1 TABLE OF CONTENTS 2 1.0 INTRODUCTION......................................................................................................... 5 3 2.0 LOAD FORECAST ............................................................................
AI summary The document outlines a regulatory proceeding's structure, focusing on load forecasting, existing and new generation resources, and capacity changes. Key sections include discussions on hydro projects (Mersey, Wreck Cove, Annapolis Tidal), Brooklyn Power, Lingan Unit 2, and updates to the Integrated Resource Plan (IRP).
Page 5 of 60 2022 10-Year System Outlook NON-CONFIDENTIAL 1 • A summary of environmental and emissions regulatory requirements, as well as forecast 2 compliance in Section 5. Section 5 also includes projections of the level of renewable 3...
AI summary NS Power's 2022 10-Year System Outlook updates its Integrated Resource Plan (IRP) to align with Scenario 3.1C, reflecting revised load forecasts and environmental policies. The 2020 IRP's reference plan (2.0C) is no longer optimal due to changes in electrification and carbon policy. A 2022 Evergreen IRP study will refine long-term strategies, informing future system outlooks.
incident load factors for each of the rate classes. Peak savings related to Demand 14 Response (DR) activities, adjusted for Effective Load Carrying Capacity (ELCC) as outlined in 15 the 2020 IRP and including critical peak pricing and dir...
AI summary The text references incident load factors across rate classes and incorporates peak savings from Demand Response (DR) activities adjusted for Effective Load Carrying Capacity (ELCC) as outlined in the 2020 Integrated Resource Plan (IRP), including critical peak pricing and direct control components.
acity are shown in Figure 19. The 20 firm generating capability for the wholesale market participants is set out in Figure 4. 21 22 Figure 3: 2022 Firm Generating Capability for NS Power and IPPs Winter Net Plant/System Fuel Type Capacity...
AI summary The document outlines 2022 firm generating capability data for NS Power and IPPs, including hydroelectric plants (Avon, Black River, Lequille, Bear River) with specific winter net capacities. Wind, hydro, and solar capacities are noted as Effective Load Carrying Capacity (ELCC) values, referencing Section 6.3 for details.
1 The Net Operating Capacity of the thermal units and large hydro units covered by the NERC 2 criteria do not require adjustments at this point. NS Power will continue to refresh unit maximum 3 capacities in the 10-Year System Outlook each...
AI summary NS Power states that net operating capacities of thermal and large hydro units do not require adjustments, with annual updates planned. Mersey Hydro System redevelopment is underway due to aging infrastructure, critical for 25% of domestic hydro production. The 2020 IRP found redevelopment economically viable over decommissioning based on Hydro Asset Study (HAS) assumptions.
1 3.1.3 Wreck Cove Hydro 2 3 The Wreck Cove Hydro system is an important asset for NS Power, providing critical and 4 renewable generation for peak demand periods. With the ability to quickly provide 212 MW of 5 peak capacity from two oper...
AI summary The Wreck Cove Hydro system, NS Power's largest hydroelectric asset, is undergoing a Life Extension and Modernization (LEM) Project to replace turbines with more efficient models, increasing annual generation by 5% to 315 GWh. The 2020 Integrated Resource Plan (IRP) outlines a decarbonization strategy emphasizing renewable energy integration over 25 years.