Topic:"Load Management" in M12744

Matter: Nova Scotia Power Inc. - CI C0080102 – 92H-331 Double Circuit Peggy’s Cove Rd - $4,303,210
2 passages 1 document

Load Management across all matters →

N-1Work Order - Redacted 2 passages
Why do this project now? p. p. 1
Why do this project now? Feeder 92H-331 has a winter peak load beyond the 325 Amp, NS Power Capital Expenditure Justification Criteria (CEJC) and has experienced cold load pickup issues, as observed during the February 4, 2024 extreme cold...

AI summary Feeder 92H-331 exceeds NS Power's 325 Amp design criterion, faces cold load pickup issues, and has a 4% annual load growth rate. Adjacent feeders are also over capacity, limiting operational flexibility. A new feeder is proposed to reduce loading, improve voltage, and enhance reliability. The project is deemed in-service after infrastructure upgrades by July 2026, with a Final Cost Date in June 2027.

Preamble p. pp. 18-20
Figure 4: 92H-331 Load Forecast Figure 5: 92H-332 Load Forecast Figure 6: 92H-334 Load Forecast Figure 7: 137H-411 Load Forecast Figure 8: 137H-412 Load Forecast Figure 9: 137H-413 Load Forecast

AI summary The document contains multiple load forecasts labeled with reference numbers such as 92H-331, 92H-332, 137H-411, and 137H-413. These figures are presented on various pages and are likely used for regulatory analysis and planning purposes.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →