. 199
10.2. Potential Cost Risk Areas The Phase 2 program was designed to optimize cost and implementation risk while protecting reliability. Notwithstanding the positive overall case, the following cost risk areas are identified as warranting p...

AI summary The document introduces a section identifying potential cost risk areas associated with the Phase 2 program. It notes that while the program's overall case is positive, specific risks regarding cost and implementation must be monitored to ensure project reliability and fiscal responsibility during the execution phase.

Implementation Timing Risk p. p. 199
Implementation Timing Risk Delays to Phase 2A would postpone realization of the anticipated benefits and could require adjustments to program schedules, procurement activities, and implementation plans. Any associated cost implications wou...

AI summary The document addresses the risks associated with potential delays in the implementation of Phase 2A. It notes that any postponement would delay the realization of anticipated benefits and necessitate adjustments to program schedules, procurement activities, and overall implementation plans. Furthermore, the text indicates that the specific financial consequences of such delays would be contingent upon both the duration and the specific nature of the delay.

Program Integration Risk p. p. 199
Program Integration Risk The transition of core operational functions involves complex integration between IESO-NS systems, NSP legacy infrastructure, and third-party vendors. The full extent of integration complexity may not be fully know...

AI summary The text addresses the risks associated with integrating core operational functions during the transition between IESO-NS systems and legacy Nova Scotia Power infrastructure. It highlights that the complexity of integrating these systems with third-party vendors may not be fully quantifiable until the detailed design phase of the project commences.

Planning Estimate Uncertainty p. p. 199
Planning Estimate Uncertainty As a Class 3 estimate, the program cost appropriately carries a -15% to +20% range. This uncertainty is typical of planning-level estimates and should be considered when evaluating the projected program costs...

AI summary The document addresses the inherent uncertainty in planning-level cost estimates, specifically identifying the current program cost as a Class 3 estimate. It notes that the cost range carries a -15% to +20% variance. The text advises that this level of uncertainty is standard for planning-level projections and must be accounted for when evaluating the economic outcomes and projected costs presented in the report.

Technology Procurement Risk p. p. 199
Technology Procurement Risk Vendor pricing and availability for operational technology systems, including EMS components, may vary from planning estimates once competitive procurement is underway. The key point is that the recommended phas...

AI summary The text discusses the risks associated with technology procurement for operational technology systems, specifically noting that vendor pricing and availability for EMS components may fluctuate during competitive procurement. To mitigate these risks, a phased implementation pathway with defined decision gates is recommended. IBM supports this approach, asserting that the staged strategy effectively manages procurement uncertainties while maintaining the program's overall benefits.

11. Managing Risks, Costs, and Reliability Through the 2A / 2B / 2C Approach p. p. 199
11. Managing Risks, Costs, and Reliability Through the 2A / 2B / 2C Approach A central strength of IBM's recommendation is that it does not propose a single-step transition. Instead, it recommends a phased pathway that manages risk, reliab...

AI summary The text highlights the strategic advantages of IBM's recommendation to adopt a phased approach (2A / 2B / 2C) for infrastructure or system transitions. Rather than proposing a single-step change, this methodology is designed to mitigate risks, maintain system reliability, and manage costs progressively over time.

Reliability Management p. p. 199
Reliability Management Phase 2 affects core operating responsibilities for the Nova Scotia electricity system. Accordingly, the recommendation emphasizes Phase 2A as a credible first milestone that allows IESO-NS to establish an initial op...

AI summary The document outlines reliability management strategies for Phase 2 of the electricity system's core operating transition. It recommends Phase 2A as a credible first milestone, allowing IESO-NS to establish initial operating capabilities. Key safeguards for the transition include a Spring 2028 cutover window to avoid extreme weather, parallel operations to validate systems in real-time, mandatory NERC compliance readiness, and the completion of operator training and certification before IESO-NS assumes live operational responsibilities from Nova Scotia Power.

Cost Management p. p. 199
Cost Management A phased pathway allows capital commitments to be sequenced and enables updated information from earlier phases to inform later decisions. This is especially valuable where costs are planning-level and subject to the normal...

AI summary The document outlines a phased approach to capital commitment management, allowing for sequenced investment and the integration of updated information from early project phases into later decisions. This strategy is particularly useful for planning-level costs within the Class 3 estimate range. Key cost management mechanisms identified include a 15% contingency on direct capital to address estimate variations, decision gate reviews to compare actual costs against estimates before authorizing further spending, and annual reporting of actual versus forecast expenditures to ensure ongoing governance.

Early Value with Controlled Progression p. p. 199
Early Value with Controlled Progression Phase 2A allows IESO-NS to begin realizing a portion of the anticipated benefits earlier by establishing independent operational control, decision-making authority and the initial operational capabil...

AI summary The text discusses Phase 2A of a project, which enables IESO-NS to begin realizing benefits early by establishing independent operational control and decision-making authority for BA/TOP responsibilities. It notes that benefit realization increases as subsequent phases are completed. Furthermore, it asserts that the initiative remains economically viable with a positive business case even if implementation were to be paused after Phase 2A or 2B, a claim supported by NPV and sensitivity analyses.

Net Present Value (NPV) Scenarios – Phases p. p. 199
Net Present Value (NPV) Scenarios – Phases 2A and 2B NPV IRR Base Case Scenario +$110M 30% High Case (-15% Capex, +30% benefits) +$173M 46% Low Case (+20% Capex, -40% benefits) +$26M 11% Capex +50% +$88 20% Benefits -50% +$16M 10% Capital...

AI summary The document presents a sensitivity analysis of Net Present Value (NPV) and Internal Rate of Return (IRR) for various project phases (2A and 2B). It evaluates the financial viability of the project under multiple scenarios, including a Base Case, High Case (reduced Capex, increased benefits), Low Case (increased Capex, reduced benefits), and scenarios involving delayed benefits, carbon removal, and significant fluctuations in capital costs and benefits. The findings indicate that the project's profitability is highly sensitive to capital expenditure and benefit realization rates.

12. Conclusion and IBM Recommendation p. p. 199
12. Conclusion and IBM Recommendation IBM recommends that IESO-NS proceed with Scenario 4 – Enhanced Independence as the preferred long-term operating model for Phase 2, implemented through a phased 2A / 2B / 2C pathway. This recommendatio...

AI summary IBM recommends that IESO-NS adopt 'Scenario 4 – Enhanced Independence' as the preferred long-term operating model for Phase 2, following a phased implementation pathway (2A, 2B, and 2C). This recommendation is based on cost-benefit analyses and legislative alignment with the More Access to Energy Act. Key benefits include achieving independent operational control, protecting system reliability, and delivering an estimated $219 million NPV with annual benefits of $21 million starting in 2029/30.

Appendix 7 – FTI Value Case Report p. p. 199
Appendix 7 – FTI Value Case Report NON-CONFIDENTIAL The Independent Energy System Operator of Nova Scotia: Value Framework and Business Case A report from FTI Consulting for IESO Nova Scotia May 29, 2026 I

AI summary The document serves as the cover page for Appendix 7 of a regulatory proceeding, titled 'FTI Value Case Report'. It introduces a report prepared by FTI Consulting for the Independent Energy System Operator of Nova Scotia (IESO-NS). The report focuses on the 'Value Framework and Business Case' for IESO-NS and is dated May 29, 2026.

Executive summary p. pp. 199-18
Executive summary - ES.1 FTI Consulting ("FTI" or we) has been retained by the Nova Scotia Independent Energy System Operator ("IESO-NS" or the "IESO") to examine the Business Case and Value Framework of transitioning from an investor-owne...

AI summary FTI Consulting was retained by the Nova Scotia Independent Energy System Operator (IESO-NS) to evaluate the business case and value framework of transitioning from a vertically integrated utility (VIU) model to an independent system operator (ISO) model. The transition aims to enhance transparency and investment opportunities amidst Nova Scotia's electricity sector transformation. The report estimates that the transition will deliver strategic benefits—impacting cost, reliability, and environmental performance—quantified at approximately $500 million to $2.4 billion over the 2026-2050 period.

The transition from the VIU model to IESO-NS p. p. 18
The transition from the VIU model to IESO-NS - ES.6 The newly created IESO-NS is an independent, non-profit organization currently entrusted with responsibility for planning and procurement and eventually reliably operating the province's...

AI summary The document outlines the transition of Nova Scotia's bulk electricity system from a Vertically Integrated Utility (VIU) model to the IESO-NS model. IESO-NS is an independent, non-profit organization tasked with planning, procurement, and eventual operation of the province's bulk electricity system. The transition is structured in two phases: Phase 1, currently established, covers planning, IRP processes, and procurement; Phase 2, planned for 2027/28, will involve day-to-day operational roles and transmission grid operation.

Anticipated benefits of an ISO p. pp. 20-21
Anticipated benefits of an ISO - ES.10 In Chapter 3, we describe the anticipated benefits and costs of an ISO in Nova Scotia, in contrast to a VIU model. An investor-owned VIU model, even with regulatory guardrails, inherently creates the...

AI summary The text outlines the anticipated benefits of establishing an Independent System Operator (ISO) in Nova Scotia compared to a Vertically Integrated Utility (VIU) model. It argues that an ISO reduces potential conflicts of interest by providing independent, not-for-profit oversight of system planning and operation. Furthermore, the ISO structure is presented as a supportive framework for the competitive procurement of new energy resources introduced by Nova Scotia's Energy Reform (2024) Act.

Quantification of benefits of Phases 1 and 2 of the IESO p. pp. 21-24
Quantification of benefits of Phases 1 and 2 of the IESO - ES.15 In Chapter 4 we quantify a subset of benefits identified in Chapter 3 that can be organized in four groups leading to 12 benefit (and disbenefit) categories shown in Figure E...

AI summary FTI Consulting provides a quantification of the benefits and disbenefits associated with Phases 1 and 2 of the Independent System Operator (IESO) transition for Nova Scotia. Total benefits are estimated between $500 million and $2.4 billion (Present Value) relative to a baseline without the IESO. Key benefits include increased competition in resource procurement, improved timeliness of deployment for new generation and transmission, and operational efficiencies. The analysis also accounts for disbenefits related to lost synergies between planning, operation, and asset ownership. Benefits are measured against primary cost categories such as capital expenditure, energy production costs, and carbon emissions.

Table ES-1: Equivalent annual benefit, $m 2025 [8](#page-25-0) p. p. 24
Table ES-1: Equivalent annual benefit, $m 2025 [8](#page-25-0) Equivalent annual benefit, annuity corresponding to PV of benefits Low Mid. High Phase 1 15 29 43 Phase 2 20 71 122 Total $35 $100 $165 - ES.22 This analysis demonstrates that...

AI summary The text presents an analysis of the Equivalent Annual Benefit (EAB) for the transition to IESO-NS, categorized into low, mid, and high benefit scenarios. It highlights that in a low-benefit case, the annual incremental costs could be approximately $14 million, resulting in a net annual benefit of $16 million and a benefit-to-cost ratio of 1.8. In mid and high benefit scenarios, using the same illustrative costs, the net annual benefits would increase significantly to $81 million (ratio of 5.3) and $146 million (ratio of 8.7) respectively.

Table [E](#page-25-1) S-2: Equivalent annual benefit excluding avoided emissions-related benefits, $m 20258 p. pp. 24-25
Table [E](#page-25-1) S-2: Equivalent annual benefit excluding avoided emissions-related benefits, $m 20258 Equivalent annual benefit, annuity corresponding to PV of benefits Low Mid. High Phase 1 9 18 27 Phase 2 15 61 106 Total $24 $78 $1...

AI summary The document presents Table S-2, which outlines the Equivalent Annual Benefit (EAB) for Phase 1 and Phase 2 of a project, excluding avoided emissions-related benefits. The benefits are categorized into Low, Mid, and High scenarios. The total EAB ranges from $24 million in the Low scenario to $133 million in the High scenario. A specific calculation is also provided, noting a value of $14 million derived from 20% of $70 million.

1. The transition from the vertically integrated utility model to IESO-NS p. pp. 25-28
1. The transition from the vertically integrated utility model to IESO-NS - 1.1 IESO-NS is the most recently founded ISO[10](#page-27-0) in North America, having been directed by the Provincial Government in 2024. IESO-NS was formed follow...

AI summary The text describes the establishment of IESO-NS, an independent, non-profit Independent System Operator (ISO) in Nova Scotia, directed by the provincial government in 2024 following a Clean Electricity Solutions Task Force report. IESO-NS is tasked with planning, procurement, and eventually operating the province's bulk electricity system. The transition from Nova Scotia Power (NSP) occurs in two phases: Phase 1 involves planning, transmission planning, interconnection, and resource procurement; Phase 2, planned for 2027-2028, focuses on operational planning and system balancing.

2. Benchmarking the roles, responsibilities and operating costs of an ISO p. p. 28
2. Benchmarking the roles, responsibilities and operating costs of an ISO - 2.1 The objective of this chapter is three-fold: (1) benchmarking IESO-NS among its peers globally; (2) understanding from that benchmark what the typical roles an...

AI summary This chapter outlines the methodology for benchmarking the IESO-NS against global peers to determine typical Independent System Operator (ISO) roles, responsibilities, and operating costs. It acknowledges that while no direct comparable benchmark exists for IESO-NS, a range of international ISOs with shared characteristics will be analyzed. The study aims to identify key cost drivers and map operating costs against metrics like population served and installed capacity, noting that findings are illustrative due to diverse global differences.

Identification of the ISOs for benchmarking purposes p. pp. 28-33
Identification of the ISOs for benchmarking purposes 2.3 IESO-NS has several defining characteristics that influence our benchmarking group selection. We summarise those characteristics and the relevant ISOs in Figure 2-1 below. Source: FT...

AI summary The document outlines the methodology for identifying comparable Independent System Operators (ISOs) for benchmarking the IESO-NS. It identifies two key characteristics for selection: peak load and utility structure. IESO-NS is characterized by a relatively small peak load (approx. 2.5 GW) and a system primarily composed of a former vertically integrated utility (VIU). Comparable entities identified include EirGrid, Transpower, EMA (Singapore), CAISO, ISO-NE, MISO, and IESO Ontario.

Roles and responsibilities of the benchmarked ISOs p. pp. 34-35
nchmarking group and IESO-NS in [Table 2-2.](#page-37-0) In what follows, we first provide initial takeaways. After, we briefly introduce and discuss the different roles and responsibilities outlined.

AI summary The document introduces a benchmarking analysis of Independent System Operators (ISOs), specifically focusing on the roles and responsibilities of the IESO-NS. The text indicates that the following sections will provide initial takeaways and a detailed discussion of the specific duties and responsibilities outlined for these entities.

Table 2-2: Electricity sector role benchmarking p. pp. 35-37
Table 2-2: Electricity sector role benchmarking Role Responsibility MISO ISO-NE CAISO AESO IESO Ontario NESO EirGrid AEMO EMA Transpower IESO Nova Scotia Transmission planning \overline{\mathbf{V}} \overline{\mathbf{V}} \overline{\mathbf{V...

AI summary The document presents a benchmarking table comparing the roles and responsibilities of various electricity sector entities across different jurisdictions (e.g., MISO, ISO-NE, CAISO, AESO, IESO Ontario, NESO, EirGrid, AEMO, EMA, Transpower, and IESO Nova Scotia). It evaluates key functions including transmission planning, resource procurement, capacity markets, load forecasting, reliability standards, market design, and market operation. The analysis highlights the specific capabilities and limitations of each operator, particularly regarding market settlement, congestion management, and transmission ownership.

Operating costs p. pp. 42-45
Operating costs - 2.22 In this section, we compare and discuss major operating costs of the benchmarking group. These fall generally into the major categories of salaries and benefits; outside services; facility, equipment, various IT and...

AI summary The text analyzes the operating costs of various Independent System Operators (ISOs) and Transmission System Operators (TSOs) as part of a benchmarking exercise. It identifies key cost drivers including salaries, benefits, outside services, and IT/office expenses. Notably, Transpower's high operating costs are attributed to its dual role as both an ISO and a significant transmission asset owner. The analysis distinguishes between incremental ISO costs, transferred utility costs, and excluded costs such as system service procurement, regulatory fees, and non-recurring transition costs.

3. Anticipated benefits of an ISO p. pp. 47-48
3. Anticipated benefits of an ISO - 3.1 In this chapter, we describe the benefits and costs from the establishment of an ISO. The establishment of an ISO is a step in the liberalisation or restructuring of the electricity sector. - 3.2 Unb...

AI summary The text outlines the anticipated benefits and costs associated with establishing an Independent System Operator (ISO) in Nova Scotia as part of the electricity sector's liberalization. Key benefits include reduced bias, increased competition, innovation, and lower consumer costs through fair grid access and technology diversity. Conversely, the text acknowledges that unbundling a vertically integrated business introduces incremental costs, including staff and equipment expenses, and a potential loss of synergies between roles.

IESO role transition p. pp. 48-49
IESO role transition 3.4 The rationale for establishing the IESO was to create an independent body with enhanced focus on the system's energy requirements.[52](#page-48-1) The IESO transition is planned in two phases (as explained in more...

AI summary The document outlines the planned two-phase transition of roles to the Independent Electricity System Operator Nova Scotia (IESO-NS). Phase 1 focuses on long-term planning and procurement functions, while Phase 2 involves real-time operations. The transition aims to create an independent body to manage system energy requirements, reducing potential bias. While operational roles will transition from Nova Scotia Power (NSP), NSP will retain ownership of the transmission system. The report intends to evaluate the benefits and cost implications of these role transfers.

Benefits overview p. p. 49
Benefits overview - 3.7 In its two phases, the different roles transitioned from NSP to IESO-NS are expected to lead to benefits in terms of cost reductions, environmental improvements, and enhanced reliability, but setting up a new entity...

AI summary The text outlines the expected benefits of transitioning roles from Nova Scotia Power (NSP) to the Independent Electricity System Operator Nova Scotia (IESO-NS). These benefits, categorized into cost reductions, environmental improvements, and enhanced reliability, are driven by five key levers: removing perceived bias, increasing competition through auctions, improving regulatory timeliness, fostering technological innovation, and enhancing operational efficiency. While the transition involves incremental setup costs, it aims to create a more competitive and efficient energy market.

Phase 1: Independent planning and competitive resource procurement p. pp. 49-52
Phase 1: Independent planning and competitive resource procurement - 3.11 For the purposes of this section, we divide Phase 1 roles transferred to IESO-NS into core roles and supporting roles. We separately categorise more discrete, indivi...

AI summary The document outlines Phase 1 of a transition involving the transfer of roles to the Independent Electricity System Operator Nova Scotia (IESO-NS). It distinguishes between 'core roles' and 'supporting roles,' focusing on the benefits of independent planning and competitive resource procurement. Key benefits identified include long-term security of supply through cost discipline in competitive procurements and the facilitation of more efficient transmission investment decisions and non-wires alternatives due to reduced perceived bias and increased trust in the planning entity.

Table 3-1: Phase 1 benefits and underlying levers p. p. 52
Table 3-1: Phase 1 benefits and underlying levers Long-term security of supply Transmission planner (1) Shifting cost overruns risk ❷ Increased competition (2) Reduced resource investment cost from competitive resource procurement (3A) Red...

AI summary The document outlines the benefits and underlying levers associated with Phase 1 of a transmission planning initiative. Key benefits include long-term security of supply, increased competition, and improved timeliness. Specific levers identified include shifting cost overrun risks, reducing resource investment costs through competitive procurement, and accelerating capital expenditure deployment for both resources and transmission. It also highlights the avoidance of carbon costs through accelerated deployment and notes that the IESO-NS's independence supports its role in these initiatives.

Phase 2 : More efficient operations and further unlocking benefits from independent planning and resource procurement p. pp. 52-54
Phase 2 : More efficient operations and further unlocking benefits from independent planning and resource procurement - 3.17 The core roles transferred to IESO-NS under Phase 2 are Scheduler, Residual Energy System Balancer and Settlement...

AI summary The text describes Phase 2 of a regulatory transition involving the transfer of Scheduler, Residual Energy System Balancer, and Settlement roles to IESO-NS. This shift aims to improve operational efficiency, innovation, and reliability by providing a clearer mission and reducing information asymmetry in settlements. Furthermore, it highlights how operational improvements can unlock long-term benefits in planning pathways and increase developer participation in competitive auctions by removing the perceived information advantage of the Variable Independent Utility (VIU).

Table 3-2: Phase 2 benefits and underlying levers p. p. 54
Table 3-2: Phase 2 benefits and underlying levers Direct benefits from Phase 2 Scheduler, residual energy system balancer and settlement Indirect benefits on Phase 1 roles from Phase 2 Long-term security of supply Transmission planner Scal...

AI summary Table 3-2 outlines the benefits and levers associated with 'Phase 2' of a project, categorized into direct benefits, indirect benefits on Phase 1 roles, and the scaling of Phase 1 benefits. Key benefits include improved operational efficiency leading to decreased production and avoided carbon costs, as well as increased innovation and diversity through reduced capital expenditures (CapEx). Additionally, the phase is expected to foster increased competition by facilitating greater entry into competitive procurement processes.

Phase 1 incremental costs p. pp. 54-56
Phase 1 incremental costs - 3.21 It must be acknowledged that certain costs are inherent to a transition of certain tasks from a VIU to an ISO. While many costs are likely to be comparable, e.g., many computing and software costs, some are...

AI summary The text discusses the incremental costs and potential disbenefits associated with transitioning certain tasks from a Variable Independent Utility (VIU) to an Independent System Operator (ISO) in Nova Scotia. Key issues include one-off upfront costs like real estate, duplicate software licenses, and redundant corporate functions. Furthermore, the analysis highlights a potential loss of synergies if Phase 1 is implemented without Phase 2, as separating the planner and operator roles may hinder efficient investment decisions and increase transaction costs due to reduced operational expertise in planning.

Phase 2 incremental costs p. pp. 56-58
Phase 2 incremental costs - 3.25 Much of the cost for Phase 2 falls into the same broad categories as Phase 1, but to a larger magnitude for one-off costs associated with the control room and other capital-intensive activities. The impleme...

AI summary The text analyzes the incremental costs associated with Phase 2 of a system operator transition, noting that costs are largely similar to Phase 1 but higher due to one-off capital-intensive activities like control room modernization. It highlights a tension between restored planning and operator synergies and the potential loss of operational synergies caused by unbundling asset ownership from operation. Specifically, unbundling may lead to increased transaction costs for activities like temporary line overloading due to information gaps and negotiation requirements.

Introduction p. pp. 58-61
Introduction - 4.1 This chapter focuses on a subset of direct, quantifiable benefits of both Phases 1 and 2 of the IESO transition, while the full range of benefits and underlying rationale of the IESO transition are described in Chapter 3...

AI summary This section introduces the framework for analyzing the quantifiable benefits and disbenefits associated with the transition to the Independent Electricity System Operator (IESO) in Nova Scotia. The benefits are categorized into four areas: Phase 1 unbundling benefits (asset owner and planner separation), Phase 1 accelerated deployment benefits (competitive procurement and independent advisory), Phase 2 core roles benefits (control room functions and regained synergies), and the impact of Phase 2 on Phase 1 roles. The analysis acknowledges potential disbenefits, such as lost synergies from unbundling.

Benefit (CADm) Low Mid. High p. p. 61
Benefit (CADm) Low Mid. High (1) Shifting cost overrun risk 47 67 87 (2) Reduced resource cost from competitive procurement - 67 135 (3A) Reduced production costs from accelerated deployment 186 274 363 (3B) Accelerated CapEx deployment (f...

AI summary The document presents a quantitative benefit-cost analysis of Nova Scotia Power's 2025 Annual Capital Expenditure Plan, categorized into Low, Mid, and High scenarios. It evaluates various factors including cost overrun risk mitigation, competitive procurement savings, accelerated deployment benefits, and avoided carbon costs. The analysis also accounts for financial disbenefits such as lost synergies from planner-operator separation and accelerated CapEx deployment. Total estimated benefits range from $500 million in the Low scenario to $2,361 million in the High scenario.

Category Cost Category p. pp. 63-65
d a low case for each impact, creating a reasonable range for each benefit. For simplicity, in the results section we focus mostly on the midpoint case, which is the average of the high and low cases. - 4.11 All benefits quantified are pre...

AI summary The text describes the methodology used to quantify the benefits and impacts associated with the IESO transition. It explains that a range (high and low cases) is established for each impact, with the midpoint case used for primary results. All benefits are calculated on a Real Present Value (RPV) basis to account for the time value of money, aligning with Nova Scotia Power's (NSP) Integrated Resource Plan (IRP) methodology. Key cost categories impacted include generation and transmission capital expenditures, production costs, and carbon emissions.

(1) Shifting cost overrun risk p. pp. 65-107
(1) Shifting cost overrun risk - 4.18 Cost overruns are common in large capital projects, and when bor[n](#page-65-1)e by a utility with cost-based rates, these are typically passed on to ratepayers. Merchant facilities, however, are more...

AI summary The text discusses the potential for shifting cost overrun risks from ratepayers to merchant facilities through the IESO transition. Unlike cost-based utilities that typically pass overruns to customers, merchant facilities bear these risks due to pre-construction contract negotiations. The analysis estimates that the IESO could reduce capital cost overruns by up to 50% and the proportion of overspend passed to customers by up to 80% compared to a Variable Independent Utility (VIU) model. These benefits are expected to begin in 2026.

(3A) Reduced production costs from accelerated deployment p. pp. 67-68
(3A) Reduced production costs from accelerated deployment - 4.27 VIUs can often experience delays in the deployment of both generation and transmission projects. We assume that under the IESO such delays will be reduced. The assumed driver...

AI summary The text analyzes how the transition to an Independent Electricity System Operator (IESO) model can reduce production costs through accelerated deployment of generation and transmission projects. Key drivers include streamlined regulatory approvals by removing the need for NSEB approval on specific expenditures and faster competitive procurement processes. The analysis suggests that production costs will begin to decline materially by 2028, with project advancements ranging from 1-2 years depending on the scenario, primarily driven by the integration of lower variable-cost capacity like wind.

(3B) Accelerated CapEx deployment (financial disbenefit) p. pp. 68-69
(3B) Accelerated CapEx deployment (financial disbenefit) 4.32 As discussed above, for both generation and transmission, we can expect faster construction timelines and a faster reduction of production costs relative to the counterfactual V...

AI summary The text discusses the financial implications of accelerated capital expenditure (CapEx) deployment resulting from the creation of the Independent Electricity System Operator (IESO). While faster construction timelines reduce production costs compared to the counterfactual Variable Independent Utility (VIU) scenario, they create a financial disbenefit due to the time value of money. Because costs are incurred earlier, their discounted present value is higher. This effect is expected to begin in 2026, with the first realized costs occurring in 2028.

(5) Loss of synergies from planner and operator p. pp. 69-107
(5) Loss of synergies from planner and operator 4.36 Prior to the IESO, the planner and operator functions were combined under NSP. Separating these functions – if Phase 1 only was implemented - can conceivably create additional transactio...

AI summary The document discusses the potential negative impacts of separating the planner and operator functions, which were previously combined under Nova Scotia Power (NSP). The separation may create additional transaction costs and obstruct information flows due to the loss of inherent system knowledge. These factors are expected to increase production costs by 1-2% starting in 2029, as real-time operational constraints may no longer align with long-term planning.

Phase 2: Independent system operation p. pp. 69-110
Phase 2: Independent system operation 4.38 This analysis assumes an implementation timeline for the initial stage of Phase 2 in 2027 with substantial control room improvements effective in 2029. Because the timeline of Phase 2 is still und...

AI summary The document outlines the implementation timeline for Phase 2 of independent system operation. It assumes an initial implementation stage in 2027, with significant control room improvements occurring in 2029. Due to the ongoing development of the Phase 2 timeline, a sensitivity analysis is also provided based on a more conservative schedule, projecting the initial stage for 2028 and control room improvements for 2032.

(6) Direct control room improvements p. pp. 69-72
(6) Direct control room improvements - 4.40 The transfer of system operations from NSP to the IESO is expected to coincide with a significant modernization of the current dispatch process. [78](#page-72-1) Updates to operational assets and...

AI summary The text discusses the expected operational improvements resulting from the transfer of system operations from Nova Scotia Power (NSP) to the Independent Electricity System Operator (IESO). It argues that the IESO's core focus on system operation will drive modernization of control room hardware and software, leading to more efficient resource utilization and reduced production costs. These improvements are projected to yield 2-10% in savings starting in 2029, surpassing the expected benefits of current improvements being implemented by NSP.

(7) Scaling effect from independent system operation: increased entry in competitive procurement p. pp. 72-74
(7) Scaling effect from independent system operation: increased entry in competitive procurement - 4.44 In a Phase 1-only IESO, a dispatch run by the incumbent NSP may deter some participation of third-party competitors in IESO-led procure...

AI summary The document discusses the benefits of establishing an independent system operator (IESO) in Nova Scotia. It argues that separating the system operator role from the incumbent utility (NSP) reduces information asymmetries and conflicts of interest, which is expected to increase third-party participation in competitive procurements and lower capital costs for new generation and storage assets starting in 2027. Additionally, it highlights that control room modernization will enable more advanced system planning for transmission and generation by providing more detailed system information.

(12) Loss of synergies between asset owner and operator (disbenefit) p. p. 74
(12) Loss of synergies between asset owner and operator (disbenefit) 4.58 The separation of asset ownership and operation creates some lost synergies, as explained in Chapter 3. This is due to the change to a contractual interface (in whic...

AI summary The document discusses the potential disbenefit of lost synergies resulting from the separation of asset ownership and operation. Transitioning from an operational interface to a contractual one is expected to create friction, leading to increased transaction and information-sharing costs. These factors are projected to cause a slight increase in production costs, estimated between 0.5% and 1%, starting in 2027 when Phase 2 begins.

Results of quantification p. pp. 74-76
Results of quantification 4.60 The results section consists of six parts. First, we introduce the overall results of the quantification of the identified benefits and disbenefits, i.e., the RPV of the IESO transition over the 2026-2050 hor...

AI summary The text outlines the structure of the quantification results for the IESO transition over the 2026-2050 horizon. It details six components of the analysis: the overall Real Present Value (RPV) of benefits and disbenefits, yearly benefit breakdowns, results excluding avoided carbon costs, results including full-priced carbon emissions without policy shields, the annualised costs required for a break-even outcome under various scenarios, and a sensitivity analysis based on specific timelines for Phase 2 and control room improvements.

Core results p. pp. 76-79
Core results - 4.61 The results of the quantification described above sum to over $1.4 billion in the midpoint case, within a range of $500 million to $2.4 billion over the 2026-2050 period. The IESO transition has a diverse set of benefit...

AI summary The text quantifies the economic impacts of the IESO transition, estimating a midpoint benefit of over $1.4 billion between 2026 and 2050. Benefits are driven primarily by reduced capital expenditures and production costs, with Phase 2 accounting for two-thirds of the total. Significant benefits arise from accelerated decarbonization in Phase 1 and control room improvements in Phase 2. The analysis also accounts for specific disbenefits and the cascading positive impacts of improved control room operations on competitive energy procurement.

Benefits by year p. pp. 79-80
Benefits by year - 4.67 The benefits of the IESO transition are frontloaded given (1) the greatest reduction in carbon emissions occurring in the 2027-2030 period, and (2) the steepest decline in production costs occurring in 2027-2032.82...

AI summary The text outlines the projected economic and environmental benefits of transitioning to the IESO model, categorized into two phases. Phase 1 benefits are frontloaded (2027-2032) due to accelerated decarbonization and immediate cost savings. Phase 2 benefits are more enduring and distributed over the long term, with significant growth expected from 2035 onwards. The report highlights that over half of the cumulative Real Present Value (RPV) benefits are realized within the first eight years of the 2026-2050 period, reaching a $1 billion milestone by 2039.

- 4.73 As shown in Table 4-2 below, when excluding this benefit category from the analysis, the cumulative benefits across the 2026-2050 period are $1,119 million in the midpoint case. p. pp. 80-82
- 4.73 As shown in Table 4-2 below, when excluding this benefit category from the analysis, the cumulative benefits across the 2026-2050 period are $1,119 million in the midpoint case. Unlike Figure 4-19 which shows Phases 1 and 2 as stack...

AI summary The document quantifies the transition benefits associated with the IESO (Independent Electricity System Operator) over the 2026-2050 period, excluding avoided emissions-related benefits. The analysis presents low, midpoint, and high cases, identifying key drivers such as reduced resource costs from competitive procurement, accelerated deployment of production assets, and control room improvements. It also accounts for disbenefits, such as lost synergies from planner-operator and owner-operator models, and notes negative impacts from accelerated CapEx deployment.

Table 4-3: Quantification of different methods for IESO transition benefits related to avoided carbon costs, midpoint and range, $m 2025 [88](#page-82-2) p. p. 82
Table 4-3: Quantification of different methods for IESO transition benefits related to avoided carbon costs, midpoint and range, $m 2025 [88](#page-82-2) Benefit (CADm) Full-priced carbon Carbon emissions policy shield (4) Avoided carbon c...

AI summary The provided text presents Table 4-3, which quantifies different methods for calculating IESO transition benefits related to avoided carbon costs for the year 2025. It compares two methodologies: 'Full-priced carbon' and 'Carbon emissions policy shield.' The benefits are categorized into three areas: accelerated deployment of resources, control room improvements, and more advanced system pathways, with figures provided as midpoints and ranges in millions of Canadian dollars.

Section 571 p. pp. 82-83
4.75 To determine the net benefit of the establishment of the IESO, we must compare the incremental benefits determined in this report to the incremental costs of having an IESO. 87 For sources, see Appendix 3. 88 For sources, see Appendix...

AI summary The text outlines the methodology for determining the net benefit of establishing an Independent Electricity System Operator (IESO) in Nova Scotia. It clarifies that the analysis focuses on incremental benefits versus incremental costs (such as staff duplication, real estate, and one-off setup costs), rather than total costs, as many costs would have been incurred regardless. To facilitate a comparison, the report converts the present value of benefits into an Equivalent Annual Benefit (EAB) using an annuity factor based on a discount rate and time period.

Table 4-4 Equivalent annual benefit, $m 202589 p. p. 83
Table 4-4 Equivalent annual benefit, $m 202589 Equivalent annual benefit, annuity corresponding to PV of benefits Low Mid. High Phase 1 15 29 43 Phase 2 20 71 122 Total $35 $100 $165 <sup>89 For sources, see Appendix 3. - ES.28 This ana...

AI summary The text presents an analysis of the Equivalent Annual Benefit (EAB) for Nova Scotia's transition to an Independent Electricity System Operator (IESO-NS). It provides a breakdown of annual benefits across different scenarios (Low, Mid, High) for Phase 1 and Phase 2, totaling up to $165 million. The analysis further calculates potential net benefits to consumers by subtracting illustrative incremental operating costs from these EAB figures, resulting in estimated benefit-to-cost ratios ranging from 1.8 to 8.7.

Section 574 p. p. 84
- 4.81 Because the timeline of Phase 2 is still under development, we also provide a sensitivity analysis using a conservative timeline of 2028 as the initial stage of Phase 2 and 2032 for control room improvements, although improvements a...

AI summary The text presents a sensitivity analysis for Phase 2 of a project, using a conservative timeline (starting in 2028) to estimate potential benefits. In the midpoint case, benefits are estimated at $1.287 billion, representing a 10% decrease from the base case. Specifically, control room improvements contribute $189 million to the midpoint case, with cascading benefits totaling $459 million. The analysis provides a range of benefits from $460 million to $2.113 billion.

Benefits and costs of Phase 1 of the creation of IESO-NS p. p. 86
Benefits and costs of Phase 1 of the creation of IESO-NS 5.6 In this section, we describe Phase 1 core roles and benefits, supporting roles and benefits, as well as incremental costs of implementation. Phase 1 core roles: timelier and effi...

AI summary The document introduces an analysis of Phase 1 of the creation of the Independent Electricity System Operator Nova Scotia (IESO-NS). It outlines the framework for evaluating the core roles and benefits of the initiative, which include facilitating timelier and more efficient investments in transmission and energy resources, alongside the identification of supporting roles and the incremental costs associated with implementation.

Transmission planner and long-term security of supply p. pp. 86-87
Transmission planner and long-term security of supply - A1.1 The creation of an ISO in Nova Scotia has been under consideration for well over a decade.[96](#page-87-0) In recent years, public opinion of NSP as a VIU with conflicting incent...

AI summary The text discusses the ongoing debate regarding the creation of an Independent System Operator (ISO) in Nova Scotia. It argues that Nova Scotia Power (NSP), acting as a Variable Independent Utility (VIU), faces an inherent conflict of interest between its duty to provide reliable, affordable electricity and its obligation to generate profit for shareholders. This conflict may lead to biased system planning, where the utility might delay transmission upgrades to protect its core generation business or avoid costs due to rate pressures.

Independent transmission and resource planning p. p. 88
Independent transmission and resource planning - A1.11 A potential perception of bias may lead to denials or delays of installations for which the reliability benefits do outweigh the costs.[106,](#page-90-0) [107](#page-90-1) Rather than...

AI summary The text discusses the benefits of independent transmission and resource planning, specifically highlighting how an Independent System Operator (ISO) may be perceived as less biased than a for-profit utility. This perception can lead to faster approval processes and accelerated investment in necessary transmission and generation assets. Such independence is expected to improve system production costs by facilitating the quicker deployment of lower-cost generation and creating a more efficient balance between generation and transmission infrastructure.

Phase 1 supporting roles : the importance of independence p. pp. 88-90
Phase 1 supporting roles : the importance of independence - A1.14 Independence is the fundamental quality of an ISO that underlies most, if not all, benefits. However, many of the direct benefits of independence are less quantifiable. Inde...

AI summary The text discusses the fundamental importance of independence for an Independent System Operator (ISO), specifically the Independent Electricity System Operator Nova Scotia (IESO-NS). Independence is framed as a prerequisite for public trust, transparency, and attracting high-caliber staff. It argues that removing conflicts of interest inherent in Variable Independent Utilities (VIUs) fosters a level playing field for investors and developers. However, the text cautions that the benefits of independence are contingent on avoiding regulatory capture by incumbent utilities and acknowledges that Nova Scotia Power (NSP) retains significant functional decision-making over near-term capital expenditure delivery.

Market design p. pp. 90-91
Market design - A1.17 Market design includes rules and mechanisms that govern trading and access. Market access is improved by aligned incentives to find capacity for new connections and timeliness of connection responses. Vertically integ...

AI summary The text discusses market design principles, emphasizing that rules and mechanisms must govern trading and grid access fairly. It highlights how vertically integrated businesses can create barriers to entry for competitors through pricing rules and physical grid access. Specifically, it notes that market designs favoring locational signals may be resisted by network owners as they reduce the need for new assets. Additionally, the text identifies potential conflicts of interest when incumbents like Nova Scotia Power (NSP) perform feasibility and interconnection studies, potentially deterring new generation and storage projects.

Benefits and costs of Phase 2 of the creation of IESO-NS p. pp. 91-93
Benefits and costs of Phase 2 of the creation of IESO-NS - A1.25 The IESO takes on real-time operations roles in Phase 2. Much of the inherent biases and perceived conflicts of interest in operations would be eliminated with independent sy...

AI summary The document discusses Phase 2 of creating the Independent Electricity System Operator Nova Scotia (IESO-NS), focusing on the transition of real-time operations to an independent entity. The primary benefit cited is the elimination of inherent biases and perceived conflicts of interest in system operations. Phase 2 is expected to amplify the benefits of Phase 1 by providing more efficient operations through control room improvements, including roles for scheduling, residual energy system balancing, and settlement.

More efficient transmission and resource investment p. pp. 94-96
More efficient transmission and resource investment A1.39 Taking on the operations roles in Phase 2 can further unlock benefits in the core Phase 1 planning roles. Any improvements in operational efficiency may in the long run unlock diffe...

AI summary The text argues that assuming operational roles in Phase 2 can enhance core Phase 1 planning by unlocking operational efficiencies. These improvements could lead to reduced resource investment needs, better utilization of existing transmission infrastructure, and more informed long-term planning. Furthermore, an ISO with advanced system operation processes can facilitate more efficient resource and transmission choices within the Integrated Resource Plan (IRP), promoting a level playing field for diverse technologies like wind, storage, and non-wires alternatives while supporting clean energy goals and reducing system production costs.

Improved application of reliability standards and grid codes p. p. 96
Improved application of reliability standards and grid codes A1.43 An ISO taking over the operations role also scales the benefits derived from the supporting roles in Phase 1. With the ISO responsible for operations, it can better set gri...

AI summary The text discusses the operational benefits of an Independent System Operator (ISO) assuming the operations role within a multi-phase framework. It argues that by taking over operations, the ISO can more effectively establish and enforce grid and reliability standards as part of its broader industry governance responsibilities, thereby scaling the benefits derived from supporting roles in Phase 1.

Table A1-1 Benefits and cost categorisation p. p. 96
Table A1-1 Benefits and cost categorisation IESO Nova Scotia Role Outcome Benefits (🌼 y quantified in Chapter 4, and corresponding benefit number) CORE Transmission planner and long-term security of supply ■ Reduced risks borne by consumer...

AI summary The document outlines the benefits and costs associated with the roles of IESO Nova Scotia across various phases. Key benefits include reduced risks of cost overruns for consumers, more efficient transmission and resource investment, and improved system expertise. It highlights 'Key Levers' such as timeliness, removal of perceived bias, and increased innovation. Conversely, it identifies costs related to the implementation of separation, additional staffing, reduced decision-making efficiency, and potential loss of synergies and increased transaction costs between asset owners and operators.

Generation CapEx p. p. 96
Generation CapEx - A3.1 Capacity additions (MW) are informed by two primary sources: (1) NSP's 2025 10-Year Outlook for the 2026-2035 period; and (2) the 2023 Evergreen IRP additions from the CE1-E1-R2 scenario for the remaining period up...

AI summary The document outlines the methodology for determining generation capital expenditures (CapEx) for the 2026-2035 period. Capacity additions are derived from Nova Scotia Power's 2025 10-Year Outlook and the 2023 Evergreen Integrated Resource Plan (IRP). The analysis excludes CapEx for non-emitting, dispatchable resources (e.g., nuclear, carbon capture, green hydrogen) due to uncertainty. Capital costs per technology are based on a weighted mixture of EIA, NREL, and Lazard estimates, excluding financing costs.

Transmission CapEx p. p. 96
Transmission CapEx - A3.5 Transmission CapEx was informed by NSP's annual Capital Expenditure Plans filed between 2020 and 2026. The most recent plan, filed in 2026, [122](#page-103-0) includes forecast spending through 2030. Our forecast...

AI summary The document outlines the methodology for forecasting transmission capital expenditures (CapEx) through 2050. The analysis utilizes Nova Scotia Power's annual Capital Expenditure Plans (2020-2026) to establish a historic base spending Compound Annual Growth Rate (CAGR). It distinguishes between base spending and non-base spending, noting that non-base investments typically occur 1-2 years before new non-thermal resources come online. Figure A3-2 provides a visual comparison of historic and forecast CapEx against the 2020-2030 ACE and FTI forecasts.

Production costs p. pp. 96-104
Production costs A3.8 Production costs are short-run power production costs informed by primary confidential data sources provided to us by the IESO. Data sources include generation (GWh) for each major technology (coal, solar, wind, etc.)...

AI summary The text describes the methodology for estimating short-run power production costs for the 2026-2050 period. These costs are derived from confidential IESO data, including generation volumes, fuel costs, variable O&M, and startup/shutdown costs across various technologies. The analysis assumes negligible short-run production costs for wind and solar, noting that fixed costs are recovered through Power Purchase Agreements (PPAs) and accounted for as capital expenditures. For accelerated deployment scenarios, the average production cost per unit is shifted while keeping total yearly generation constant as a demand proxy.

Appendix 4: Assumptions summary p. p. 105
Appendix 4: Assumptions summary Phase 1: Planning and procurement responsibilities Assumptions (1) Shifting risk of cost overruns 0-50% reduction in cost overruns from 16% historic overspend 50-80% reduction in pass-through to customers fr...

AI summary This appendix outlines the quantitative assumptions used to model the financial and operational impacts of shifting planning and procurement responsibilities. It categorizes these assumptions into two phases: Phase 1 focuses on planning and procurement, highlighting potential cost overrun reductions, competitive procurement benefits, and timeline differences for Capex and carbon emission targets. Phase 2 focuses on system operation, estimating production cost reductions from control room improvements, advanced system planning, and the resolution of synergies between planners, procurers, and operators.

(4) Avoided carbon costs from accelerated deployment p. p. 107
(4) Avoided carbon costs from accelerated deployment - A5.15 A delay in the reduction in carbon emissions in the VIU case (while holding annual MWh production constant), will result in overall higher carbon emissions across the 2026-2050 p...

AI summary The text describes the methodology for calculating avoided carbon costs resulting from delays in the deployment of generation and transmission infrastructure. The analysis assumes that delays in the VIU case will lead to higher overall carbon emissions between 2026 and 2050. The calculation involves estimating the percentage of emissions subject to the Output-Based Pricing System (OBPS), applying Remaining Present Value (RPV) to emissions with and without delays, and multiplying by the federal carbon price trajectory while holding system demand constant.

Appendix 8 – IBM Economic Analysis p. p. 110
Appendix 8 – IBM Economic Analysis This Appendix has been provided in an electronic spreadsheet format NON-CONFIDENTIAL

AI summary The provided text is a placeholder heading for Appendix 8 of a regulatory proceeding, which contains an economic analysis related to the Integrated Resource Plan (IRP). The document indicates that the analysis is provided in an electronic spreadsheet format and is designated as non-confidential.

Appendix A p. p. 110
Appendix A Sum of Sum of Sum of Sum of Sum of Sum of Sum of Sum of 0490-265 EfficiencyOne M12438 - EfficiencyOne- 2025 Q2 Demand Side Management (DSM) Report Review Proceeding: Review of all filed reports and related correspondence. 0.30 $...

AI summary Appendix A contains a table listing various regulatory proceedings and compliance reporting requirements. It includes reviews for EfficiencyOne's 2025 Q2 Demand Side Management (DSM) Report, Halifax Regional Water Commission (HRWC) projects such as the Fairview Cove and Water Supply Enhancement Program, and infrastructure projects like the Port Wallace Transmission Main Highway 118 Crossing and the Burnside Operations Centre. The table tracks various costs and reporting statuses associated with these specific matters.

(a) General Comments p. p. 110
(a) General Comments Over the course of 2025, the SBA participated in approximately 67 NSPI matters, 3 E 1 matters, 5 NSPML matters, 1 IESO-NS matter and 1 WTI matter. These included paper and oral hearings as well as Review Proceedings wh...

AI summary The Small Business Advocate (SBA) reports on its regulatory activities in 2025, highlighting participation in approximately 67 Nova Scotia Power Inc. (NSPI) matters, including hearings, Review Proceedings, and information requests. Key activities involved specific assessments for the NSPML 2026 Assessment Application, NSPI FAM Audit, and NSPI 2025 ACE Plan. The SBA also engaged in various working groups and stakeholder sessions covering topics such as the Fuel Adjustment Mechanism, Demand Side Management, ELIADC successor tariff development, and grid interconnection processes.

Small Business Advocate p. p. 110
Small Business Advocate Company Total Hours for SBA and Consultants Sum of Fees for SBA Sum of Costs for SBA Sum of HST for SBA Total Sum for SBA Sum of Fees for Consultants (USD) Sum of Costs for Consultants (USD) Total Sum for Consultant...

AI summary The document provides a detailed breakdown of the Small Business Advocate's (SBA) involvement in various regulatory proceedings. It lists the total hours, fees, and costs associated with both the SBA and their consultants across multiple matters. Key activities include reviewing evidence, filing submissions, and attending hearings for projects such as the Fuel Adjustment Mechanism (FAM) audits, the 2023 Evergreen Integrated Resource Plan, and various grid and battery storage projects.

NOVA SCOTIA INDEPENDENT ENERGY SYSTEM OPERATOR p. p. 110
NOVA SCOTIA INDEPENDENT ENERGY SYSTEM OPERATOR 1791 Barrington Street, Suite 1010 Halifax, Nova Scotia PREMISES LEASE

AI summary The document provides the name and address of the Nova Scotia Independent Energy System Operator, located at 1791 Barrington Street, Suite 1010, Halifax, Nova Scotia. It serves as a heading for a section regarding a premises lease.

7.4 Extraordinary Equipment. p. p. 110
7.4 Extraordinary Equipment. The Tenant shall not install any equipment which might affect the capacity of either the structure or the basic systems of the Building.

AI summary The text specifies a restrictive covenant in a lease or regulatory agreement regarding the installation of extraordinary equipment. It prohibits the Tenant from installing any equipment that could potentially impact the capacity of the building's structure or its basic systems.

104301Letter IESO re: 2027/2028 Proposed Expenses, Revenue Requirement and Fees Application 1 passage
RE: 2027/2028 Proposed Expenses, Revenue Requirement and Fees Application
n its form or content, or in IESO Nova Scotia's participation in this proceeding, shall constitute a waiver of any such rights or an admission regarding the proper interpretation of sections 29 or 30. As noted by the Board in its Decision...

AI summary IESO Nova Scotia addresses uncertainty regarding the recovery of costs incurred prior to approval under the Board's interpretation of section 29(4) of the relevant legislation. To ensure certainty and timely fee recovery, the applicant requests a decision on the Application by March 31, 2027, and seeks direction on Phase 2 costs. The applicant highlights a planned transfer of operational control from Nova Scotia Power to IESO Nova Scotia in Spring 2028, necessitating the immediate commencement of Phase 2 Control Centre expenditures.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →