Topic/Matter Intersection

Topic:"Jurisdictional Questions" in M13110

Matter: Town of Lunenburg Electric Utility (TOLEU) - Wire Permit and Inspection Fees
2 passages 1 document

Jurisdictional Questions across all matters →

L-1Application 2 passages
6.10 REGULAR PERMIT AND INSPECTION
6.10 REGULAR PERMIT AND INSPECTION The fee for a Regular Permit, and the maximum number of inspection visits, with respect to an installation will be calculated as follows:

AI summary This section outlines the calculation method for the fee of a Regular Permit and the maximum number of inspection visits for an installation.

6.11 REGULAR PERMIT AND INSPECTION
6.11 REGULAR PERMIT AND INSPECTION The fee for a Regular Permit and the maximum number of inspection visits, with respect to an installation will be calculated as follows:

AI summary This section outlines the method for calculating the fee for a Regular Permit and the maximum number of inspection visits for an installation.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →