HomeLoad ManagementM03097Evidence
Topic/Matter Intersection

Topic:"Load Management" in M03097

Matter: CI# 28098 - P-128.07 - NSPI WO -  Authority to Overspend the Tufts Cove 6 Waste Heat Recovery Project - $8,699,864Approximate value for approval of $8.5 million.
1 passage 1 document

Load Management across all matters →

N-3Redacted NSPI (NSUARB) IR-1 to IR-20 7/16/2010 1 passage
Preamble p. p. 181
When excluding loads, other than dead loads, results in a more critical loading condition, then such exclusion shall be considered. Unless recommended otherwise by the manufacturer/owner, following load factors shall be used with limit sta...

AI summary The text outlines requirements for load factors in structural design, emphasizing compliance with safety regulations and standards. It specifies load factors for lifting devices and references the NBCC and provincial codes for stability and sliding resistance.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →