Topic/Matter Intersection

Topic:"Integrated Resource Plan" in M12451

Matter: Nova Scotia Power Inc. - 2026 General Rate Application (GRA)
48 passages 11 documents

Integrated Resource Plan across all matters →

N-52026-2027 GRA Appendix 1-6 - Redacted 2 passages
Limitations of Adaptation Planning Exercise p. p. 33
Limitations of Adaptation Planning Exercise NS Power acknowledges that climate change poses set of risks that is broader than only physical risks, to company assets. While the broader scope is not addressed in this climate adaptation plann...

AI summary NS Power's climate adaptation planning exercise focuses on transition risks through strategic deliverables like the Integrated Resource Plan (IRP) and 10-Year System Outlook (10YSO), but does not address broader physical risks to company assets. Transition risks are managed within System Planning functions.

4.2. NS Power's Asset Risk Assessment Process – Risk Profiles p. pp. 56-57
4.2. NS Power's Asset Risk Assessment Process – Risk Profiles In the assessment of risk, NS Power considers three main aspects for each asset: its mission and utilization, its criticality to the electrical system, and its condition or like...

AI summary NS Power assesses asset risk based on mission/utilization, criticality, and condition. Risk profiles guide mitigation strategies and capital planning. Criticality considers health, safety, environmental, financial, and brand impacts. Condition assessments use maintenance, monitoring, and field experience. The process is outlined in AMPs, CEJC, and NSPI-AMS-002.

N-24NSPI (ECC) RIR 1-41 16 passages
Notes: p. pp. 180-181
Notes: - Burnside - o 4 units at Burnside - o Pratt & Whitney units; In service in 1976. - o 33 MW Each unit - o Fuel Oil / Gas - o Peaking Plant Quick to start in an emergency. - o Used in synchronous condenser mode for additional voltage...

AI summary The text provides details about several power generation units, including their locations, capacities, fuel types, and operational roles. It highlights that these units are used for peaking and backup power, and that capital spending has increased in the past decade to modernize them. The 2020 IRP determined that maintaining these units is more cost-effective than decommissioning or building new ones, with a probable retirement date of 2050.

MODELING APPROACH p. p. 9
MODELING APPROACH Capacity expansion and production cost optimization modeling developed least-cost portfolios for each scenario. The scenarios are compliant with current legislation, including the 2030 environmental policy targets of coal...

AI summary The modeling approach outlines capacity expansion and production cost optimization to develop least-cost portfolios aligned with 2030 environmental targets and net zero scenarios. The results include minimized system costs, emissions, reserve margins, and generation profiles.

KEY FINDINGS p. pp. 9-10
KEY FINDINGS Based on the common themes observed, the following are the key guiding principles to inform the Action Plan and Roadmap Items: - Variable renewable capacity additions are required to meet the 2030 targets. Up to 1500MW of addi...

AI summary Key findings emphasize the need for 1500MW of additional wind capacity and 200MW of solar capacity by 2030. Battery storage, firm capacity, and synchronous condensers are critical for system reliability. The Atlantic Loop project is highlighted as beneficial for reducing costs and emissions, requiring government support. NS Power has updated its 2020 IRP Action Plan and Roadmap based on 2023 modeling.

Battery Storage p. p. 12
Battery Storage - Battery storage is added to all scenarios with additions beginning as soon as 2025 in many scenarios. - At least 100MW of 4-hour battery storage is added by 2030 in the majority of scenarios. - Increased additions of batt...

AI summary Battery storage is included in various scenarios, with significant additions expected by 2030. It provides multiple benefits like energy arbitrage and wind integration, though some services are not captured in the IRP model. No Atlantic Loop scenarios show higher battery storage additions.

GENERATION MIX p. pp. 14-17
GENERATION MIX The evergreen IRP modeling results demonstrate that annual generation profiles are increasingly decarbonized through the planning horizon in line with environmental policy changes in 2030 and 2035 (please refer toFigure 4)....

AI summary The evergreen IRP modeling shows an increasing decarbonization of the generation mix through 2030 and 2035, with coal being phased out and replaced by wind and battery storage. Wind generation is a key contributor across all scenarios, with curtailment rates ranging from 10% to 45%. Gas resources are used primarily in peaking capacity, with higher utilization in No Atlantic Loop scenarios. Emissions are reduced by over 90% from 2005 levels in all scenarios.

ITEM 2: ELECTRIFICATION p. p. 19
ITEM 2: ELECTRIFICATION Electrification is a key variable in this IRP as increased electric vehicle (EV) adoption and heating electrification play a significant role in increasing load requirements through the planning horizon. The evergre...

AI summary Electrification is a key factor in the Integrated Resource Plan (IRP), driven by the increasing adoption of electric vehicles and heating electrification, which contribute to a projected firm peak growth of 200MW by 2030.

Item 2a: Electrification Strategy p. p. 19
Item 2a: Electrification Strategy Publish Electrification Strategy report, developed as part of the IRP Action Plan, in 2023 with opportunity for stakeholder review and comment.

AI summary The Electrification Strategy report was published in 2023 as part of the IRP Action Plan, allowing for stakeholder review and comment.

Item 3a: Thermal Plant Retirement p. p. 20
Item 3a: Thermal Plant Retirement Proceed with Trenton 5 retirement plan based on the updated evergreen IRP projections (2027/2028). NS Power will manage operating restrictions of the thermal fleet to meetfirm capacity requirements are met...

AI summary The document discusses the retirement of the Trenton 5 thermal plant based on updated IRP projections and outlines NS Power's plan to manage the thermal fleet's operating restrictions to meet capacity requirements while minimizing utilization and sustaining capital investment. It also mentions the development of a coal retirement plan with consideration of cold reserve operating modes.

ITEM 1: WIND INTEGRATION STUDIES p. p. 23
ITEM 1: WIND INTEGRATION STUDIES Publish the results ofthe ongoing wind integration studiesin 2023. Provide guidance on integration asset requirements as an outcome in alignment with the planned variable renewable capacity additions. Conti...

AI summary The document calls for publishing the results of ongoing wind integration studies in 2023, providing guidance on integration asset requirements aligned with planned variable renewable capacity additions, and monitoring for significant divergence from modeled assumptions in the evergreen IRP.

ITEM 2: SUSTAINING CAPITAL p. p. 23
ITEM 2: SUSTAINING CAPITAL Pursue economic reinvestment in existing hydro and combustion turbines with individual capital applications as applicable; economic justification as part of a capital application will be required to confirm a dec...

AI summary The document outlines the need for economic reinvestment in existing hydro and combustion turbines through individual capital applications, requiring economic justification. It also emphasizes monitoring sustaining capital investment in thermal units and conducting analyses if significant changes from IRP assumptions are observed.

ITEM 4: INSTALLED COSTS OF WIND, SOLAR AND ENERGY STORAGE p. p. 23
ITEM 4: INSTALLED COSTS OF WIND, SOLAR AND ENERGY STORAGE Continue to track the installed costs of wind, solar, and energy storage to look for significant variations from the trajectories analyzed in the evergreen IRP. If observed, update...

AI summary The document recommends continuing to monitor the installed costs of wind, solar, and energy storage for significant deviations from the trajectories analyzed in the evergreen IRP, with updates to the capacity mix as needed.

ITEM 5: FEDERAL CLEAN ELECTRICITY REGULATIONS (CER) p. p. 23
ITEM 5: FEDERAL CLEAN ELECTRICITY REGULATIONS (CER) Track the ongoing development of the Federal Clean Electricity Regulations (CER). In particular, monitor for changes to carbon pricing policy or limitations on use of gas and oil-fired ge...

AI summary The document discusses tracking the development of the Federal Clean Electricity Regulations (CER), with a focus on monitoring changes to carbon pricing policy and limitations on gas and oil-fired generating facilities beyond those considered in the evergreen Integrated Resource Plan (IRP).

ENABLING THE ACTION PLAN p. pp. 24-25
ENABLING THE ACTION PLAN Although the evergreen IRP model provides a range of outcomes to 2050, the Action Plan reflects NS Power's near-termpa[th](#page-25-2) forwardand the progressionof these identified resources and programs will be cr...

AI summary The Action Plan outlines NS Power's resource development strategy to meet 2030 decarbonization targets, with Figure 9 illustrating the timeline for project development. The plan is subject to change and serves as a visual guide for implementing the updated Action Plan.

CONCLUSION p. pp. 25-26
CONCLUSION The evergreen IRP Action Plan and Roadmap will play a key role in enabling NS Power to meet the challenges and opportunities of the ever-evolving electricity planning environment. This plan serves to enable the path to 2030 whil...

AI summary The evergreen IRP Action Plan and Roadmap are central to NS Power's strategy for achieving 2030 decarbonization targets and building a resilient energy future. The plan provides flexibility to adapt to changing conditions and emphasizes collaboration with stakeholders to support the energy transition. Annual updates will ensure transparency and continued stakeholder engagement.

9 Decision-Making p. pp. 101-103
9 Decision-Making NS Power's decision-making approach is consistently applied across long-term, short-term, and day-to-day activities. As shown in Figure 11, factors considered include cost, policies and regulations, climate adaptation, as...

AI summary NS Power uses a consistent decision-making framework that considers cost, policies, climate adaptation, asset mission, and asset condition to make 'least regrets' decisions. This approach supports initiatives like the Integrated Resource Plan (IRP) and ensures safety and environmental compliance.

Integrated Resource Plan (IRP) p. p. 107
Integrated Resource Plan (IRP) The Integrated Resource Plan (IRP) is a comprehensive public utility planning exercise that integrates resource options (both supply and demand-side) in order to develop a long-term electricity strategy for t...

AI summary The Integrated Resource Plan (IRP) is a long-term electricity strategy for Nova Scotia Power, developed through a comprehensive planning process that considers both supply and demand-side resources. It is updated periodically, with the 2020 IRP indicating the need for revision due to changes in environmental policy, load, and resource assumptions. The IRP is submitted to the Nova Scotia Utility and Review Board (NSUARB) and involves stakeholder engagement.

N-27NSPI (NSEB) RIR 1-152 - Redacted (settlement agreement attached at IR-1) 2 passages
The Path to 2030 - 2024 Update p. p. 75
The Path to 2030 - 2024 Update 1 TABLE OF CONTENTS 2 3 1.0 EXECUTIVE SUMMARY 5 4 2.0 INTRODUCTION 9 5 3.0 2030 DECARBONIZATION GOALS 11 6 3.1 80 Percent Renewable Electricity Sales 11 7 3.2 Coal Phase Out 12 8 3.3 Proposed Clean Electricit...

AI summary This document outlines Nova Scotia's 2030 Clean Power Plan, including goals for renewable energy, coal phase-out, and resource development. It details various projects such as wind and solar resources, battery storage, and reliability tie initiatives.

1 9.0 CONCLUSION p. p. 134
1 9.0 CONCLUSION 2 The Nova Scotia 2030 Clean Power Plan is a comprehensive clean energy transition plan that is 3 aligned with NS Power's most recent IRP Action and Roadmap update. Delivering on this plan 4 will require significant invest...

AI summary The Nova Scotia 2030 Clean Power Plan is aligned with NS Power's Integrated Resource Plan and requires collaboration among multiple stakeholders to achieve decarbonization goals. NS Power is committed to supporting the transition of accountabilities to the NSIESO and will work with the Province and other stakeholders to implement the plan.

N-31NSPI (ECC) IR 1 to 41 - REFILED 17 passages
Notes: p. pp. 81-82
Notes: - Burnside - o 4 units at Burnside - o Pratt & Whitney units; In service in 1976. - o 33 MW Each unit - o Fuel Oil / Gas - o Peaking Plant Quick to start in an emergency. - o Used in synchronous condenser mode for additional voltage...

AI summary The document outlines details about various power generation units, including their locations, capacities, fuel types, and service history. It highlights the decision to maintain and modernize these units rather than decommission them, citing cost-effectiveness in the 2020 IRP. The units are noted for their reliability, fast start-up capabilities, and use during peak demand periods.

MODELING APPROACH p. p. 110
MODELING APPROACH Capacity expansion and production cost optimization modeling developed least-cost portfolios for each scenario. The scenarios are compliant with current legislation, including the 2030 environmental policy targets of coal...

AI summary The modeling approach outlines scenarios for capacity expansion and production cost optimization, aligning with 2030 environmental policy targets and net zero goals. Each scenario considers factors like electrification pace, resource strategy, and the Atlantic Loop, with results focusing on minimizing total system costs through Net Present Value of Revenue Requirement (NPVRR).

KEY FINDINGS p. pp. 110-111
KEY FINDINGS Based on the common themes observed, the following are the key guiding principles to inform the Action Plan and Roadmap Items: - Variable renewable capacity additions are required to meet the 2030 targets. Up to 1500MW of addi...

AI summary The key findings emphasize the need for significant renewable energy additions, including 1500MW of wind and 200MW of solar by 2030, along with firm capacity and battery storage. The Reliability Tie and Atlantic Loop are highlighted as critical for system reliability and cost reduction. Synchronous condensers and SMRs are also identified as important future resources.

Battery Storage p. p. 113
Battery Storage - Battery storage is added to all scenarios with additions beginning as soon as 2025 in many scenarios. - At least 100MW of 4-hour battery storage is added by 2030 in the majority of scenarios. - Increased additions of batt...

AI summary Battery storage is a key component in various scenarios, with significant additions expected by 2030. It provides multiple services such as energy arbitrage and wind integration, though some services like voltage and frequency support are not captured in the IRP model. Scenarios without the Atlantic Loop show higher battery storage additions.

GENERATION MIX p. pp. 115-118
GENERATION MIX The evergreen IRP modeling results demonstrate that annual generation profiles are increasingly decarbonized through the planning horizon in line with environmental policy changes in 2030 and 2035 (please refer toFigure 4)....

AI summary The document discusses the generation mix in Nova Scotia as modeled by the evergreen IRP, highlighting the increasing use of wind and battery storage, the phasing out of coal, and the impact of curtailment and emissions across different scenarios. Wind generation is significant, with curtailment ranging from 10–45%, and gas resources are used in peaking capacity. Emissions are reduced by over 90% from 2005 levels in all scenarios.

ITEM 1: REGIONAL INTEGRATION STRATEGY p. p. 120
ITEM 1: REGIONAL INTEGRATION STRATEGY Develop a Regional Integration Strategy to provide access to firm capacity and low-carbon energy while increasing the reliability of Nova Scotia's interconnection with North America. With virtually no...

AI summary The document proposes a Regional Integration Strategy to enhance access to firm capacity and low-carbon energy, improve system reliability, and support wind integration in Nova Scotia. It emphasizes the need for a reliability tie independent of the Atlantic Loop due to limited hydro potential and the phase-out of coal.

ITEM 2: ELECTRIFICATION p. p. 120
ITEM 2: ELECTRIFICATION Electrification is a key variable in this IRP as increased electric vehicle (EV) adoption and heating electrification play a significant role in increasing load requirements through the planning horizon. The evergre...

AI summary Electrification, particularly through increased EV adoption and heating electrification, is a key factor in the Integrated Resource Plan (IRP), contributing to a projected firm peak load growth of 200MW by 2030.

Item 2a: Electrification Strategy p. p. 120
Item 2a: Electrification Strategy Publish Electrification Strategy report, developed as part of the IRP Action Plan, in 2023 with opportunity for stakeholder review and comment.

AI summary The Electrification Strategy report, developed as part of the IRP Action Plan, was published in 2023 and made available for stakeholder review and comment.

Item 3a: Thermal Plant Retirement p. p. 121
Item 3a: Thermal Plant Retirement Proceed with Trenton 5 retirement plan based on the updated evergreen IRP projections (2027/2028). NS Power will manage operating restrictions of the thermal fleet to meetfirm capacity requirements are met...

AI summary The document outlines the retirement plan for the Trenton 5 thermal plant based on updated IRP projections and discusses the management of the thermal fleet to meet capacity requirements while minimizing utilization. It also mentions the development of a coal retirement plan for remaining units, including cold reserve operating modes.

Item 4b: Hybrid Peak Electrification Scenario p. p. 122
Item 4b: Hybrid Peak Electrification Scenario Further assess the value of the hybrid peak building electrification scenario based on the outcomes of the evergreen IRP. This will include development of program cost estimates and validation...

AI summary This section discusses the assessment of a hybrid peak building electrification scenario, incorporating insights from the evergreen IRP. It highlights the need to develop program cost estimates and validate savings potential, with NS Power looking to learn from North American utilities that have implemented similar initiatives.

IRP ROADMAP p. pp. 122-124
IRP ROADMAP The following roadmap items were identified to monitor for changes in the planning environment and support progress on the path to 2030 and beyond. NS Power will monitor the roadmap items in parallel with execution of the Actio...

AI summary The IRP Roadmap outlines key items NS Power will monitor to support progress toward 2030 and beyond, in parallel with executing the Action Plan.

ITEM 1: WIND INTEGRATION STUDIES p. p. 124
ITEM 1: WIND INTEGRATION STUDIES Publish the results ofthe ongoing wind integration studiesin 2023. Provide guidance on integration asset requirements as an outcome in alignment with the planned variable renewable capacity additions. Conti...

AI summary The document requests the publication of ongoing wind integration studies from 2023, guidance on asset requirements for integration, and monitoring of results against assumptions in the evergreen IRP, with updates triggered if significant divergence occurs.

ITEM 4: INSTALLED COSTS OF WIND, SOLAR AND ENERGY STORAGE p. p. 124
ITEM 4: INSTALLED COSTS OF WIND, SOLAR AND ENERGY STORAGE Continue to track the installed costs of wind, solar, and energy storage to look for significant variations from the trajectories analyzed in the evergreen IRP. If observed, update...

AI summary The document emphasizes the need to continue tracking installed costs of wind, solar, and energy storage to identify significant deviations from the trajectories outlined in the evergreen IRP, with potential updates to the capacity mix if necessary.

ITEM 5: FEDERAL CLEAN ELECTRICITY REGULATIONS (CER) p. p. 124
ITEM 5: FEDERAL CLEAN ELECTRICITY REGULATIONS (CER) Track the ongoing development of the Federal Clean Electricity Regulations (CER). In particular, monitor for changes to carbon pricing policy or limitations on use of gas and oil-fired ge...

AI summary The document highlights the need to track the development of the Federal Clean Electricity Regulations (CER), with a focus on changes to carbon pricing policy and restrictions on gas and oil-fired generating facilities, beyond what is already considered in the evergreen Integrated Resource Plan (IRP).

ENABLING THE ACTION PLAN p. pp. 125-126
ENABLING THE ACTION PLAN Although the evergreen IRP model provides a range of outcomes to 2050, the Action Plan reflects NS Power's near-termpa[th](#page-126-2) forwardand the progressionof these identified resources and programs will be c...

AI summary The document discusses NS Power's updated Action Plan and its 2030 Resource Development Plan, highlighting the importance of resource and program progression in meeting decarbonization targets. The plan is subject to change and provides a visual guide to resource development aligned with the Action Plan.

CONCLUSION p. pp. 126-127
CONCLUSION The evergreen IRP Action Plan and Roadmap will play a key role in enabling NS Power to meet the challenges and opportunities of the ever-evolving electricity planning environment. This plan serves to enable the path to 2030 whil...

AI summary The evergreen Integrated Resource Plan (IRP) Action Plan and Roadmap are critical for NS Power to achieve its 2030 decarbonization targets and long-term sustainability goals. The plan provides flexibility to adapt to changes in the electricity planning environment, including advancements in renewable technology and evolving climate policies. NS Power will provide annual updates to stakeholders and continue collaborating with partners to support the energy transition.

5 Regulatory Context and Stakeholder Engagement p. pp. 193-194
5 Regulatory Context and Stakeholder Engagement NS Power is regulated under the Public Utilities Act and the Electricity Act by the Nova Scotia Utility and Review Board (UARB), and through these Acts NS Power is mandated to serve the elect...

AI summary NS Power is regulated under the Public Utilities Act and Electricity Act by the Nova Scotia Utility and Review Board (UARB). The UARB oversees various proceedings such as General Rate Applications and Integrated Resource Plans. NS Power's EAM division supports these processes, and senior leadership is involved in reviewing deliverables and providing feedback on asset management practices. Changes from the Energy Reform Act may impact these processes.

N-48Direct testimony of Jacob Pous 2 passages
1 Q. WHAT IS THE FUTURE PLANNING HORIZON ASSOCIATED WITH THE 2009 2 IRP UPDATE? p. p. 49
1 Q. WHAT IS THE FUTURE PLANNING HORIZON ASSOCIATED WITH THE 2009 2 IRP UPDATE? 3 A. The 2009 IRP Update reflects a 25-year planning horizon from the initial 2007 IRP. The ending date of the IRP is 2032.8 4 5

AI summary The 2009 Integrated Resource Plan (IRP) Update extends the planning horizon to 25 years, ending in 2032, based on the initial 2007 IRP.

6 Q. WHAT IS THE STATUS OF EXISTING GENERATION AS REFLECTED IN THE 7 2009 IRP UPDATE? p. p. 49
6 Q. WHAT IS THE STATUS OF EXISTING GENERATION AS REFLECTED IN THE 7 2009 IRP UPDATE? 8 A. The Company states that "[a]ll existing generation facilities are assumed to continue in operation throughout the planning period."9 9 ( Emphasis ad...

AI summary The Company asserts that all existing generation facilities are assumed to continue operating throughout the planning period as outlined in the 2009 Integrated Resource Plan (IRP) update.

N-53Vincent Musco CV - Bates White 1 passage
Consulting reports p. p. 0
g 2021 RFP to Procure Zonal Resource Credits. For the Illinois Commerce Commission (April 2021). - Post-bid Report of the Procurement Monitor for Ameren Illinois Company, Commonwealth Edison Company, and MidAmerican Energy Company Spring 2...

AI summary The text lists various consulting reports and procurement monitor reports related to energy and utility proceedings in Illinois and Hawaii, including a comment on Nova Scotia Power's Integrated Resource Plan submitted to the Nova Scotia Utility and Review Board.

101354Board Decision 3 passages
3.4.1.3.1 Exclusion of Wreck Cove, Mersey and Tusket Hydro System Decommissioning Costs from Proposed Depreciation Rates p. p. 77
to be maintained indefinitely. Therefore, for the purposes of the current GRA, the Board finds that it is appropriate to exclude Wreck Cove decommissioning costs from the proposed depreciation rates. [162] The Mersey Hydro System has a cap...

AI summary The Board excludes Wreck Cove and Mersey Hydro decommissioning costs from current depreciation rates. Mersey contributes 220 GWh annually to NS Power's renewable targets. IRP analyses found redevelopment more economical than decommissioning, with final decisions pending the 2025/26 IRP. Exclusions may be revisited in future depreciation studies.

3.4.1.3.2 Adjustments to Net Salvage Rates p. p. 81
lti-stakeholder framework for determining whether, when, or how full or partial decommissioning of hydro facilities should occur, nor who would ultimately bear responsibility. NS Power further stated: … NS Power views the present proceedin...

AI summary NS Power proposes a structured process for evaluating hydro facility decommissioning, emphasizing stakeholder engagement and regulatory oversight. The Board agrees, directing NS Power to initiate engagement and file biannual updates ahead of the next General Rate Application (GRA). The process will assess hydro assets' viability based on historical data and operational constraints.

4.4 Lingan Unit 2 and Trenton Unit 5 p. p. 295
as required by the North American Electric Reliability Corporation (NERC) and Northeast Power Coordinating Council (NPCC) requirements. It explained the changes to the coal plant retirement timelines: (a) The retirement assumption for Ling...

AI summary The retirement timelines for Lingan Unit 2 and Trenton Unit 5 were extended to 2027 due to updated load forecasts and system outlooks. Lingan 2's extension followed a 108 MW increase in 2024 firm peak load, requiring its operation until replacement capacity from IESO-NS is online. Trenton 5's 2027 retirement date was confirmed by the 2023 Evergreen IRP and further detailed in the 2024 DDA report, delaying decommissioning until after 2029.

99706ECC (NSPI) IR-1 to IR-41 1 passage
Request IR-15:
Request IR-15: - Please provide a reconciliation and detailed explanation of any differences between the expected - useful lives set out in the most recent integrated resource plan (or equivalent analysis), the most - recently filed integr...

AI summary Request IR-15 seeks a reconciliation and detailed explanation of discrepancies between expected useful lives in the integrated resource plan and the depreciation lives applied for, on an account-by-account basis.

100780Closing Submission - NSPI 1 passage
4.1 Future of Hydro in Nova Scotia p. p. 52
4.1 Future of Hydro in Nova Scotia The Board Panel's questions during the hearing appropriately highlighted both the magnitude of NS Power's potential hydro decommissioning obligations and the substantial uncertainty surrounding the ultima...

AI summary The Board Panel emphasized uncertainties around NS Power's hydro decommissioning obligations and the lack of a multi-stakeholder framework for decisions. NS Power acknowledges its responsibility to initiate discussions with regulators and stakeholders but notes outcomes are not solely within its control. The Integrated Resource Plan (IRP) will evaluate hydroelectric units based on historical data and constraints to inform future decisions.

101354Board Decision 2 passages
3.4.1.3.1 Exclusion of Wreck Cove, Mersey and Tusket Hydro System Decommissioning Costs from Proposed Depreciation Rates p. p. 77
to be maintained indefinitely. Therefore, for the purposes of the current GRA, the Board finds that it is appropriate to exclude Wreck Cove decommissioning costs from the proposed depreciation rates. [162] The Mersey Hydro System has a cap...

AI summary The Nova Scotia Utility and Review Board excludes Wreck Cove, Mersey, and Tusket Hydro System decommissioning costs from proposed depreciation rates. Mersey's redevelopment is deemed more economical than decommissioning based on IRP analyses, with final decisions pending the 2025/2026 IRP. The Board emphasizes temporary exclusion, allowing reconsideration if future IRP findings favor decommissioning.

3.4.1.3.2 Adjustments to Net Salvage Rates p. p. 81
lti-stakeholder framework for determining whether, when, or how full or partial decommissioning of hydro facilities should occur, nor who would ultimately bear responsibility. NS Power further stated: … NS Power views the present proceedin...

AI summary NS Power proposes a structured approach to address hydro decommissioning, emphasizing stakeholder engagement and regulatory oversight. The Board agrees, directing NS Power to initiate stakeholder discussions, file regular updates, and include decommissioning costs in future rate applications if needed. The process aims to ensure transparency and coordination in addressing hydro asset decommissioning impacts.

101825Board Order 1 passage
The Board orders that: p. p. 4
study to the lives proposed in the IRP; and - The peer analysis relied upon by the company in an Excel file (para. [255]); - f) To address the additional cost-of-service concerns raised by Synapse in its application to the Board later in 2...

AI summary The Board has ordered various actions including studies related to the IRP, addressing cost-of-service concerns, reviewing distribution system cost allocation methods, revising the Climate Change Adaptation Plan, and updating regulations as directed. These actions are part of ongoing regulatory oversight and compliance.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →