N-2-bRIRs 1 to 26 - AEC to NSPI - REDACTED (Large File - MB) 1 passage
Dalhousie Legal Aid Service A Community Service of Dalhousie University
d included a proposal for a. Universal Service Program. In support of those submissions, we filed a report by Roger D. Colton that can be found at htto://law.dal.ca/files/ Colton Direct Evidence. pdf. While the Board concluded that the rec...

AI summary Dalhousie Legal Aid Service, supported by evidence from Roger D. Colton, proposed a Universal Service Program to address the unsustainable energy burdens faced by low-income Nova Scotians. The submission highlights that low-income families often must choose between heating and food, leading to dangerous living conditions. While the Board ruled that a 'Rate Assistance Program' was beyond its jurisdiction, it offered to assist in future legislative or rate-making changes regarding low-income consumer assistance.

N-2-cRIRs 1 to 66 - Avon to NSPI - REDACTED (Large File - 13 MB) 1 passage
RESPONSE TO INFORMATION REQUEST
RESPONSE TO INFORMATION REQUEST TO: NSPI FROM: AVON Question IR-11: Please provide all documentation for the Brant Energy RFP process for the sale of NSPI's natural gas for the period April 1, 2006 through March 31, 2007. Response IR-11: T...

AI summary AVON is requesting documentation related to the Brant Energy RFP process for the sale of NSPI's natural gas between April 2006 and March 2007. NSPI responds that the information is confidential and available for viewing at their offices, directing AVON to refer to 'A von IR -11'.

N-16Review of NSPI's Fuel Costs on behalf of Avon Valley Greenhouses et al. (AVON) REDACTED (Large File - 38 MB) 2 passages
(mmBtu)
(mmBtu) 2005 2006 Jan - The state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the state of the sta...

AI summary The text contains a table with data from 2005 to 2006, though most entries are incomplete or consist of repeated phrases. It references several information requests (IR-58, IR-55, IR-49) and is part of a regulatory proceeding document.

Section 69
The Sable Offshore Energy Project (SOEP), which originally was projected to have some 3.5 tcf of natural gas reserves, has seen that reduced to 2.3-2.6 tcf. The Tier I fields, Thebaud, Venture and North Triumph have declined in deliverabil...

AI summary The Sable Offshore Energy Project (SOEP) has experienced a significant decline in natural gas reserves and production, leading to accelerated development of Tier II fields. Despite increased production from these fields, overall production has not improved, and the project has been in decline since 2002. NSPI doubts that the completion of the Sable Compression Platform will resolve the under-production issue.

N-40RIRs Attachment SEB-NSPI - 2d (Large File - 20 MB) 1 passage
TERRITORY
TERRITORY Texas Service Area

AI summary The document section identifies the specific geographic territory for the proceeding, which is the Texas Service Area.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 4 (Large File - 19 MB) 1 passage
Available
Available In all territory served by the Company in the State of Wyoming.

AI summary The provided text is a brief jurisdictional statement indicating that the Company's services and operations are available across all territory served within the State of Wyoming.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 2 (Large File - 15 MB) 2 passages
TERRITORY
TERRITORY Texas Service Area (C)

AI summary The document section identifies the 'Texas Service Area' as the specific geographic territory under consideration for the proceeding.

9.1. APPLICABLE SERVICE AREA
9.1. APPLICABLE SERVICE AREA (AT) In the Distribution Service area allocated by the Arkansas Public Service Commission ("APSC" or the "Commission") to Entergy Arkansas, Inc. ("EAI'' or the "Company"), at any point on Company's existing fac...

AI summary The text defines the applicable service area for the proposed schedule as the Distribution Service area allocated by the Arkansas Public Service Commission to Entergy Arkansas, Inc. It specifies that service can be provided at any point on existing facilities with adequate capacity and voltage. Additionally, it covers customers released to EAI by other utilities with Commission approval and notes that the schedule is subject to the jurisdiction of the Tennessee Regulatory Authority where applicable.

N-40RIRs Attachment SEB-NSPI - 2a, pt. 3 (Large File - 23 MB) 1 passage
APPLICABLE
APPLICABLE In all territory served.

AI summary The provided text is a brief jurisdictional statement indicating that the preceding information or requirements are applicable to all territory served within the jurisdiction.

57968Amended Board Order (and attached Schedules A to C) 2 passages
7 .2.2 Late Application Fee
7 .2.2 Late Application Fee Where an electrical contractor fails to obtain an electrical wiring permit prior to commencing the electrical work, an additional fee shall be payable in the amount of fifty (50) percent of the regular fee, up t...

AI summary A late application fee of 50% of the regular fee, up to a maximum of $100, is imposed on electrical contractors who fail to obtain an electrical wiring permit before starting work.

7 .2.5 Expiry of Permits
7 .2.5 Expiry of Permits A permit for electrical work is valid for 12 months from the date of issue in respect of residential and 24 months in respect of all others unless otherwise noted on the permit. Upon expiry, a renewal fee to a maxi...

AI summary Permits for electrical work have different validity periods: 12 months for residential and 24 months for others. Upon expiry, a renewal fee up to 50% of the original permit cost is required.

57968Amended Board Order (and attached Schedules A to C) 4 passages
a) Regular Permits and Inspections
a) Regular Permits and Inspections All persons, firms or corporations within Nova Scotia Power's inspection authority who are eligible to install electrical installations for the use of electrical energy shall, before commencing or doing a...

AI summary The text outlines requirements for obtaining regular permits and inspections for electrical installations in Nova Scotia. It specifies who must obtain permits, the types of installations requiring permits, and the basis for calculating permit fees. It also mentions procedures for disputes over installation costs.

b) Annual Permits and Inspections
b) Annual Permits and Inspections An annual maintenance permit shall be issued for an establishment to cover all minor repairs as required under sections 4(a) (B), (2) and (3) of the regulations made by the Fire Marshal pursuant to the Ele...

AI summary The document outlines the requirements for annual maintenance permits and inspections under the Electrical Installation Act. It specifies that permits cover minor repairs but not major alterations and mandates at least one inspection per year.

7 .2.2 Late Application Fee
7 .2.2 Late Application Fee Where an electrical contractor fails to obtain an electrical wiring permit prior to commencing the electrical work, an additional fee shall be payable in the amount of fifty (50) percent of the regular fee, up t...

AI summary A late application fee of 50% of the regular fee, up to $100, applies when an electrical contractor starts work without obtaining a wiring permit first. The regulation was approved by Nova Scotia Utility and.

7.2.3 Payment of Fees
7.2.3 Payment of Fees Fees for permits and inspections shall be paid at the time of requesting the permit unless otherwise indicated by the inspection authority. Permits having fees in arrears in excess of 120 days shall be subject to canc...

AI summary This section outlines the requirements for paying fees for permits and inspections, stating that fees must be paid at the time of requesting a permit. Permits with outstanding fees for more than 120 days may be canceled, and the inspection authority may refuse to issue additional permits until the fees are settled.

57974NSPI Compliance Filing 2007 Rate Application - REDACTED (Large File - 36 MB) 4 passages
c) Special Permits and Inspections
c) Special Permits and Inspections Where the fee for a Regular Permit and Inspection are inappropriate the special permit and inspection fee shall apply. (Ex. carnivals and travelling shows).

AI summary The text outlines the application of special permit and inspection fees when regular permit and inspection fees are unsuitable, with examples such as carnivals and travelling shows.

7.2.2 Late Application Fee
7.2.2 Late Application Fee Where an electrical contractor fails to obtain an electrical wiring permit prior to commencing the electrical work, an additional fee shall be payable in the amount of fifty (50) percent of the regular fee, up to...

AI summary A late application fee of 50% of the regular fee, up to a maximum of $100, is imposed on electrical contractors who fail to obtain an electrical wiring permit before starting work.

7.2.3 Payment of Fees
7.2.3 Payment of Fees Fees for permits and inspections shall be paid at the time of requesting the permit unless otherwise indicated by the inspection authority. Permits having fees in arrears in excess of 120 days shall be subject to canc...

AI summary This section outlines the requirements for paying fees for permits and inspections, specifying that fees must be paid at the time of requesting a permit. Permits with outstanding fees exceeding 120 days may be cancelled, and additional permits may not be issued until the outstanding fees are resolved.

7.2.5 Expiry of Permits
7.2.5 Expiry of Permits A permit for electrical work is valid for 12 months from the date of issue in respect of residential and 24 months in respect of all others unless otherwise noted on the permit. Upon expiry, a renewal fee to a maxim...

AI summary Permits for electrical work in Nova Scotia are valid for 12 months for residential and 24 months for other types, with a maximum renewal fee of 50% of the original permit cost upon expiry.

57991Notice of Intervention - Heritage Gas Ltd. 1 passage
Statement of Interest
Statement of Interest - 1. Heritage Gas Limited ("HGL") is a Nova Scotia based company with an office in the City of Dartmouth, in the Province of Nova Scotia. - 2. HGL has been awarded a full regulation class franchise for natural gas dis...

AI summary Heritage Gas Limited (HGL) is a Nova Scotia-based company with a natural gas distribution franchise across several counties. HGL has a direct and substantial interest in the proceeding and intends to monitor and intervene if necessary, reserving the right to participate in all matters related to its interests.

86472Submission - Re: Future Filing Requirements and comments on Board Draft Strawman 1 passage
The Commission FINDS that:
The Commission FINDS that: a. Jurisdiction is pursuant to 1909 PA 106, as amended, MCL 460.551 et seq.; 1919 PA 419, as amended, MCL 460.51 et seq.; 1939 PA 3, as amended, MCL 460.1 et seq.; 1982 PA 304, as amended, MCL 460.6h et seq.; 196...

AI summary The Commission finds that jurisdiction is based on several statutes and rules, and that Detroit Edison and Consumers have complied with the directive to develop a standardized COSS model. They are to use this model in future rate case filings and make it available in electronic format.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →