Matter: Town of Mahone Bay Electric Utility - Edgewater Project $2,650,000
5 passages 2 documents

Jurisdictional Questions across all matters →

M-2-(i)Project Drawings 4 passages
ASPHALT (PR.)
ASPHALT (PR.) 6 ISSUED FOR CONSTRUCTION REV.03 NOV 14/25 JAB 5 ISSUED FOR SI-10 SEP 12/25 JAB 4 ISSUED FOR CONSTRUCTION REV.02 AUG 22/25 JAB 3 ISSUED FOR CONSTRUCTION REV. 01 APR 01/25 JAB 2 ISSUED FOR SI-01 MAR 28/25 JAB 1 ISSUED FOR CONS...

AI summary The document lists various asphalt-related items issued for construction and tender by the Town of Mahone Bay, including dates and revisions. It appears to be a procurement or construction schedule.

UP → UTILITY POLE (PR.) TITITITITITITITITITITITITITITITITITITI BOTTOM OF SLOPE (PR.)
UP → UTILITY POLE (PR.) TITITITITITITITITITITITITITITITITITITI BOTTOM OF SLOPE (PR.) 7 ISSUED FOR CONSTRUCTION REV.03 NOV 14/25 JAB 6 ISSUED FOR CONSTRUCTION REV.02 AUG 22/25 JAB 5 ISSUED FOR SI-04 APR 21/25 JAB 4 ISSUED FOR SI-03 APR 15/2...

AI summary The document provides a table of issued permits related to utility pole construction and modifications in the Town of Mahone Bay, including dates and responsible parties.

UTILITY:
UTILITY: THE POWER UTILITY HAVING JURISDICTION OF THE PROJECT AREA IS THE TOWN OF MAHONE BAY AND RIVERPORT LIGHT COMMISSION. ALL POWER SYSTEM DESIGN AND INSTALLATION WILL REQUIRE REVIEW, INSPECTION, AND APPROVAL FROM THE COMMISSION AUTHORI...

AI summary The Town of Mahone Bay and Riverport Light Commission has jurisdiction over the project area. All power system design, installation, and service connection requirements must be reviewed, inspected, and approved by the Commission Authority, coordinated by the contractor.

2. GENERAL STANDARDS:
2. GENERAL STANDARDS: - 2.1. C22.2 No. 41-13 (R2017) GROUNDING AND BONDING EQUIPMENT - 2.2. CAN/CSA-C22.2 No. 198.2-15 SEALED WIRE CONNECTOR SYSTEMS - 3. ALL CONCRETE WORK TO CONFORM TO CSA A23.1-14/A23.2-14 AND TO CSA A23.3-19. REINFORCIN...

AI summary The document outlines technical standards and specifications for electrical and construction work, referencing multiple CSA and C22.2 standards related to grounding, bonding, concrete, line construction, and materials used in utility infrastructure.

M-2-(iii)Tender Forms Received (Redacted) 1 passage
Addendum No. 2
Addendum No. 2 C-002 EXISTING AND PROPOSED CONDITIONS PLAN SHEET 2 O C-003 EXISTING AND PROPOSED CONDITIONS PLAN SHEET 3 O C-004 EXISTING AND PROPOSED CONDITIONS PLAN SHEET 4 O C-005 EXISTING AND PROPOSED CONDITIONS PLAN SHEET 5 O C-006 EX...

AI summary The document contains a list of plan sheets and site sections related to a construction or infrastructure project, including details about existing and proposed conditions, underground utilities, and site planning. The content appears to be technical and related to municipal servicing and engineering.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →