Topic/Matter Intersection

Topic:"Jurisdictional Questions" in M03324

Matter: E-NERC-R-10 - North American Electric Reliability Corporation - Reliability Standards; and Northeast Power Coordinating Council, Inc. - Regional Reliability Criteria
8 passages 7 documents

Jurisdictional Questions across all matters →

N-1Notice of Filing of Amendments to the Bylaws 6/29/2010 1 passage
Section 2
Gerald W. Cauley President and Chief Executive Officer David N. Cook Vice President and General Counsel North American Electric Reliability Corporation 116-390 Village Boulevard Princeton, NJ 08540-5721 (609) 452-8060 (609) 452-9550 – facs...

AI summary The document contains contact information for executives and legal counsel from the North American Electric Reliability Corporation (NAERC), including their titles, addresses, phone numbers, and email addresses.

N-9Northeast Power Coordinating Council, Inc. Criteria Filing 6/30/2010 1 passage
Section 496 p. pp. 74-77
2 This document, when downloaded or printed, becomes UNCONTROLLED. Users should check the NPCC website for the current CONTROLLED version of this document.

AI summary The document indicates that it becomes uncontrolled upon download or printing, and users are advised to check the NPCC website for the current controlled version.

N-10Reliability Standards of the North American Electric Reliability Corporation 7/5/2010 2 passages
Version History p. p. 171
Version History Version Date Action Change Tracking 0 April 1, 2005 Effective Date New 0 September 16, 2005 Changed references to MOD-013-0 R4 to MOD-013-0 R1 in Applicability, Requirements, and Measures (4 in all). Errata Adopted by NERC...

AI summary This version history outlines changes made to a document, including an effective date and an errata entry that updated references from MOD-013-0 R4 to MOD-013-0 R1. The document was adopted by the NERC Board of Trustees on February 8, 2005.

2.Violation Severity Levels p. p. 117
R 7. Fo i f ie d io d, he t r a s p ec p er Tr iss ion Se ice Pr i de an sm rv ov r f C lcu la d irm E T i h te t ca a no n- w bs lu lue d i f fe ha te t t an a o v a re n n fo ha lcu la d in M 1 4 he t t c te t a r io d, d he bs lu t te s...

AI summary The document discusses violation severity levels, referencing a matter (M14) and outlines different percentages (15% and 25%) associated with measures and capacities, possibly related to transmission service and calculations.

N-18NPCC Response to Information Requests (IR-1 to IR-14) issued by NSPI 2/10/2011 1 passage
Section 10
Response to Nova Scotia Power, Inc. Date of Response: February 10, 2011 - Request IR-14: - At page 4 of NPCC's application to the UARB, NPCC states, "NPCC is filing this notice to - provide the Province of Nova Scotia a description of the...

AI summary Nova Scotia Power, Inc. (NSPI) responds to a request regarding a reference in the Northeast Power Coordinating Council's (NPCC) application to the Utility and Regulatory Board (UARB). NSPI confirms that references to the Province of Nova Scotia in the application are intended to refer to the UARB.

06166Information Requests issued by NSPI to NERC 1/20/2011 1 passage
Date Filed: January 20, 2011 NSPI (NERC) Page 1 of 6
Date Filed: January 20, 2011 NSPI (NERC) Page 1 of 6 1 Request IR-5: 2 3 Please advise as to what role NERC and NPCC each play in other jurisdictions in Canada 4 in enforcement proceedings. 5 6 Request IR-10: 7 8 What role will NERC and NP...

AI summary The document contains several requests related to the roles of NERC and NPCC in enforcement proceedings, NSPI capital applications, compliance obligations, coordination activities among Canadian provinces, and jurisdictional questions involving the New Brunswick System Operator in Nova Scotia.

06167Information Requests issued by NSPI to NPCC 1/20/2011 1 passage
NON-CONFIDENTIAL
NON-CONFIDENTIAL Request IR-11: The New Brunswick System Operator serves as the Reliability Coordinator under various NERC standards. NERC is seeking approval of these standards in Nova Scotia. Is it NPCC's expectation that the UARB would...

AI summary The text outlines four requests (IR-11 to IR-14) concerning NPCC's application to the UARB regarding NERC standards, jurisdiction over the New Brunswick System Operator, and processes for adopting/amending Regional Reliability Criteria. NSPI clarifies that references to the Province of Nova Scotia in NPCC's application should be interpreted as referring to the UARB.

07810Quarterly Application for Approval of Reliability Standards of the North American Electric Reliability Corporation - September 2, 2011 9/6/2011 1 passage
Matrix of Violation Risk Factors for Information p. p. 28
Matrix of Violation Risk Factors for Information S d d Nu b ta n a r m e r Re ire t q m e n u Nu b m e r Te f Re ire t o t q m e n x u V io la io R is k t n Fa to c r C I P- 0 0 2- 3 R 1. 2. T he is k- ba d ha l l c i de he fo l lo in t s...

AI summary The document presents a matrix outlining violation risk factors for information, focusing on a specific case labeled CIP-002-3, referenced as R1.2, and associated with a thematic description involving a bad hall code and assessment on gas assets. The matrix includes a violation risk factor labeled 'MEDIUM'.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →