Topic/Matter Intersection

Topic:"Lighting Technology" in M12451

Matter: Nova Scotia Power Inc. - 2026 General Rate Application (GRA)
14 passages 5 documents

Lighting Technology across all matters →

N-42026-2027 GRA PR 01-03 - Proposed Rates (Tariffs) 7 passages
AVAILABILITY p. pp. 44-45
AVAILABILITY This rate is available to all outdoor recreational lighting for the period May through October only.

AI summary The rate is available to all outdoor recreational lighting for the period May through October only.

(A) STREET AND AREA LIGHTING p. p. 45
(A) STREET AND AREA LIGHTING

AI summary The section titled '(A) STREET AND AREA LIGHTING' is part of a regulatory proceeding in Nova Scotia. However, no substantive content or details are provided in the given text to analyze further.

Availability p. pp. 45-163
Availability These rates shall be applicable to the supply, operation, and maintenance, or where indicated, operation and maintenance only, of street and area lighting. Except where otherwise indicated, the rates apply to fixtures operatin...

AI summary The rates apply to supply, operation, and maintenance of street and area lighting, excluding costs from vandalism, which are charged to the customer. Fixtures operate approximately 4,000 hours annually.

(1) Incandescent p. pp. 45-196
(1) Incandescent

AI summary This section titled 'Incandescent' appears in a Nova Scotia regulatory proceeding document. However, no substantive content, arguments, or entities are provided in the text beyond the heading, making further analysis impossible.

(3) Fluorescent p. p. 85
(3) Fluorescent

AI summary The section titled '(3) Fluorescent' is part of a regulatory proceeding in Nova Scotia. Key entities include Nova Scotia Power Inc. (NSPI), with acronyms for Fuel Adjustment Mechanism (FAM) and Demand Side Management Cost Recovery Rider (DCR). No further details or arguments are provided in the text.

AVAILABILITY p. p. 143
AVAILABILITY This rate is available to all outdoor recreational lighting for the period May through October only. Page 1 of 20 Note: Rates listed under 2023 and 2024 shall be in effect starting February 2 and January 1, respectively.

AI summary The rate is available for outdoor recreational lighting from May to October. Rates for 2023 and 2024 take effect on February 2 and January 1, respectively.

(A) STREET AND AREA LIGHTING p. p. 143
(A) STREET AND AREA LIGHTING

AI summary The section 'Street and Area Lighting' is referenced, but no specific content, arguments, or details are provided in the text. The context includes regulatory acronyms and entities relevant to Nova Scotia energy proceedings.

N-72026-2027 GRA Appendix 8A-G -Depreciation Study - Redacted 1 passage
Section 1761
158 Lighting in Yard Area 200's BUILDINGS AND STRUCTURES: 21 AUXILIARY STRUCTURES REMOVALS 320,550

AI summary The document text references lighting in the yard area and includes a line item for auxiliary structures removals under buildings and structures, with a cost of $320,550.

N-20NSPI (Bates White) RIR 1-20 - Redacted 1 passage
5 Figure 34: Residential End-Use Intensities p. pp. 60-61
5 Figure 34: Residential End-Use Intensities 6 7 4 8 The intensity trends are similar to those in prior forecasts. The use of heat pumps for space heating 9 is forecast to increase steadily throughout the forecast period including the conv...

AI summary The document discusses residential end-use intensities, highlighting trends such as increased use of heat pumps for space heating, decreased electric baseboard heating, and slow increases in electric water heating. Lighting and refrigeration show efficiency improvements, while the 'Other' category declines due to reduced EV sales and increased PV generation.

N-84Response to Undertaking U-17 4 passages
Section 109
ection is filed under subsection 93.4(4) or (5) of the Act. 4 (1) The Act is amended by adding the following after section 93.3: Definitions 93.4 (1) The following definitions apply in this section. FABI surplus, of a foreign affiliate (re...

AI summary The text outlines an amendment to the Act, specifically adding definitions under section 93.4. It defines FABI surplus in relation to a foreign affiliate, including specific conditions related to taxable surplus calculations under the Income Tax Regulations.

Section 415
ductible 248(1), but does not include a natural person or a part- par l’effet de la division 95(2)f.11)(ii)(D)) nership. (contribuable) sur le total des sommes dont chacune re- présente : transaction includes an arrangement or event. (opér...

AI summary The text outlines definitions related to tax regulations, including terms such as 'transaction,' 'transferred capacity,' and provisions under subsection 95(2)f.11)(ii)(D). It discusses revenue from interests and financing of affiliated companies and sums included under specific tax subdivisions.

Section 916
2 the foreign affiliate’s relevant affiliate écrit en vertu de la présente division selon les interest and financing expenses (as de- modalités réglementaires, fined in subsection 18.2(1)) (determined without regard to this clause and subs...

AI summary The text outlines specific financial calculations related to a foreign affiliate's interest and financing expenses, as well as foreign accrual property losses, under a regulatory framework. These calculations are determined without regard to certain subsections of the Income Tax Regulations.

Section 917
3 les dépenses d’intérêts et de finance- (determined without regard to this clause, ment de la société affiliée pertinentes clause (D) and subsection 18.2(19)) for the (au sens du paragraphe 18.2(1)) de la socié- taxation year, and té étra...

AI summary The text outlines the determination of interest and finance expenses of a foreign affiliate, excluding specific provisions, and references the foreign affiliate's foreign accrual property loss or income for the taxation year.

N-92Compliance Filing - Standardized Filings - Redacted 1 passage
Section 100
(42) DISTRIBUTION: (43) SUBSTATIONS 1,478 - - 1,444 - 34 (44) OVERHEAD LINES BEFORE STORM EXPENSES 33,736 - - 32,969 - 767 OVERHEAD LINES STORM EXPENSES 22,491 - - 21,979 - 511 (45) UNDERGROUND LINES 579 - - 566 - 13 (46) LINE TRANSFORMERS...

AI summary The document presents a detailed breakdown of distribution and customer operations expenses, including substation costs, overhead and underground line expenses, and street lighting. It also includes generation services and customer service costs, highlighting various line items and their associated figures.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →