N-4NSPI (NSEB) RIR-1 to RIR-6
1 passage
Extreme operating conditions: Where voltages lie outside the indicated limits for normal operating conditions, but within the indicated limits for 1 2 extreme operating conditions, improvement or corrective action should be taken. 21 ident...
AI summary The text discusses extreme operating conditions where voltages exceed normal limits, requiring corrective actions such as load transfer and reconductoring. NS Power completed load balancing in 2025 and may conduct further assessments in 2026. There is a request for information regarding the primary circuit's phase configuration and load balancing activities.
101771Board Decision Letter (redacted)
1 passage
itoring devices on each feeder. In response to IR-5, NS Power described its contingency plan to address power quality issues while awaiting the completion of the proposed capital projects, including: … transferring load to another supply a...
AI summary The Board acknowledges NS Power's contingency plan to address voltage issues on the 92H feeder due to overload. It directs NS Power to install voltage monitoring devices and submit a plan for their installation by June 30, 2026. The Board also notes that liability for equipment wear due to undervoltage is outside its jurisdiction.
Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →