HomeLegal CostsM03413Evidence
Topic/Matter Intersection

Topic:"Legal Costs" in M03413

Matter: CI# 39323; CI# 39626; CI# 39627; & CI# 39628 - P-128.10 - NSPI WO - (Digby Wind Project) Application for approval of capital work orders  in the amount of $82.8 million for the acquisition, construction and interconnection of the Digby Wind Farm Project
10 passages 4 documents

Legal Costs across all matters →

N-1Application 3 passages
ARTICLE 9 INDEMNITY p. p. 62
ARTICLE 9 INDEMNITY - 9.1 Indemnification by the Company. The Company agrees to indemnify and save harmless the Purchaser from all losses, damages and expenses suffered or incurred by the Purchaser including all out-off pocket costs, legal...

AI summary Article 9 establishes mutual indemnification obligations between the Company and Purchaser for breaches, inaccuracies, or non-performance under the Agreement. The Company indemnifies the Purchaser for losses related to breaches, undisclosed liabilities, and representations, with a five-year survival period (except for certain warranties). The Purchaser similarly indemnifies the Company for breaches, with a five-year survival period.

10.1 Indelnnification p. p. 62
10.1 Indelnnification - (a) Each Party (an "Indemnitor") shall indemnify and hold harmless the other Party and the other rnernbers of its Group (each an "Indemnitee") from and against all losses, damages and liabilities suffered by the Ind...

AI summary Section 10.1 outlines indemnification obligations under the PPA, requiring parties to compensate each other for losses arising from wilful acts, negligence, or breach of obligations. NSPI and the Seller are liable for emissions-related claims and energy delivery-related liabilities, with procedural requirements for notice and defense of claims.

GC 23 DAMAGES AND MUTUAL RESPONSIBILITY p. p. 30
GC 23 DAMAGES AND MUTUAL RESPONSIBILITY - 23.1 The CONTRACTOR shall be responsible for the proper performance of the Work to the extent that the design and specifications, including the Technical Specifications and Drawings, permit such pe...

AI summary The section outlines mutual indemnification obligations between the CONTRACTOR and DEVELOPER, specifying that each must compensate the other for damages arising from their respective negligence. It also limits liability for consequential damages and sets interest rates for overdue payments.

N-3-(b)Redacted NSPI Response to UARB IR-12 (att 7-10) to IR-17 5 passages
Section 2345 p. p. 3
- .1 stantial completion of the work. - .2 (6) months following delivery to the Place of the Installation. - .2 Owner, through the Engineer, shall promptly give the Vendor notice in writing of observed defects and deficiencies that occur d...

AI summary The text outlines warranty obligations and factory test requirements for electrical equipment, including procedures for reporting defects, correcting issues, and assigning warranties. It also specifies testing standards for circuit breakers, current transformers, and bushings.

Section 2453 p. p. 3
- .2 CSA Standards - .1 C156.1, Ceramic and Glass Station Post Insulators - .2 G164, Hot Dipped Galvanized or Irregularly Shaped Articles - .3 W59, Welded Steel Construction (metal-ark welding) - .3 NEMA Standards - .1 Std. SG-6, Power Swi...

AI summary This document outlines the standards and submittal requirements for electrical components, including CSA, NEMA, ANSI/IEEE, and ISO standards, as well as specifications for operation and maintenance data and manufacturer drawings for disconnect switches.

1.9 Connection Transformer(s) p. pp. 80-81
2.1 The overall assembly enclosure(s) shall provide protection from ingress of rodents, insects, and moisture; and the possibility of arcing faults within the enclosure. - 1.12.2 The material for all external sides of the enclosure and int...

AI summary The document outlines technical specifications for the assembly enclosures, including protection against environmental factors, material requirements, grounding provisions, environmental control, and fire suppression capabilities.

9 IN-PLANT INSPECTION AND TESTING p. pp. 110-111
9 IN-PLANT INSPECTION AND TESTING - 9.1 The Owner, Purchaser, Engineer, and/or their authorized agents shall have the privilege of inspecting and witnessing all testing at all times during the manufacture of the equipment or materials orde...

AI summary This section outlines the requirements for in-plant inspection and testing during equipment manufacturing, including the right to inspect, advance notice requirements, and the submission of test results to the Engineer.

Section 3458 p. p. 160
- .8 Formwork: - .1 Forms: to CSA-A23.1, plywood and lumber, clean and free of loose knots, splits or metal. - .2 Form Ties: to CSA-A23.1, removable or snap-off metal ties, fixed or adjustable length. Form ties, tie wire, spacers or other...

AI summary The text outlines specifications for formwork and concrete mix, referencing various Canadian standards and testing methods. It details requirements for materials such as form ties, release agents, and curing compounds, as well as specifications for concrete mix proportions and air content.

06537Board Decision 1 passage
VI SUMMARY OF FINDINGS p. p. 0
VI SUMMARY OF FINDINGS [161] In general, the Board finds that the acquisition of the DWP by NSPI from 324 NSL is necessary, subject to a disallowance of a $1 million bonus payment to EUS due to non-compliance with the Code and inadequate e...

AI summary The Board finds that the acquisition of the DWP by NSPI from 324 NSL is necessary, despite non-compliance with the Code in certain aspects. A $1 million bonus payment to EUS is disallowed, and construction costs are reduced. The Board also accepts the economic analysis provided by NSPI and finds the transmission interconnection contract with EUS acceptable.

05495Redacted Information Requests issued by Board Staff (IR-1 to IR-17) 1 passage
Request IR-6:
nment Environmental Assessment Approval. - i. Please provide a copy of this approval dated August 24, 2009. - i. Page 12 of 50, Employment Matters Document: 182595 Date Filed: Oct. 14/10 Page 4 of 12 - i. The statement is made that "The Co...

AI summary The document requests information regarding the company's operations, specifically how it functions without employees and the human resources used for tasks like contract negotiation. It also asks for details on hourly rates and justification for fair market value.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →