NON-CONFIDENTIAL
p. p. 0
NON-CONFIDENTIAL 1 Response IR-4: (cont'd) 2 3 transfer 23 MVA from T63 onto 1H Water St, 4 transfer 13 MVA from T63 onto T62: 5 6 Based on these considerations, the revised load would be served as follows: 7 8 Kempt Road 9 104H-T61 =...
AI summary NSPI proposes transferring 23 MVA from T63 to 1H Water St and 13 MVA from T63 to T62, adjusting load distribution across substations. If all three transformers at Kempt Road fail, NSPI's plan would face capacity limitations due to feeder and substation constraints, requiring additional offloading.