Topic:"Integrated Resource Plan" in M12696

Matter: NSP Maritime Link Inc. (NSPML) - Application to Review the Holdback Mechanism
2 passages 2 documents

Integrated Resource Plan across all matters →

N-5NSPML (NSEB) RIRs 1-19 - Redacted 1 passage
Generation Planning p. p. 38
Generation Planning Generation planning for the Island Interconnected System ensures that there is sufficient generation, both capacity (MW) and energy (MWh) to supply the load as provided in load forecasts for future years. NLH uses an in...

AI summary NLH uses Strategist® for generation planning, ensuring the Island Interconnected System meets LOLH targets (≤2.8 hours/year) and firm energy requirements. Capacity shortfalls are addressed with low-cost combustion turbines, while energy deficiencies trigger additional energy sources. Grid forced outage rates are excluded from LOLH calculations.

N-8Evidence - CA 1 passage
EXPERT TESTIMONY p. p. 10
hern Alliance for Clean Energy. Adequacy of consideration of energy efficiency in Georgia Power's 2010 integrated resource plan, including cost effectiveness, rate and bill impacts, and lost revenues. Georgia PSC Docket No. 31082, direct t...

AI summary Southern Alliance for Clean Energy (SACE) provided testimony in multiple regulatory proceedings from 2010–2013, challenging the adequacy of energy efficiency considerations in Georgia Power and South Carolina Electric & Gas's integrated resource plans (IRPs) and demand-side management (DSM) plans. Focus areas included cost-effectiveness, stakeholder engagement, resource mix analysis, and program revisions.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →