R-1Notice of Complaint 12 passages
Contact Information p. p. 0
Contact Information Name on account: Roseview Developments Inc. Account number: 2537004-4 Business contact: Michael Rose Account address: Address 1: #3 - 644 Portland Street Suite 149 Address 2: City: Dartmouth Province: NS Postal code: B2...

AI summary Roseview Developments Inc. has submitted a formal complaint regarding delays in the installation of power infrastructure for their Roseview Estates development in Pictou, Nova Scotia. The delays, due to unresolved scope definition and engineering input, are causing significant risks to their build schedule and contractual obligations.

Understood. p. p. 4
Understood. That said, this project has been treated as a serious development from day one on our end. The delays we're experiencing are not due to a lack of effort or compliance, but rather to inconsistent communication and procedural con...

AI summary The speaker emphasizes that delays in the project are due to external communication and procedural issues, not their lack of effort or compliance. They express frustration with inconsistent follow-through and mention that construction standards were not followed, leading to a decision to exit the conversation until further instructions from Tyler.

Hi Chris, p. pp. 4-9
Hi Chris, I appreciate you taking the time to provide updates today, especially while you're home sick. That said, it's important to clarify a few points for the record: - 1. You've confirmed Tyler was unavailable all day due to IT issues...

AI summary The email discusses communication issues between NSP and Roseview Developments regarding power pole installation for Lot 2, with delays and lack of clear communication causing problems. Stefan Mailman informs Roseview Developments that the job has been reassigned to a planner.

For Office Use p. p. 9
For Office Use Submitter's Name: Joseph R. Tracey In the matter of Parcel Identification Number (PID) PID: 65243867 PID: 65243875 Pl D: 65243883 PID: 65243859 PID: 65243891 PID: 65243909 PID: 65243917 PID: 65243925 PID: 65243933 lg] □ □ □...

AI summary The document is a form submission related to land parcel registration, including multiple parcel identification numbers and forms such as Form 24 and Form 8A. It outlines changes to registered interests, benefits, or burdens in the parcel register.

Section 14 p. p. 9
I have searched the judgment roll with respect to this revision of the registered interest and have determined that it is appropriate to add the following judgment(s) or judgment-related documents to the parcel register, in accordance with...

AI summary The text indicates that a review of the judgment roll has been conducted, and it is deemed appropriate to add certain judgment-related documents to the parcel register, in accordance with the Land Registration Act and Land Registration Administration Regulations.

The following benefits are to be added and/or removed in the parcel register(s): p. p. 9
The following benefits are to be added and/or removed in the parcel register(s): Instrument type Easement/ Right of Way Interest holder and type to be removed (if applicable) NIA Interest holder and type to be added (if applicable) Note: i...

AI summary The text outlines the addition and/or removal of specific land interests, including easements and rights of way, associated with parcel numbers 65243958 and 65243941. It includes placeholders for interest holders and mailing addresses, with no burdens noted.

Preamble p. p. 9
The following recorded interests are to be added and/or removed in the parcel register(s): N/A The textual qualifications are to be changed as follows: N/A The following information about the occupier of the parcel, which is owned by the N...

AI summary The text indicates that there are no changes to be made to the parcel register, textual qualifications, or information about the occupier of the parcel owned by the Nova Scotia Farm Loan Board.

SCHEDULE "B" (Benefiting Lands) p. p. 9
SCHEDULE "B" (Benefiting Lands) Lot 25-1 (Pl D 65243867) Lot 25-2 (PIO 65243875)

AI summary Schedule B lists lands that benefit from a particular proceeding, including Lot 25-1 and Lot 25-2 with associated property identifiers.

(Change to existing servient or dominant tenement PIO number in a parcel register as a result of subdivision or consolidation. Note: This form cannot be used to correct an error in a parcel register). p. p. 20
(Change to existing servient or dominant tenement PIO number in a parcel register as a result of subdivision or consolidation. Note: This form cannot be used to correct an error in a parcel register). For Office Use Registration District:...

AI summary This form is used to change the servient or dominant tenement PIO number in a parcel register due to subdivision or consolidation. It cannot be used to correct errors in the parcel register. The form is submitted by Joseph R. Tracey and includes details about the PIO numbers involved and additional forms being submitted simultaneously.

Section 28 p. p. 20
The registered interests and related information are to be changed as follows: NIA The following tenant in common interests that appear in the section of the parcel register(s) labelled "Tenants in Common not registered pursuant to the Lan...

AI summary The text outlines changes to registered interests and parcel registers, including the removal of tenant in common interests and the addition of judgment-related documents, as per the Land Registration Act and related regulations.

Certificate of Legal Effect: p. p. 20
Certificate of Legal Effect: I certify that, in my professional opinion, it is appropriate to make the changes to the parcel register as instructed on this form. Dated at Halifax, in the County of Halifax and Province of Nova Scotia, on th...

AI summary This document is a Grant of Easement between Roseview Developments Inc. as both Grantor and Grantee, granting access rights over specific parcels of land in the Town of Pictou, Nova Scotia. The easement is for normal residential use and will be extinguished if the Grantor Lands become a public road.

SCHEDULE A - (Burdened Lands) p. p. 20
SCHEDULE A - (Burdened Lands) Lot 25-PR1 (PID 65243958) Lot 25-PR2 (Pl D 65243941 )

AI summary Schedule A lists two land parcels (Lot 25-PR1 and Lot 25-PR2) with their respective PID numbers, indicating burdened lands under regulatory consideration.

98233Complainants Correspondence with NSPI 2 passages
\ \ EXTERNAL EMAIL / COURRIEL EXTERNE \ \ p. p. 1
50MB or emails containing high risk attachments like ZIP, EXE or others that could contain viruses. If you have a business need to send such an email, please contact the recipient for instructions. From: Roseview Developments Sent: June 24...

AI summary An email from Roseview Developments to Lisa Wallace and multiple Nova Scotia Power employees regarding a complaint (M12343) about a power connection issue. The email is related to a regulatory proceeding and includes a reference to a specific matter number.

Engineering Drawings & Review Process p. p. 1
Engineering Drawings & Review Process You referenced a need for "proper drawings" that provide a "complete overview" of the subdivision. Please clarify: - What constitutes a complete and acceptable submission? - Is there a formal checklist...

AI summary The text requests clarification on the requirements for engineering drawings in the subdivision review process, including submission standards, formal checklists, review timelines, and coordination with planner meetings.

98234Complainant Submission - Nova Scotia Power Inc. Utility Service Requirements 2023 Edition - Effective May 1, 2023 22 passages
0 Scope p. p. 2
0 Scope This document sets forth the minimum utility requirements for electrical service in the province of Nova Scotia, for all areas served by Nova Scotia Power Incorporated (NSPI). It is not to be regarded as a design specification and...

AI summary This document outlines the minimum electrical service requirements in Nova Scotia for areas served by Nova Scotia Power Incorporated (NSPI). It emphasizes that these requirements supplement, but do not replace, the Canadian Electrical Code and other standards. Construction must be confirmed with relevant authorities.

Complex Structure: p. p. 2
Complex Structure: A complex structure is any structure that would be difficult to supply with a single utility service due to its physical characteristics or electrical requirements. The designation of a structure as 'complex' must be mut...

AI summary A complex structure is defined as one that is difficult to supply with a single utility service due to physical or electrical characteristics. The designation requires mutual agreement between the Supply and Inspection Authorities.

12.8 Utility Supply Conductors Point of Attachment at Building or Structure p. p. 16
The point of attachment for the NSPI supply conductors shall be on the same face of the building as the customer's service entrance or weather-head as required by CE Code Part 3, No.1, clause 5.7.2.2 " The point of attachment for supply co...

AI summary The document specifies the requirements for the point of attachment of NSPI supply conductors, requiring them to be on the same side of the building as the customer's service entrance, with specific vertical and horizontal distance requirements, and an exception for under eave installations.

13.6 Secondary Service Box p. p. 16
13.6 Secondary Service Box - 1) The URD boxes shall be located 1.5 m from the base of the service pole when serving dwellings on the same side of the street as the pole line (refer to drawing 7U-ED-21M). When on the opposite side of the st...

AI summary The document outlines specific requirements for the installation and placement of secondary service boxes (URD boxes) in Nova Scotia, including distances from service poles, property lines, and grade levels, as well as the responsibility of developers to provide ducts and cable placement guidelines.

13.7 Conduit Installation p. p. 16
13.7 Conduit Installation - 1) All ducts and fittings must be CSA approved and installed to NSP Specification. Ducts shall be carefully installed and glued making certain that all joints are tight. Any ingress of materials into the ducts i...

AI summary This section outlines the requirements for conduit installation, including CSA approval, installation specifications, trench construction, duct placement, and backfilling procedures. Specific drawings and standards are referenced to ensure compliance with NSP specifications.

14.10 Fire-Resisting Barriers p. p. 30
14.10 Fire-Resisting Barriers Fire-resisting barriers must be constructed between the transformer and the door, window, ventilation opening or combustible surface when required by Section 14.5. For details on the construction of these barr...

AI summary Fire-resisting barriers are required between the transformer and combustible surfaces as specified in Section 14.5. Details on barrier construction are referenced in multiple documents, and disputes are resolved by the local Inspection Authority in conjunction with the Supply Authority.

NOTES: p. pp. 57-61
NOTES: - A. REFER TO DWG. NO. IU-ED-44M FOR ROADWAY/DRIVEWAY REQUIREMENTS. MAY BE REDUCED TO 600 mm IF VOLTAGE DOES NOT EXCEED 750 VOLTS PHASE TO PHASE. - B. ALL CROSSINGS SHALL BE AT RIGHT ANGLES WITH A MINIMUM CLEARANCE OF 600 mm. - C. T...

AI summary The text outlines technical specifications for electrical installations, including requirements for duct placement, concrete cover, clearance distances, and backfill materials. It references standards and guidelines for installation practices and includes notes on drawings and approvals.

Preamble p. pp. 68-128
- A. MINIMUM COVER REQUIREMENTS FOR DIRECT BURIED CONDUIT IN VEHICULAR AREAS IS 1000mm. - B. FOR BONDING OF CABLE GUARDS. REFER TO DWG. NO. 10U-ED-12M. - C. NATIVE BACKFILL MATERIAL SHALL NOT CONTAIN ROCKS OVER 50mm IN DIAMETER FOR THE FIR...

AI summary The text outlines technical specifications and requirements for the installation of direct buried conduit and related components in vehicular areas, including minimum cover requirements, backfill material specifications, conduit cleaning and protection, and inspection protocols by NSPI representatives.

CONCRETE PAD FOR THREE-PHASE PADMOUNT TRANSFORMER 150 kVA - 500 kVA p. pp. 74-75
CONCRETE PAD FOR THREE-PHASE PADMOUNT TRANSFORMER 150 kVA - 500 kVA DATE: 2008-09-15 REV DATE: 2016-04-11 DRAWN: H. V. HUYNH STD NO: 6U-ED-20M APPROVED: Jinhaya SHEET: 1 of 1 (R1)

AI summary This document is a technical drawing for a concrete pad designed to support a three-phase padmount transformer with capacities ranging from 150 kVA to 500 kVA. The drawing was created by H. V. Huynh and approved by Jinhaya, with the latest revision dated April 11, 2016.

NOTES p. p. 91
NOTES - 1. CARE SHOULD BE TAKEN IF DRIVING GROUND ROD, NOT TO HIT UNDERGROUND CABLE, GROUND PLATE IS RECOMMENDED. 2. STRUCTURE IS TO BE SECURELY ASSEMBLED TO ASSURE RIGIDITY & - MOUNTED ON LEVEL GROUND. 3. CONDUIT TO BE SECURELY FASTENED T...

AI summary The text provides installation guidelines for electrical structures, emphasizing safety and proper placement to avoid interference with underground cables, pedestrian areas, and fire hydrants. It also highlights the need for secure assembly, labeling of temporary wires, and ensuring access to the URD box.

NSPI & BELL CANADA JOINT-USE DISTRIBUTION STANDARDS p. pp. 95-96
NSPI & BELL CANADA JOINT-USE DISTRIBUTION STANDARDS JOINT USE DUCT TERMINATION FOR UNDERGROUND PRIMARY SERVICE (MORE THAN 750 VOLTS) Jim For NSPI; JIM MCFADGEN, P.ENG FOR BELL; STEPHEN CUMMINGER, P.ENG REV DATE: 2021-12-13 STD NO: J-ED-14M...

AI summary This document outlines the joint-use distribution standards for underground primary service duct termination between NSPI and Bell Canada, detailing specifications such as burial depth, duct sizing, bonding requirements, and installation procedures.

NSPI & BELL CANADA JOINT-USE DISTRIBUTION STANDARDS p. pp. 100-107
NSPI & BELL CANADA JOINT-USE DISTRIBUTION STANDARDS JOINT-USE CLEARANCES AT SERVICE ATTACHMENTS TERMINATED ON SINGLE FAMILY DWELLINGS DRAWN: M.HALASZ REV DATE: 2021-12-13 STD NO: J-ED-24M STEPHEN CUMMINGER, P.ENG DRAWN: M.HALASZ REV DATE:...

AI summary The document outlines joint-use distribution standards for NSPI and Bell Canada at service attachments on single-family dwellings, with details on clearances, drawn by M. Halasz and revised on December 13, 2021, under standard number J-ED-24M.

NSPI & BELL CANADA JOINT-USE DISTRIBUTION STANDARDS p. pp. 101-102
NSPI & BELL CANADA JOINT-USE DISTRIBUTION STANDARDS JOINT USE DUCT TERMINATION FOR UNDERGROUND SECONDARY SERVICES (750 VOLTS OR LESS) FOR NSPI; JIM MCFADGEN, P.ENG FOR BELL; STEPHEN CUMMINGER, P.ENG REV DATE: 2022-03-11 STD NO: J-ED-25M M....

AI summary This document outlines joint-use distribution standards for underground secondary services (750 volts or less) between NSPI and Bell Canada. It specifies requirements for conduit installation, bonding, grounding, and other technical details.

NSPI & BELL CANADA JOINT-USE DISTRIBUTION STANDARDS p. pp. 102-103
NSPI & BELL CANADA JOINT-USE DISTRIBUTION STANDARDS JOINT USE DUCT TERMINATION FOR UNDERGROUND SECONDARY SERVICES (750 VOLTS OR LESS) DRAWN: M.HALASZ REV DATE: 2022-03-11 STD NO: J-ED-25M STEPHEN CUMMINGER, P.ENG DRAWN: M.HALASZ REV DATE:...

AI summary This document outlines joint-use distribution standards for underground secondary services (750 volts or less) between NSPI and Bell Canada, including specifications for duct termination, materials, and installation requirements.

STANDARDS NSPI & BELL CANADA JOINT-USE DISTRIBUTION p. pp. 103-104
STANDARDS NSPI & BELL CANADA JOINT-USE DISTRIBUTION JOINT-USE UNDERGROUND SERVICE POLE in the Folger P. Ety. FOR NSPI; JIM MCFADGEN, P.ENG FOR BELL; STEPHEN CUMMINGER, P.ENG DRAWN: M.HALASZ REV DATE: 2021-12-13 J-ED-34M STD NO: SHT: 1 OF

AI summary This document outlines a joint-use underground service pole standard between NSPI and Bell Canada, with engineering professionals involved in the process. The standard was last revised on December 13, 2021, and includes a drawing reference.

NSPI & BELL CANADA JOINT-USE DISTRIBUTION STANDARDS p. pp. 107-108
NSPI & BELL CANADA JOINT-USE DISTRIBUTION STANDARDS DECORATIVE ATTACHMENT POLE HANGING FLOWER BASKET ON JOINT USE POLE in the Fady P. Etg. FOR BELL; STEPHEN CUMMINGER, P.ENG DRAWN: M.HALASZ REV DATE: 2021-12-13 J-ED-37M STD NO: SHT: 2 OF F...

AI summary The document outlines specific standards for the installation of decorative attachment poles on joint-use distribution poles shared by NSPI and Bell Canada. Key considerations include minimum clearance from roadways, curbs, and sidewalks, as well as the required height of the attachment above the ground.

NSPI & BELL CANADA JOINT-USE DISTRIBUTION STANDARDS p. pp. 108-109
NSPI & BELL CANADA JOINT-USE DISTRIBUTION STANDARDS DECORATIVE ATTACHMENT POLE HANGING CLEARANCES ON JOINT USE POLE DRAWN: M.HALASZ in the Folger P. Ety. FOR NSPI; JIM MCFADGEN, P.ENG FOR BELL; STEPHEN CUMMINGER, P.ENG REV DATE: 2021-12-13...

AI summary The document outlines joint-use distribution standards for NSPI and Bell Canada, including specifications for duct installation, cable guard placement, and other technical requirements for pole-mounted infrastructure.

NOTES: p. p. 115
NOTES: - A. THE CUSTOMER SHALL BE RESPONSIBLE FOR INSTALLING THE SERVICE BRACKET AND MAST IN A LOCATION SATISFACTORY TO BOTH THE INSPECTION DEPT. AND THE SUPPLY AUTHORITY. AND ENSURING THE ATTACHMENT SHALL BE SUPPLIED BY NSPI. - B. MATERIA...

AI summary This document outlines technical installation requirements for service attachments, including responsibilities for installation, material specifications, and dimensional guidelines for service brackets, masts, and conductors. It references specific charts and sections for further details.

CUSTOMER'S MATERIAL p. pp. 118-119
CUSTOMER'S MATERIAL - 1. SERVICE HEAD. - 2. SERVICE ENTRANCE CONDUCTOR. INSULATED. - 3. CONDUIT. - 4. SERVICE MAST CLAMPS. - 5. SOCKET METER BASE. - 6. SERVICE ENTRANCE SWITCH RATED NEMA3 - 7. GROUND ROD IN ACCORDANCE WITH CANADIAN ELECTRI...

AI summary The document outlines detailed specifications for electrical service installation, including components such as service entrance conductors, conduit, grounding rods, and supporting structures. It provides a list of materials and requirements for installation, ensuring compliance with the Canadian Electrical Code.

PARALLEL SERVICE CONNECTION AT THE SERVICE ENTRANCE TRIPLEX OR QUADRUPLEX p. pp. 123-124
PARALLEL SERVICE CONNECTION AT THE SERVICE ENTRANCE TRIPLEX OR QUADRUPLEX DATE: 2008-08-14 REV DATE: 202 22-02 -16 5 DRAWN: M. HAL ASZ STD NO: SS- -ED-2 6 M APPROVED: J.A.MCFADGEN SHT NO: 1 OF 1 (R2)

AI summary This document provides technical specifications for parallel service connections at the service entrance for triplex or quadruplex installations, including revision dates and approval information.

CLEARANCES TO ABOVE GROUND PROPANE AND NATURAL GAS EQUIPMENT p. pp. 131-132
CLEARANCES TO ABOVE GROUND PROPANE AND NATURAL GAS EQUIPMENT DATE: 2022-05-20 REV DATE: DRAWN: M. HALASZ STD NO: V-E D-14 М APPROVED: SHT NO: 1 OF 2

AI summary The document provides technical specifications and clearance requirements for above ground propane and natural gas equipment, dated May 20, 2022. It includes drawing details, standards, and sheet numbers, referencing a specific image for visual context.

CLEARANCE TO ABOVE GROUND PROPANE OR NATURAL GAS EQUIPMENT p. p. 132
CLEARANCE TO ABOVE GROUND PROPANE OR NATURAL GAS EQUIPMENT DATE: 2022-05-20 REV DATE: 500 Compressed 1 - ALS23 YA34A7 LAA500-12-2 IACL-500 FULA-050-S VAUL-500-12 112030 • 2IACL-500 500 Compressed 2 40166 ALS24 YA34A3 SAB500-N LAB500-12-2 V...

AI summary The document provides a table with technical specifications and codes related to propane and natural gas equipment clearance above ground. It includes various models, part numbers, and associated identifiers, likely for regulatory or compliance purposes.

98235Complainant Filing - Form 24 Easement Benefit Form / Easement Burden 10 passages
(Instrument code: 450) p. p. 9
(Instrument code: 450) (If change requested relates to one or more of the following and no other interests are being added or removed on this form: manner of tenure, description of manner of tenure, non-resident status, parcel access or NS...

AI summary This document outlines the conditions under which changes can be requested for specific land-related details, such as tenure, parcel access, and NSFLB occupant status, but clarifies that it is not intended for correcting errors in parcel registers.

For Office Use p. p. 9
For Office Use Submitter's Name: Joseph R. Tracey In the matter of Parcel Identification Number (PID) PID: 65243867 PID: 65243875 Pl D: 65243883 PID: 65243859 PID: 65243891 PID: 65243909 PID: 65243917 PID: 65243925 PID: 65243933 lg] □ □ □...

AI summary This document is a submission related to land parcel registration, including forms and updates to registered interests, benefits, or burdens. It includes a power of attorney statement and multiple parcel identification numbers.

CANADA PROVINCE OF NOVA SCOTIA p. p. 9
CANADA PROVINCE OF NOVA SCOTIA - I. Michael Rose, of Pictou, Province of Nova Scotia, make oath and say that: - 1. I am the President of ROSEVIEW DEVELOPMENTS INC. the "Corporation" and have a personal knowledge of the matters herein depos...

AI summary This affidavit is made by I. Michael Rose, President of ROSEVIEW DEVELOPMENTS INC., confirming his authority to act on behalf of the Corporation and acknowledging the execution of an instrument. The document is sworn in Halifax, Nova Scotia, before Joseph R. Tracey, a barrister.

SCHEDULE A - (Burdened Lands) p. p. 9
SCHEDULE A - (Burdened Lands) Lot 25-PR 1 (Pl D 65243958) Lot 25-PR2 (PID 65243941)

AI summary Schedule A lists burdened lands with specific lot numbers and parcel identification numbers (PIDs) associated with each lot.

(Instrument code: 450) p. p. 9
(Instrument code: 450) (If change requested relates to one or more of the following and no other interests are being added or removed on this form: manner of tenure, description of manner of tenure, non-resident status, parcel access or NS...

AI summary This document outlines the conditions under which changes can be requested for specific land-related details, such as tenure, parcel access, and NSFLB occupant status, but clarifies that it is not intended for correcting errors in parcel registers.

(Change to existing servient or dominant tenement PIO number in a parcel register as a result of subdivision or consolidation. Note: This form cannot be used to correct an error in a parcel register). p. p. 9
(Change to existing servient or dominant tenement PIO number in a parcel register as a result of subdivision or consolidation. Note: This form cannot be used to correct an error in a parcel register). For Office Use Registration District:...

AI summary This document outlines a form submission to change the servient or dominant tenement PIO number in a parcel register due to subdivision or consolidation. It includes submitter details, PIO numbers, and form-related information.

Section 21 p. p. 9
The registered interests and related information are to be changed as follows: NIA The following tenant in common interests that appear in the section of the parcel register(s) labelled "Tenants in Common not registered pursuant to the Lan...

AI summary The text outlines changes to registered interests and related information, including the removal of tenant in common interests and the addition of judgment-related documents to the parcel register, in accordance with the Land Registration Act and Land Registration Administration Regulations.

Preamble p. p. 9
The following recorded interests are to be added and/or removed in the parcel register(s): N/A The textual qualifications are to be changed as follows: N/A The following information about the occupier of the parcel, which is owned by the N...

AI summary The document outlines changes to be made to the parcel register and textual qualifications, but specifies that no changes are to be made. It also notes that information about the occupier of a parcel owned by the Nova Scotia Farm Loan Board is to remain unchanged.

CANADA PROVINCE OF NOVA SCOTIA p. p. 9
CANADA PROVINCE OF NOVA SCOTIA - I. Michael Rose, of Pictou. Province of Nova Scotia, make oath and say that: - 1. I am the President of ROSEVIEW DEVELOPMENTS INC. the "Corporation" and have a personal knowledge of the matters herein depos...

AI summary The document is an affidavit sworn by Michael Rose, President of Roseview Developments Inc., stating his authority to act on behalf of the Corporation and confirming the Corporation's residency in Canada and the nature of share ownership. The affidavit is part of a legal process in Nova Scotia.

SCHEDULE "B" (Benefiting Lands) p. p. 9
SCHEDULE "B" (Benefiting Lands) Lot 25-1 (PIO 65243867) Lot 25-2 (PIO 65243875)

AI summary Schedule B lists parcels of land benefiting from the proceeding, including Lot 25-1 and Lot 25-2 with their respective Parcel Identification Numbers (PIO).

98237Complainant Filing - Roseview PID Separation - Phase 1A 1 passage
Form 28 Purpose: to record certain types of non-enabling documents in a parcel register p. p. 0
Submitter's name: Roland Burek as shown her as shown here. Registrar

AI summary The document is a Form 28 submission by Roland Burek, used to record non-enabling documents in a parcel register, with the Registrar's acknowledgment.

98239Complainant Filing - 2025.02.26 - 2024-0061 Rev 1-ISO A1 1 passage
Section 3 p. p. 0
ALL SANITARY, STORM, GRADING, AND DRAINAGE FEATURES, SHALL BE IN ACCORDANCE WITH LOCAL - MUNICIPAL STANDARDS, NOVA SCOTIA ENVIRONMENT (NSE) STANDARDS, AND NOVA SCOTIA DEPARTMENT OF PUBLIC WORKS (NSDPW) STANDARDS, AND MUST MEET ALL APPLICAB...

AI summary The text outlines requirements for sanitary, storm, grading, and drainage features in accordance with local municipal, NSE, and NSDPW standards, including setbacks and variance procedures. It also specifies that water-related design is not included in the plan and clarifies New Pipers' responsibilities and limitations regarding water usage and sewer lateral design.

98240Complainants Filing - Survey 21 passages
Section 6
LOT "25-9" AREA 521.9sq.m. (0.129ac.} LOT "4" LJl,.NDS OF BRADLEY JOSEPH BONAPARTE REMAINDER LOT "25-R" & JANICE MARIE MATHESON REMAINING LANDS OF DOCUMENT 105805791 ROSEVIEW DEVELOPMENTS INC,

AI summary The text contains land lot information, including details about property owners and land area measurements, related to a legal or regulatory proceeding in Nova Scotia.

Section 8
@ DH 0 DRILL HOLE, CALCULATED POINT LOT "25-8" DWP 8 NSHPN WOOD POST, NOVA SCOTIA HIGH PRECISION NETWORK AREA 521.9sq.m, (0.129ac.) (Pl) (Fd) (d) (c) (Wit) PLACED, FOUND, DEED NOTATION. CALCULATED, WITNESS

AI summary The text describes a land survey detail for Lot '25-8' with specific measurements and references to a wood post in the Nova Scotia High Precision Network. It includes area, coordinates, and notes on placement and documentation.

Section 11
NSLS ID NOVA SCOTIA LAND SURVEYOR, IDENTIFICATION UP OHWM UTILITY POLE, ORDINARY HIGH WATER MARK LOT "25-7" AREA 521.9sq.m. (0, 129ac.) NTS FNE NOT TO SCALE, FOUND NO EVIDENCE

AI summary The text provides a land surveyor identification for a property, including details such as the lot number, area, and notes about the utility pole and ordinary high water mark. It also includes information about the land surveyor and a note indicating that no evidence was found.

Section 12
NTS FNE NOT TO SCALE, FOUND NO EVIDENCE l)SM BOUNDARY (DEALT WITH), BOUNDARY (OTHER) ~ TIE LINE, FENCE LOT "25-6" AREA 521.9sq.m. (0.129ac.)

AI summary The text provides a map or survey detail indicating a land area of 521.9 square meters (0.129 acres) labeled as Lot '25-6'. It includes notes such as 'NOT TO SCALE, FOUND NO EVIDENCE' and mentions boundary and tie line information.

Section 13
AREA 521.9sq.m. (0.129ac.) COORDINATE SYSTEM INFORMATION GNSS SURVEY TYPE: NRTK SOURCE; CAN-NET

AI summary The text provides geographical and surveying information, including the area of a property and details about the coordinate system used for a GNSS survey.

Section 15
HORIZONTAL DATUM: NAD83 (CSRS) EPOCH: 2010.0 I VELOCITY MODEL: Ver. 6 VERTICAL DATUM: CGVD201.3 REFERENCE MONUMENT: NSHPN 206509 LOT "25-5" ... , AREA 521.9sq.m. (0.129ac.) PROJECTION: Y MTM I ZONE: 4 N 5,060,870.768m I E 24,405,924.043m ....

AI summary The text provides geographic and surveying data related to a land parcel, including horizontal and vertical datums, coordinates, and area measurements. It includes technical details such as the epoch, velocity model, and projection zone.

Section 16
24.043m .·:::., - -.- .. :1 l)SM CENTRAL MERIDIAN: 61"30'W ELEV. 47.323m I ADJUSTMENT ID: NSHPN2016CDJB ·.:-:.:.:.·1 COMBINED SCALE FACTOR: 1.000004 VALUES: GRID (METRIC) UNADJUSTED FIELD SURVEY WAS CARRIED OUT ON MARCH 3, 2025

AI summary The text provides a geographic and survey-related data entry, including coordinates, elevation, and survey details conducted on March 3, 2025. It includes information about the central meridian, adjustment ID, and scale factor, indicating a topographic or land survey context.

Section 20
LANDS OF BRADLEY JOSEPH BONAPARTE & JANICE MARIE BONAPARTE \ DOCUMENT 122754006 \ REGISTRY PLAN 33.36 (1990} (Fd)SM LOT "25-3" PID 00980847 NSLS 435 •

AI summary The document refers to a land registry entry for Bradley Joseph Bonaparte and Janice Marie Bonaparte, with details including the registry plan, lot number, and PID. It includes a reference to a land surveyor and a registry plan number.

Section 21
NSLS 435 • AREA 1,043.Ssq.m. (0.258ac.) ~(Fd)~M NSLS 662

AI summary The text contains land surveyor numbers (NSLS 435 and NSLS 662) and a land area measurement (1,043.5 sq.m. or 0.258 acres). No further details or context are provided in the text.

Section 23
PLAN OF SUBDIVISION (Fd)SM • NSLS 435 LOTS "25-1" TO "25-9" "25-2" AREA 654.4sq.m.

AI summary The text presents a plan of subdivision, specifically Lot '25-1' to '25-9' with a total area of 654.4 square meters, identified by the Nova Scotia Land Surveyor (NSLS) number 435.

Section 25
(0.162ac.) \ NSLS 435 ', '\ ROSEVIEW DEVELOPMENTS INC. New Pole Location \

AI summary The document snippet includes a land survey reference (NSLS 435) and a company name (Roseview Developments Inc.) along with a note about a new pole location. No substantive regulatory or technical discussion is present in the text.

Section 26
\ BEECHES ROAD, TOWN OF PICTOU, PICTOU COUNTY, NOVA SCOTIA LOT "38" l.JINDS OF CARMEN GODFREY & BRENTON GODFREY WILL DOCUMENT 124465379 DEED DOCUMENT 5812 (2001) REGISTRY PLAN 5575 (2001) PJD 65086738 LOT "25-1"

AI summary The text contains land survey and property registration details for Lot '38' and Lot '25-1' in the Town of Pictou, Pictou County, Nova Scotia, involving Carmen Godfrey and Brenton Godfrey. It includes document numbers, registry plan numbers, and other legal identifiers related to property ownership.

Section 29
, I, DARREN TREVORS , NOVA SCOTIA LAND SURVEYOR, HERESY BLAISE RONALD MACNEILL ~ '', & KAREN ANNE MACNEILL DC'.;CUMENT 7661 (1996) Consideration for \ CERTIFY THAT THE SURVEY REPRESENTED

AI summary This document is a certification by Darren Trevors, a Nova Scotia Land Surveyor, and Blaise Ronald MacNeill and Karen Anne MacNeill regarding a survey conducted in 1996. It confirms the accuracy and validity of the survey work performed.

Section 31
BY THIS PLAN, WAS CONDUCTED REGISTRY Pc.AN 5242 (1999) .t:!QIES.;_ PID C0864546 2nd Pole ' ACCORDANCE WITH THE LAND SURVEYORS ACT, REGULATIONS AND STANDARDS MADE THEREUNDER .

AI summary This document is a land survey registry entry, referencing a plan conducted in accordance with the Land Surveyors Act, regulations, and standards made thereunder. It includes a PID number and mentions a '2nd Pole'.

Section 32
MADE THEREUNDER . 1) LOTS "25-1" TO "25-9", LOT "25-PR1" (MICHAELA STREET), LOT DATED THIS 5th DAY OF MARCH, 2025 CL~NSLS. "25-PR2" (SAMUEL STREET) & REMAINDER LOT "25-R" ORIGINATE WITH THIS PLAN AND ARE PORTIONS OF LOT "X" (PORTION OF), L...

AI summary The document outlines the creation of several lots, including '25-1' to '25-9', '25-PR1' (Michaela Street), '25-PR2' (Samuel Street), and the remainder of '25-R', which are portions of Lot 'X' in Roseview. The lots originate from a plan drawn by A.C.M. and are described in registry documents and plans.

Section 33
DRAWN BY: A.C.M. DEVELOPMENTS INC. AS DESCRIBED IN REGISTRY DOCUMENT 121282850 AND SHOWN ON REGISTRY PLANS 5242 (1999), 220.3 (1985) & 1718 (1983).

AI summary The text provides information about a surveyor's drawing by A.C.M. DEVELOPMENTS INC., referencing registry documents and plans from various years, indicating land survey and mapping activities in Nova Scotia.

Section 34
2) THE ONLY BOUNDARIES SHOWN ON THIS PLAN WHICH HAVE BEEN SURVEYED ARE THE BOUNDARIES OF LOTS "25-1" TO "25-9", LOT S- C) OF NOVA SCOTIA "25-PR1" (MICHAELA STREET) & LOT "25-PR2" (SAMUEL STREET). THE . ·-. ID REMAINING BOUNDARIES OF REMAIN...

AI summary The text specifies that only certain lot boundaries on the plan have been surveyed, including lots 25-1 to 25-9, 25-PR1 (Michaela Street), and 25-PR2 (Samuel Street), while the remaining boundaries of remainder lot 25-R are not surveyed.

Section 37
~ 'I REGISTRY PLANS 5242 (1999), 2203 (1985) & 1718 (1983). C

AI summary The text references several registry plans from different years, indicating historical land survey and mapping documentation in Nova Scotia.

Section 41
TS "25-1" TO "25-9" & LOT "25-PR1" (MICHAELA STREET) FROM SEA BIRCH DRIVE OVER LOT "25-PR2" (SAMUEL STREET). LOTS "25-PR1" & "25-PR2" ARE TO BE CONVEYED TO zOm((l N -0 77266 THE TOWN OF PICTOU AND DESIGNATED AS PUBLJC ROADS AT A FUTURE <:...

AI summary The text outlines the conveyance of specific land parcels ('25-PR1' and '25-PR2') to the Town of Pictou for designation as public roads at a future date. It also states that watercourses are owned by the Province of Nova Scotia under Section 103 of the Environment Act 1994-95.

Section 42
<: • DATE. 4) WATERCOURSES ARE OWNED BY THE PROVINCE OF NOVA SCOTIA AS PER SECTION 103 OF THE PROVINCE OF NOVA SCOTIA ENVIRONMENT ACT 1994-95. c. 1. 5) WETLANDS MAY EXIST ON THE LAND SHOWN HEREON AND ARE SUBJECT .I -1' NSHPN 206509 f y ' '...

AI summary This document text references legal ownership of watercourses in Nova Scotia under the Province of Nova Scotia Environment Act 1994-95, c. 1, and mentions the potential presence of wetlands on the land, along with a hydrographic and topographic survey number.

Section 43
PLAN NUMBER TO INTERPRETATION AND IDENTIFICATION BY A QUALIFIED WETLAND DELINEATOR. N 5,060,870.768 E 24,4C5,S24.04.3 \ s 2025-015 6) LOTS "25-1" TO "25-9" ARE TO BE SERVICED BY MUNICIPAL SEWER AND WATER. \ SURVEYING LTD, (902j 382-2152 su...

AI summary The text includes a plan number and coordinates related to wetland delineation, as well as information about municipal sewer and water services for specific lots. It also includes contact information for a surveying company.

98330Correspondence between Utility, Town, Complainant and the Board re Install of Power Pole 1 passage
Section 1
From: Roseview Developments Sent: June 30, 2025 3:07 PM To: Iain MacIsaac Cc: Wallace, Lisa ; Blake Williams ; Chris Lanteigne ; Jennifer Ross ; June Karanja ; Kathleen Murray ; Krysta Russell ; Grant Fraser ; Tara Cranston ; Lisa Forsey ;...

AI summary This email exchange discusses the status of a power connection request by Roseview Developments, with the Town of Pictou and Nova Scotia Power. The Town of Pictou has completed its scope, and Roseview Developments is awaiting a schedule from Nova Scotia Power for the installation of a power pole.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →