Matter: Nova Scotia Power Inc. - CI C0061005 – POA Cell Capping 2025 – $2,530,405
5 passages 1 document

Jurisdictional Questions across all matters →

N-2NSPI (NSEB) RIRs 1-11 5 passages
Groundwater Sampling Requirements - Plant Site p. p. 3
Groundwater Sampling Requirements - Plant Site Sampling Requirements Sampling Frequency Well Identifier General Chemistry (RCAp), Dissolved Metals, Petroleum Hydrocarbons (BTEX/TPH) Annual PA1, PA4, PA5, PA13, PA14, PA15 Total Dissolved So...

AI summary The document outlines groundwater sampling requirements for the Plant Site, specifying different parameters, frequencies, and well identifiers. Parameters include general chemistry, dissolved metals, and water level measurements, with varying sampling frequencies such as annual, quarterly, and daily.

Groundwater Sampling Requirements - Residue Management Site p. p. 3
Groundwater Sampling Requirements - Residue Management Site Sampling Requirements Sampling Frequency Well Identifier PN6A/97, PN7A/92, PN7B/92, PN8B/97, PN18A, PN18B, PN18C, PN28A, PN28B, PN30A, General Chemistry (RCAp), Dissolved Metals Q...

AI summary The document outlines groundwater sampling requirements at the Residue Management Site, specifying different sampling frequencies and well identifiers for various parameters such as General Chemistry, Dissolved Metals, and Water Level. These requirements ensure proper monitoring and compliance with environmental standards.

Job Safety Plan p. p. 3
Job Safety Plan The Job Safety Plan is a blue print for construction activity and will assist the constructor in scheduling, purchasing and supervising the construction. The steps normally include: - 1. Develop controls to mitigate each of...

AI summary The Job Safety Plan outlines steps for mitigating hazards during construction, including engineering, administrative, and personal protective equipment controls. It also requires writing detailed plans for the overall job and sub-tasks, and including an emergency response plan.

Section 371 p. pp. 154-156
Water for residue conditioning at the plant site silos will come from plant process water supply and could also potentially come from the coal pile runoff pond (CPRP), WWTP Basin A and Basin B. Water for completion of hydration of dust con...

AI summary The document discusses the sources of water used for residue conditioning and landfilling activities at the Point Aconi CFB site, including process water, coal pile runoff ponds, and specific ponds for landfill operations. It also mentions the regulation of freshwater withdrawal from the well field supply.

The quality objectives for discharged water that must be met include the limits on specific parameters as outlined in the current operating approval. These objectives are listed in Table 4. p. p. 156
The quality objectives for discharged water that must be met include the limits on specific parameters as outlined in the current operating approval. These objectives are listed in Table 4. Table 4: Water Quality Parameters Water Quality P...

AI summary The document outlines water quality objectives for discharged water, specifying limits on various parameters such as pH, iron, chromium, copper, nickel, zinc, suspended solids, and oil and grease. These objectives are part of the current operating approval and will be monitored at the CW outfall.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →